ULNRC-06972, Operating Quality Assurance Manual (Oqam), Revision 38

From kanterella
(Redirected from ULNRC-06972)
Jump to navigation Jump to search
Operating Quality Assurance Manual (Oqam), Revision 38
ML25343A251
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 12/09/2025
From: Karenina Scott
Ameren Missouri, Union Electric Co
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML25343A250 List:
References
ULNRC-06972
Download: ML25343A251 (0)


Text

Ni Ameren MISSOURI Callaway Plant December 9, 2025 ULNRC-06972 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.54(a) 10 CFR 50.71(e) 10 CFR Part 72 Subpart G Ladies and Gentlemen:

DOCKET NUMBER 50-483 and 72-1045 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPF-30 OPERATING QUALITY ASSURANCE MANUAL (OQAM) REVISION 38

References:

See page3 of this letter.

Pursuant to the requirements of 10 CFR 50.54(a), 10 CFR 50.71(e), and 10 CFR Part 72 Subpart G, enclosed is OQAM Revision 38. The OQAM has been revised to incorporate changes since OQAM Revision 37 was submitted via Reference 1.

OQAM Revision 38 incorporates OQAM Revisions 37a, 37b, 37c, and 37d which include OQAM Change Notices (OQQAMCNs)23-005, 23-004,24-002, 24-003, and 25-001, respectively. Descriptions and justifications for each OQAMCN are provided in. The mark-ups for each OQAM revision are provided in Attachment 2.

Finally, OQAM Rev. 38, with all changes incorporated, is provided in Attachment 3.

The OQAM continues to maintain its focus on activities affecting quality, consistent with importance to safety, including compliance with 10 CFR 50 Appendix B requirements.

This letter does not contain new commitments.

315 County Road 459:

Steedman, MO 65077: AmerenMissouri.com

ULNRC-06972 Page 2 of 5 If there are any questions, please contact Jeremy Custer, Nuclear Oversight Manager, at 573-489-8201.

l declare under penalty of perjury that the foregoing is true and correct.

t Scott Senior Vice President and Chief Nuclear Officer Executed on:

)2/09/z0oze ESS Attachments:

1. OQAM Revision 37a, 37b, 37c, and 37d Descriptions and Justifications
2. OQAM Revision 37a, 37b, 37c, and 37d Mark-ups
3. OQAM Revision 38

ULNRC-06972 Page 3 of 5

References:

1.

2.

Ameren Missouri Letter ULNRC-06855, Operating Quality Assurance Manual (OQAM) Revision 37, dated May 1, 2024. (ADAMS Accession No. ML24122B305)

NRC Safety Evaluation Letter, "Joseph M. Farley Nuclear Plant, Units 1 and 2, Edwin l. Hatch Nuclear Plant, Units 1 And 2, and Vogtle Electric Generating Plant, Units 1 and 2

- Safety Evaluation Re: Proposed Change to the Quality Assurance Program," dated June 17, 2005 (ADAMS Accession No. ML051570349)

NRC Safety Evaluation Letter, "Braidwood Station, Units 1 and 2; Byron Station, Unit Nos. 1 and 2; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Clinton Power Station, Unit No. 1; Dresden Nuclear Power Station, Units 1, 2, and 3; James A.

Fitzpatrick Nuclear Power Plant; Lasalle County Station, Units 1 and 2; Limerick Generating Station, Units 1 and 2; Nine Mile Point Nuclear Station, Units 1 and 2; Peach Bottom Atomic Power Station, Units 1, 2, and 3; Quad Cities Nuclear Power Station, Units 1 and 2; and R. E. Ginna Nuclear Power Plant

- Review of Quality Assurance Program Changes," dated 11/05/2020 (ADAMS Accession ML20287A130).

NRC Safety Evaluation Letter,

" Callaway Plant, Unit No. 1

- Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications," dated September 20, 2023 (ADAMS Accession ML23166B088)

ULNRC-06972 Page 4 of § Mr. John Monninger Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Director Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. M. Chawla Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8B1A Washington, DC 20555-0001

ULNRC-06972 Page 5 of 5 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 6500 West Freeway, Suite 400 Fort Worth, TX 76116 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

T. B. Elwood NSRB Secretary STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)

Ms. Kathleen McNelis (Public Service Commission)

Ms. Claire Eubanks (Public Service Commission)