Ameren MISSOUffi Callaway Plant August 15, 2019 ULNRC-06527 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.55a Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
RENEWED FACILITY OPERATING LICENSE NPF-30 OWNERS ACTIVITY REPORTS (OAR-i FORMS) FOR CYCLE/REFUEL 23 Please find enclosed the OwnerTs Activity Reports (OAR-I forms) for Cycle 23 and Refuel 23 activities at CailawayPlant. The reports are submitted pursuant to the provisions of the applicable revisions of ASME Boiler and Pressure Vessel Code Case N-532, Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission.
The OAR-I forms enclosed are associated with the following Cycle 23 and Refuel 23 activities at Callaway Plant:
I.
Inservice Inspection (151) and Repair/Replacement activities for the second period of the fourth 151 Program interval, and 2.
Containment Inservice Inspection pursuant to ASME Section XI, subsection IWE for the first period of the third IWE Program interval.
Each enclosed OAR-i form includes a listing of items with identified flaws or relevant conditions that required evaluation for continued service (Table 1) and an abstract of repair/replacement activities required for continued service (Table 2).
In accordance with Revision 1 of the Fourth Interval 1ST Program Plan, the OAR-1 form for the 151 and Repair/Replacement activities is submitted in accordance with Code Case N-532-5.
Similarly, in accordance with Revision 4 of the IWE Program Plan, the OAR-1 form for the Containment Inservice Inspection activities is submitted in accordance with Code Case N-532-5.
8315 County R:)ad 459 Steedman, 1VIO 65077 AmerenlVlissouri.com I
F
ULNRC-06527 August 15, 2019 Page 2 of 4 This letter does not contain new commitments.
If there are any questions, please contact Mr. Tom Elwood at 314-225-1905.
JPK/
Enclosure:
OAR-i forms (2)
Sincerely, j:i C. Wink Manager, Regulatory Affairs
ULNRC-06527 August 15, 2019 Page 3 of 4 cc:
Mr. Scott A. Morris Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. L. John Kios Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 09E3 Washington, DC 20555-0001 1Irf1flhIfl
ULNRC-06527 August 15, 2019 Page 4 of 4 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 6 100 Western Place, Suite 1050 Fort Worth, TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Other Situations ULNRC Distribution:
F. M. Diya T. E. Herrmann B. L. Cox F. J. Bianco S. P. Banker R. C. Wink T. B. Elwood I. C. Claunch L E. Eitel NSRB Secretary STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)
Missouri Public Service Commission I-JJj
- i I
El 700100 CALLAWAY NUCLEAR PLANT FORM OAR-I OWNERS ACTIVITY REPORT Report Number Plant Callaway Enerov Center, 8315 County Road 459, Steedman. MO 65077 Unit No.
1 Commercial service date 12/f 9/1 984 Refueling outage no.
23 (if applicable)
Current inspection interval 4th (fat, 2nd, 3rd, 4th, other)
Current inspection period fist, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plans 2007 Edition with 2008 Addenda Date and revision of inspection plans 3/18/2019. Rev. 001 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Same as inspection elan.
Code Cases used for inspection and evaluation:
N-532-5. N-661-2 and N-ZIG-I (if applicable, including cases modified by Case N532 and later revisions)
CERTIFICATE OF CONFORMANCE I certify that (a)the statements made in this report are correct; (b) the examinations and tests meet the tnspection Plan as requited by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of 23 (refueling outage number) conform to the requite of Section Xl.
bk Date
/3i4i r-::-E-CERTIFICATE OF tNSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by
_4c-9 2LEw jr Co of UTf Ce1
____ have inspected the items described in this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be l e n y m or any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
__z
Commission P 9
- CIT, Inspectors Signire (National Board Number and Endorsement)
Date t 3 Ah) (cS it c1 (06/11)
CALLAWAY NUCLEAR PLANT TABLE 1 ITEMS WiTH FLAWS OR RELEVANT CONDITIONS THAT REQUiRED EVALUATION FOR CONTINUED SERVICE Examination Category Item Description Evaluation Description and Item Number NONE
-4 S
- ::k:L-..
-[-
,I L
TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description of Work DateCompleted Repair/Replacement Plan Number 2
Heli-Coil Insert Install helical coil insert on atmospheric steam 10/2112017 16001113510 dump valve body-bonnet stud hole.
The traceability of the helical coil insert was not able to be verified.
CR 201 801 374 documents the non-conforming condition.
The non-conforming condition will be resolved by either validating the material traceability or by replacing with helical coil insert during the next refueling_outage.
ii 1!!
L
I
CALLAWAY NUCLEAR PLANT FORM OAR-I OWNERS ACTIVITY REPORT Report Number NED2O1 90032 Plant Callaway Energy Center, P. 0. Box 620, Fulton, MO 65251 Unit No.
I Commercial service date 12/19/1984 Refueling outage no.
23 (if applicable)
Current inspection interval 3rd (IWE Program) fist, 2nd, 3rd, 4th, other)
Current inspection period jst (IWE Program)
)lst, 2nd, 3rd)
Edition and Addenda of Section Xl applicable to the inspection plans 2007 Edition with 2008 Addenda (IWE Program)
Date and revision ofinspection plans IWE Program: 03/15/2018, Rev. 4 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans Same as Inspection plan Code Cases used N-532-5, N-765
)if applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of 23 (refueling outage number) conform to the requirements of Section Xl.
Signed Date L2Ø1. &
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by of have inspected the items described in this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/
replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commission Inspectors Signature National Board, State, Province, and Endorsements Date Page 7 of 8
CALLAWAY NUCLEAR PLANT I
- j TABLEI ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category Item Description Evaluation Description and Item Number None TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description of Work Date Completed Repair/Replacement Plan Number None I
I 1
jI; I
- i h
Page 8 of 8