ML17082A580
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/23/2017
From: Wink R
Ameren Missouri, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC MF8474, ULNRC-06357
Download: ML17082A580 (97)


Text

Callaway Plant March 23, 2017 ULNRC-06357 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.55a 10 CFR 50.36 Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPF-30 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION 2016 STEAM GENERATOR TUBE INSPECTIONS (TAC NO. MF8474)

By letter dated October 11, 2016 (ADAMS Accession No. ML16286A547) and pursuant to Callaway Plant Technical Specification 5.6.10, "Steam Generator Tube Inspection Report," Union Electric Company (dba Ameren Missouri), submitted information summarizing the 2016 steam generator tube inspections performed at Callaway Plant, Unit 1 during refueling outage 21.

During its review of the submitted report, the NRC staff determined that a request for additional information (RAI) was needed to complete its review. The NRC transmitted an RAI to Ameren Missouri in electronic form on February 7, 2017, and requested that the response be provided by March 3, 2017. This information was provided as an enclosure to Ameren Missouri letter ULNRC-06352, dated February 28, 2017.

The provided information was designated as proprietary by the provider, and accordingly, it was requested in the February 28, 2017 letter that the information be withheld pursuant to 10 CFR 2.390.

Subsequent to the February 28, 2017 submittal, however, and after consultation with the provider, it was determined that the provided information does not need to be considered proprietary and that withholding per 10 CFR 2.390 was unnecessary. Consequently, a non-proprietary version of the requested information has been received from the provider. The only change required to be made for the non-proprietary version was removal of the proprietary information notice that appeared as a note on the grid map pages included in the enclosure.

P.O. Box 620 : Fulton, MO 65251  : AmerenMissouri.com

ULNRC-06357 March 23, 2017 Page 2 of 4 This letter provides, herewith, the same information provided in the february 28, 2017 letter but without any request for withholding in light of confirming that the information is non-proprietary.

Therefore, this letter supersedes the transmittal made per Ameren Missouris February 28, 2017 letter.

The response to the RAI is thus provided in the Enclosure to this letter.

This letter does not contain new commitments. If there are questions, please contact Tom Elwood at 314-225-1905.

Sincerely, Manager, Regulatory Affairs DRB/

Enclosure:

Response to Request for Additional Information 2016 Steam Generator Tube Inspections

ULNRC-06357 March 23, 2017 Page 3 of 4 cc: Mr. Kriss M. Kennedy Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. L. John Klos Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8H4 Washington, DC 20555-0001

ULNRC-06357 March 23, 2017 Page 4 of 4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 6100 Western Place, Suite 1050 Fort Worth, TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

F. M. Diya T. E. Herrmann B. L. Cox R. C. Wink T. B. Elwood A. W. Alley Corporate Communications NSRB Secretary STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)

Missouri Public Service Commission

Response to Request for Additional Information - 2016 Steam Generator Tube Inspections Request:

Please provide a listing of all service induced indications that were recorded in the (Callaway Plant) steam generator eddy current inspections during refueling outage 21.

Response

The following pages list all service induced indications that were recorded in the (Callaway Plant) steam generator eddy current inspections during refueling outage 21.

Grid maps are also provided in order to provide a visual reference for the listing of service induced indications.

Page 1 of 93

GROUP TUBES avb_twd_0-9 39 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD <10%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Mon Apr 18 11:54:42 2016 Ameren: S/G A HOT AREVA S/G A TOTAL TUBES: 5872 HOT SELECTED TUBES: 39 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 2 of 93

AREVA NP Inc 04/18/16 11:55:23 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G A Page 1 of 2 AVB % TWD <10%

QUERY: QueryM1.qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== =========

54 120 0.11 136 P2 TWD 7 AV4 +0.07 TEC TEH 28 HOT 610HS 58 68 0.16 76 P2 TWD 9 AV3 -0.02 TEC TEH 20 HOT 610HS 0.07 120 P2 TWD 5 AV2 +0.05 TEC TEH 20 HOT 610HS 64 68 0.14 91 P2 TWD 9 AV3 -0.02 TEC TEH 20 HOT 610HS 69 35 0.11 149 P2 TWD 7 AV4 -0.02 TEC TEH 8 HOT 610HS 69 51 0.15 139 P2 TWD 9 AV4 +0.00 TEC TEH 7 HOT 610HS 71 89 0.14 110 P2 TWD 8 AV3 -0.05 TEC TEH 22 HOT 610HS 73 41 0.11 153 P2 TWD 7 AV4 -0.05 TEC TEH 9 HOT 610HS 74 96 0.15 52 P2 TWD 9 AV5 +0.00 TEC TEH 26 HOT 610HS 75 63 0.13 19 P2 TWD 8 AV3 +0.00 TEC TEH 4 HOT 610HS 77 77 0.16 128 P2 TWD 9 AV3 -0.14 TEC TEH 21 HOT 610HS 79 47 0.12 93 P2 TWD 7 AV2 +0.00 TEC TEH 6 HOT 610HS 81 45 0.11 122 P2 TWD 7 AV4 +0.00 TEC TEH 7 HOT 610HS 81 67 0.14 94 P2 TWD 8 AV4 +0.02 TEC TEH 5 HOT 610HS 0.14 53 P2 TWD 8 AV3 -0.02 TEC TEH 5 HOT 610HS 82 76 0.14 115 P2 TWD 8 AV5 -0.02 TEC TEH 3 HOT 610HS 85 35 0.13 143 P2 TWD 8 AV2 -0.02 TEC TEH 9 HOT 610HS 85 65 0.12 129 P2 TWD 8 AV6 +0.00 TEC TEH 3 HOT 610HS 0.15 147 P2 TWD 9 AV4 +0.00 TEC TEH 3 HOT 610HS 85 75 0.07 43 P2 TWD 4 AV5 -0.02 TEC TEH 3 HOT 610HS 85 81 0.16 82 P2 TWD 9 AV4 -0.02 TEC TEH 23 HOT 610HS 85 85 0.13 128 P2 TWD 8 AV2 +0.00 TEC TEH 23 HOT 610HS 87 61 0.14 77 P2 TWD 9 AV4 -0.02 TEC TEH 5 HOT 610HS 89 71 0.15 118 P2 TWD 9 AV5 +0.00 TEC TEH 3 HOT 610HS 90 68 0.16 94 P2 TWD 9 AV3 -0.05 TEC TEH 3 HOT 610HS 92 64 0.11 140 P2 TWD 7 AV1 +0.05 TEC TEH 2 HOT 610HS 92 72 0.13 72 P2 TWD 8 AV2 -0.05 TEC TEH 2 HOT 610HS 0.08 158 P2 TWD 5 AV5 +0.00 TEC TEH 2 HOT 610HS 93 55 0.16 133 P2 TWD 9 AV5 -0.05 TEC TEH 5 HOT 610HS 93 69 0.11 67 P2 TWD 7 AV4 -0.14 TEC TEH 3 HOT 610HS 0.14 99 P2 TWD 8 AV3 -0.05 TEC TEH 3 HOT 610HS 93 73 0.10 61 P2 TWD 6 AV4 -0.02 TEC TEH 3 HOT 610HS 0.11 117 P2 TWD 7 AV3 -0.05 TEC TEH 3 HOT 610HS 94 86 0.13 138 P2 TWD 8 AV3 -0.07 TEC TEH 22 HOT 610HS 95 65 0.12 100 P2 TWD 8 AV6 +0.07 TEC TEH 2 HOT 610HS 97 81 0.12 114 P2 TWD 7 AV1 -0.09 TEC TEH 23 HOT 610HS 98 76 0.08 121 P2 TWD 5 AV2 -0.02 TEC TEH 3 HOT 610HS 102 54 0.14 125 P2 TWD 9 AV6 -0.02 TEC TEH 7 HOT 610HS 106 64 0.15 83 P2 TWD 9 AV6 +0.09 TEC TEH 3 HOT 610HS 106 72 0.15 104 P2 TWD 9 AV5 -0.05 TEC TEH 3 HOT 610HS 108 74 0.16 141 P2 TWD 9 AV1 -0.02 TEC TEH 2 HOT 610HS 0.06 81 P2 TWD 4 AV2 -0.19 TEC TEH 2 HOT 610HS 109 69 0.13 137 P2 TWD 8 AV2 -0.02 TEC TEH 3 HOT 610HS 109 79 0.13 148 P2 TWD 8 AV1 -0.09 Page 3 of 93 TEC TEH 23 HOT 610HS

AREVA NP Inc 04/18/16 11:55:23 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G A Page 2 of 2 AVB % TWD <10%

QUERY: QueryM1.qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== =========

111 65 0.12 39 P2 TWD 7 AV2 -0.02 TEC TEH 3 HOT 610HS 111 71 0.15 88 P2 TWD 9 AV6 -0.02 TEC TEH 2 HOT 610HS 0.13 119 P2 TWD 8 AV5 -0.05 TEC TEH 2 HOT 610HS Total Tubes : 39 Total Records: 47 Page 4 of 93

GROUP TUBES avb_twd_0-9 39 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD <10%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Mon Apr 18 11:54:42 2016 Ameren: S/G A HOT AREVA S/G A TOTAL TUBES: 5872 HOT SELECTED TUBES: 39 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 5 of 93

GROUP TUBES avb_twd_10-19 50 Ameren - Callaway Unit 1 4/16 - 1R21 AVB%TWD 10-19%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Mon Apr 18 11:57:30 2016 Ameren: S/G A HOT AREVA S/G A TOTAL TUBES: 5872 HOT SELECTED TUBES: 50 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 6 of 93

AREVA NP Inc 04/18/16 11:59:27 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G A Page 1 of 2 AVB % TWD 10-19%

QUERY: QueryM1.qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== =========

58 68 0.36 126 P2 TWD 17 AV5 -0.02 TEC TEH 20 HOT 610HS 0.24 121 P2 TWD 13 AV4 +0.00 TEC TEH 20 HOT 610HS 60 64 0.31 92 P2 TWD 15 AV5 +0.00 TEC TEH 4 HOT 610HS 69 43 0.35 125 P2 TWD 17 AV4 -0.02 TEC TEH 9 HOT 610HS 71 79 0.23 119 P2 TWD 12 AV4 -0.02 TEC TEH 22 HOT 610HS 0.44 122 P2 TWD 19 AV3 +0.00 TEC TEH 22 HOT 610HS 73 41 0.33 93 P2 TWD 16 AV3 -0.02 TEC TEH 9 HOT 610HS 74 96 0.22 146 P2 TWD 12 AV4 +0.00 TEC TEH 26 HOT 610HS 0.18 110 P2 TWD 10 AV3 -0.05 TEC TEH 26 HOT 610HS 75 83 0.17 124 P2 TWD 10 AV2 -0.02 TEC TEH 22 HOT 610HS 77 51 0.19 145 P2 TWD 11 AV5 -0.02 TEC TEH 7 HOT 610HS 0.30 115 P2 TWD 15 AV4 -0.02 TEC TEH 7 HOT 610HS 0.27 121 P2 TWD 14 AV2 -0.02 TEC TEH 7 HOT 610HS 77 77 0.31 119 P2 TWD 15 AV5 -0.05 TEC TEH 21 HOT 610HS 78 88 0.26 97 P2 TWD 14 AV5 -0.05 TEC TEH 23 HOT 610HS 79 47 0.33 119 P2 TWD 16 AV4 -0.05 TEC TEH 6 HOT 610HS 0.43 124 P2 TWD 19 AV3 -0.05 TEC TEH 6 HOT 610HS 79 49 0.22 103 P2 TWD 12 AV2 -0.02 TEC TEH 7 HOT 610HS 79 53 0.28 100 P2 TWD 14 AV3 -0.02 TEC TEH 6 HOT 610HS 80 80 0.20 123 P2 TWD 11 AV4 +0.00 TEC TEH 22 HOT 610HS 0.20 120 P2 TWD 11 AV3 +0.05 TEC TEH 22 HOT 610HS 83 63 0.36 108 P2 TWD 17 AV5 -0.02 TEC TEH 5 HOT 610HS 83 67 0.19 121 P2 TWD 11 AV4 +0.00 TEC TEH 2 HOT 610HS 83 87 0.24 124 P2 TWD 13 AV4 +0.00 TEC TEH 22 HOT 610HS 84 82 0.26 141 P2 TWD 14 AV3 +0.00 TEC TEH 22 HOT 610HS 0.25 143 P2 TWD 13 AV2 -0.05 TEC TEH 22 HOT 610HS 85 65 0.27 103 P2 TWD 14 AV5 -0.05 TEC TEH 3 HOT 610HS 0.40 122 P2 TWD 18 AV3 -0.02 TEC TEH 3 HOT 610HS 85 75 0.20 102 P2 TWD 11 AV2 -0.05 TEC TEH 3 HOT 610HS 85 81 0.44 104 P2 TWD 19 AV3 -0.05 TEC TEH 23 HOT 610HS 0.25 127 P2 TWD 13 AV2 -0.05 TEC TEH 23 HOT 610HS 85 85 0.38 119 P2 TWD 18 AV3 -0.02 TEC TEH 23 HOT 610HS 86 84 0.36 129 P2 TWD 17 AV4 -0.05 TEC TEH 22 HOT 610HS 0.17 147 P2 TWD 10 AV2 +0.02 TEC TEH 22 HOT 610HS 87 79 0.32 143 P2 TWD 16 AV4 +0.00 TEC TEH 22 HOT 610HS 0.43 118 P2 TWD 19 AV3 -0.02 TEC TEH 22 HOT 610HS 88 66 0.23 104 P2 TWD 12 AV3 -0.02 TEC TEH 3 HOT 610HS 88 68 0.34 134 P2 TWD 16 AV3 -0.02 TEC TEH 2 HOT 610HS 92 64 0.33 122 P2 TWD 16 AV5 -0.05 TEC TEH 2 HOT 610HS 93 55 0.18 65 P2 TWD 10 AV4 -0.02 TEC TEH 5 HOT 610HS 93 65 0.27 136 P2 TWD 14 AV5 -0.05 TEC TEH 3 HOT 610HS 0.42 109 P2 TWD 19 AV3 -0.02 TEC TEH 3 HOT 610HS 0.21 89 P2 TWD 11 AV2 -0.02 TEC TEH 3 HOT 610HS 93 69 0.19 42 P2 TWD 11 AV6 -0.05 TEC TEH 3 HOT 610HS 0.17 82 P2 TWD 10 AV5 -0.07 TEC TEH 3 HOT 610HS 95 65 0.22 127 P2 TWD 12 AV5 -0.02 TEC TEH 2 HOT 610HS 95 73 0.17 121 P2 TWD 10 AV5 -0.05 TEC TEH 2 HOT 610HS 0.29 128 P2 TWD 15 AV3 +0.02 TEC TEH 2 HOT 610HS 0.30 114 P2 TWD 15 AV2 -0.02 Page 7 of 93 TEC TEH 2 HOT 610HS

AREVA NP Inc 04/18/16 11:59:27 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G A Page 2 of 2 AVB % TWD 10-19%

QUERY: QueryM1.qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== =========

96 70 0.20 55 P2 TWD 11 AV5 -0.05 TEC TEH 2 HOT 610HS 98 68 0.43 119 P2 TWD 19 AV4 -0.02 TEC TEH 3 HOT 610HS 98 84 0.33 135 P2 TWD 16 AV3 -0.05 TEC TEH 22 HOT 610HS 99 65 0.30 126 P2 TWD 15 AV6 -0.09 TEC TEH 2 HOT 610HS 102 66 0.19 83 P2 TWD 11 AV6 -0.02 TEC TEH 3 HOT 610HS 0.32 112 P2 TWD 16 AV5 -0.05 TEC TEH 3 HOT 610HS 104 64 0.37 105 P2 TWD 17 AV6 -0.05 TEC TEH 2 HOT 610HS 106 64 0.23 115 P2 TWD 12 AV5 +0.00 TEC TEH 3 HOT 610HS 106 72 0.22 111 P2 TWD 12 AV6 -0.02 TEC TEH 3 HOT 610HS 108 68 0.40 118 P2 TWD 18 AV5 +0.00 TEC TEH 2 HOT 610HS 0.25 96 P2 TWD 13 AV2 -0.05 TEC TEH 2 HOT 610HS 108 74 0.17 118 P2 TWD 10 AV6 -0.02 TEC TEH 2 HOT 610HS 0.27 119 P2 TWD 14 AV3 -0.05 TEC TEH 2 HOT 610HS 109 61 0.34 71 P2 TWD 17 AV5 -0.07 TEC TEH 4 HOT 610HS 109 67 0.17 93 P2 TWD 10 AV4 -0.05 TEC TEH 2 HOT 610HS 0.21 107 P2 TWD 12 AV1 -0.07 TEC TEH 2 HOT 610HS 109 69 0.21 120 P2 TWD 11 AV4 -0.05 TEC TEH 3 HOT 610HS 110 66 0.18 135 P2 TWD 10 AV5 +0.00 TEC TEH 3 HOT 610HS 110 68 0.17 107 P2 TWD 10 AV1 -0.09 TEC TEH 3 HOT 610HS 111 63 0.17 82 P2 TWD 10 AV2 -0.19 TEC TEH 4 HOT 610HS 111 65 0.31 119 P2 TWD 15 AV6 +0.12 TEC TEH 3 HOT 610HS 111 73 0.19 94 P2 TWD 11 AV4 -0.02 TEC TEH 2 HOT 610HS Total Tubes : 50 Total Records: 71 Page 8 of 93

GROUP TUBES avb_twd_10-19 50 Ameren - Callaway Unit 1 4/16 - 1R21 AVB%TWD 10-19%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Mon Apr 18 11:57:30 2016 Ameren: S/G A HOT AREVA S/G A TOTAL TUBES: 5872 HOT SELECTED TUBES: 50 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 9 of 93

GROUP TUBES avb_twd_20-29 23 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 20-29%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Mon Apr 18 12:02:27 2016 Ameren: S/G A HOT AREVA S/G A TOTAL TUBES: 5872 HOT SELECTED TUBES: 23 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 10 of 93

AREVA NP Inc 04/18/16 12:03:04 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G A Page 1 of 1 AVB % TWD 20-29%

QUERY: QueryM1.qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== =========

69 43 0.51 117 P2 TWD 21 AV3 +0.00 TEC TEH 9 HOT 610HS 75 83 0.59 122 P2 TWD 23 AV5 -0.02 TEC TEH 22 HOT 610HS 0.65 121 P2 TWD 24 AV4 +0.00 TEC TEH 22 HOT 610HS 0.59 132 P2 TWD 23 AV3 +0.02 TEC TEH 22 HOT 610HS 77 51 0.53 136 P2 TWD 22 AV3 +0.00 TEC TEH 7 HOT 610HS 77 77 0.63 118 P2 TWD 24 AV4 +0.00 TEC TEH 21 HOT 610HS 78 88 0.47 101 P2 TWD 20 AV4 -0.05 TEC TEH 23 HOT 610HS 81 85 0.44 117 P2 TWD 20 AV4 -0.02 TEC TEH 23 HOT 610HS 0.81 115 P2 TWD 27 AV3 -0.05 TEC TEH 23 HOT 610HS 0.48 108 P2 TWD 21 AV2 +0.00 TEC TEH 23 HOT 610HS 82 76 0.84 119 P2 TWD 28 AV4 -0.02 TEC TEH 3 HOT 610HS 83 67 0.82 122 P2 TWD 27 AV2 -0.02 TEC TEH 2 HOT 610HS 85 65 0.49 127 P2 TWD 21 AV2 -0.02 TEC TEH 3 HOT 610HS 86 84 0.55 131 P2 TWD 22 AV3 +0.00 TEC TEH 22 HOT 610HS 92 64 0.92 122 P2 TWD 29 AV3 -0.02 TEC TEH 2 HOT 610HS 0.74 125 P2 TWD 26 AV2 +0.00 TEC TEH 2 HOT 610HS 92 72 0.65 125 P2 TWD 24 AV4 +0.00 TEC TEH 2 HOT 610HS 93 65 0.45 113 P2 TWD 20 AV4 -0.02 TEC TEH 3 HOT 610HS 98 68 0.75 129 P2 TWD 26 AV5 +0.00 TEC TEH 3 HOT 610HS 98 84 0.56 123 P2 TWD 22 AV2 -0.05 TEC TEH 22 HOT 610HS 99 65 0.69 128 P2 TWD 25 AV5 -0.05 TEC TEH 2 HOT 610HS 104 64 0.52 127 P2 TWD 22 AV5 -0.07 TEC TEH 2 HOT 610HS 108 68 0.66 125 P2 TWD 25 AV4 +0.00 TEC TEH 2 HOT 610HS 0.87 121 P2 TWD 28 AV3 +0.00 TEC TEH 2 HOT 610HS 108 74 0.83 111 P2 TWD 27 AV4 -0.05 TEC TEH 2 HOT 610HS 109 61 0.81 92 P2 TWD 27 AV6 -0.07 TEC TEH 4 HOT 610HS 109 67 0.70 121 P2 TWD 25 AV6 -0.05 TEC TEH 2 HOT 610HS 0.89 118 P2 TWD 28 AV5 -0.02 TEC TEH 2 HOT 610HS 0.89 124 P2 TWD 28 AV3 -0.02 TEC TEH 2 HOT 610HS 110 68 0.77 126 P2 TWD 27 AV2 -0.07 TEC TEH 3 HOT 610HS 111 73 0.89 128 P2 TWD 28 AV6 +0.00 TEC TEH 2 HOT 610HS 0.47 129 P2 TWD 20 AV5 -0.02 TEC TEH 2 HOT 610HS 0.72 117 P2 TWD 26 AV3 -0.02 TEC TEH 2 HOT 610HS 0.95 124 P2 TWD 29 AV2 +0.00 TEC TEH 2 HOT 610HS Total Tubes : 23 Total Records: 34 Page 11 of 93

GROUP TUBES avb_twd_20-29 23 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 20-29%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Mon Apr 18 12:02:27 2016 Ameren: S/G A HOT AREVA S/G A TOTAL TUBES: 5872 HOT SELECTED TUBES: 23 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 12 of 93

GROUP TUBES avb_twd_30-39 7 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 30-39 %

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Mon Apr 18 12:12:51 2016 Ameren: S/G A HOT AREVA S/G A TOTAL TUBES: 5872 HOT SELECTED TUBES: 7 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 13 of 93

AREVA NP Inc 04/18/16 12:13:13 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G A Page 1 of 1 AVB % TWD 30-39%

QUERY: QueryM1.qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== =========

82 76 1.14 109 P2 TWD 31 AV3 +0.00 TEC TEH 3 HOT 610HS 83 67 1.09 123 P2 TWD 31 AV3 -0.02 TEC TEH 2 HOT 610HS 92 64 1.17 118 P2 TWD 32 AV4 -0.02 TEC TEH 2 HOT 610HS 92 72 1.16 125 P2 TWD 32 AV3 +0.00 TEC TEH 2 HOT 610HS 108 74 1.16 118 P2 TWD 32 AV5 -0.05 TEC TEH 2 HOT 610HS 109 67 1.25 119 P2 TWD 33 AV2 -0.05 TEC TEH 2 HOT 610HS 110 68 1.08 122 P2 TWD 31 AV4 -0.02 TEC TEH 3 HOT 610HS 1.09 106 P2 TWD 31 AV3 -0.05 TEC TEH 3 HOT 610HS Total Tubes : 7 Total Records: 8 Page 14 of 93

GROUP TUBES avb_twd_30-39 7 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 30-39 %

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Mon Apr 18 12:12:51 2016 Ameren: S/G A HOT AREVA S/G A TOTAL TUBES: 5872 HOT SELECTED TUBES: 7 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 15 of 93

AREVA NP Inc 04/18/16 12:17:18 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G A Page 1 of 1 AVB % TWD >= 40%

QUERY: QueryM1.qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== =========

Total Tubes : 0 Total Records: 0 Page 16 of 93

GROUP TUBES A QueryM1 36 Ameren - Callaway Unit 1 4/16 - 1R21 TSP %TWD < 10%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:01:33 2016 Ameren: S/G A HOT AREVA S/G A TOTAL TUBES: 5872 HOT SELECTED TUBES: 36 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 17 of 93

AREVA NP Inc 04/19/16 02:58:45 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G A Page 1 of 1 TSP %TWD < 10%

QUERY: QueryM1.qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

1 15 0.29 108 P4 TWD 9 07C -0.59 07C 07C WAR 1_Land 12 COLD 610PP 6 63 123 0.30 104 P4 TWD 9 05H +0.35 05H 05H WAR 1_Land 65 HOT 610PP 26 69 119 0.21 103 P4 TWD 6 05H +0.32 05H 05H WAR 1_Land 65 HOT 610PP 25 79 115 0.22 111 P4 TWD 6 04H +0.35 04H 04H WAR 1_Land 65 HOT 610PP 24 80 114 0.24 114 P4 TWD 7 04H -0.59 04H 04H WAR 2_Land 65 HOT 610PP 23 0.16 284 P4 TWD 4 05H +0.37 05H 05H WAR 2_Land 65 HOT 610PP 23 0.26 98 P4 TWD 8 05H +0.35 05H 05H WAR 2_Land 65 HOT 610PP 23 0.16 90 P4 TWD 4 06H -0.83 06H 06H WAR 2_Land 65 HOT 610PP 23 81 105 0.21 98 P4 TWD 6 06H -0.69 06H 06H WAR 1_Land 65 HOT 610PP 22 84 26 0.16 105 P4 TWD 4 05C +0.37 05C 05C WAR 1_Land 8 COLD 610PP 6 89 27 0.28 269 P4 TWD 8 06C -0.80 06C 06C WAR 1_Land 8 COLD 610PP 9 91 29 0.27 105 P4 TWD 8 05H +0.43 05H 05H WAR 1_Land 65 HOT 610PP 28 91 101 0.29 102 P4 TWD 9 05C +0.37 05C 05C WAR 1_Land 7 COLD 610PP 60 91 107 0.26 112 P4 TWD 8 06C -0.59 06C 06C WAR 1_Land 7 COLD 610PP 61 92 30 0.20 112 P4 TWD 6 05C -0.67 05C 05C WAR 2_Land 7 COLD 610PP 21 0.27 102 P4 TWD 8 05C +0.43 05C 05C WAR 2_Land 7 COLD 610PP 21 93 31 0.22 106 P4 TWD 6 05H +0.40 05H 05H WAR 1_Land 65 HOT 610PP 27 94 34 0.24 289 P4 TWD 7 05C +0.37 05C 05C WAR 1_Land 7 COLD 610PP 26 96 92 0.20 88 P4 TWD 6 06H -0.72 06H 06H WAR 1_Land 65 HOT 610PP 20 97 39 0.18 100 P4 TWD 5 05H +0.43 05H 05H WAR 1_Land 65 HOT 610PP 29 0.18 112 P4 TWD 5 05H -0.54 05H 05H WAR 1_LAND 65 HOT 610PP 29 98 36 0.23 273 P4 TWD 7 06C -0.85 06C 06C WAR 1_Land 7 COLD 610PP 41 100 46 0.25 109 P4 TWD 7 05C +0.45 05C 05C WAR 1_Land 7 COLD 610PP 15 100 68 0.25 103 P4 TWD 7 05H +0.40 05H 05H WAR 1_Land 65 HOT 610PP 9 101 39 0.20 268 P4 TWD 6 06C -0.56 06C 06C WAR 2_Land 7 COLD 610PP 14 0.24 103 P4 TWD 7 06C +0.32 06C 06C WAR 2_Land 7 COLD 610PP 14 102 74 0.19 92 P4 TWD 5 04C +0.45 04C 04C WAR 1_Land 7 COLD 610PP 57 102 96 0.10 98 P4 TWD 3 06H -0.69 06H 06H WAR 1_Land 65 HOT 610PP 21 104 94 0.27 87 P4 TWD 8 06C -0.67 06C 06C WAR 1_Land 7 COLD 610PP 59 105 91 0.24 108 P4 TWD 7 05H -0.64 05H 05H WAR 1_Land 65 HOT 610PP 19 0.15 85 P4 TWD 4 06H -0.77 06H 06H WAR 1_Land 65 HOT 610PP 19 108 84 0.25 101 P4 TWD 7 06H -0.67 06H 06H WAR 1_Land 65 HOT 610PP 17 109 75 0.28 288 P4 TWD 8 06H -0.64 06H 06H WAR 1_Land 65 HOT 610PP 13 109 83 0.27 105 P4 TWD 8 04H +0.37 04H 04H WAR 1_Land 65 HOT 610PP 16 110 66 0.20 105 P4 TWD 6 06C +0.43 06C 06C WAR 1_Land 7 COLD 610PP 54 110 74 0.14 268 P4 TWD 4 06C -0.67 06C 06C WAR 1_Land 7 COLD 610PP 56 110 76 0.27 120 P4 TWD 8 06H -0.64 06H 06H WAR 1_Land 65 HOT 610PP 14 0.28 282 P4 TWD 8 05H +0.35 05H 05H WAR 1_Land 65 HOT 610PP 14 110 80 0.29 103 P4 TWD 9 06H +0.32 06H 06H WAR 1_Land 65 HOT 610PP 15 111 73 0.19 108 P4 TWD 5 06C -0.61 06C 06C WAR 1_Land 7 COLD 610PP 55 111 79 0.17 288 P4 TWD 5 05C -0.64 05C 05C WAR 2_Land 7 COLD 610PP 58 0.22 111 P4 TWD 6 06C -0.59 06C 06C WAR 3_Land 7 COLD 610PP 58 0.23 281 P4 TWD 7 06C -0.61 06C 06C WAR 3_Land 7 COLD 610PP 58 0.20 95 P4 TWD 6 06C +0.45 06C 06C WAR 3_Land 7 COLD 610PP 58 113 65 0.20 271 P4 TWD 6 04C +0.53 04C 04C WAR 1_Land 7 COLD 610PP 52 113 71 0.15 277 P4 TWD 4 06H -0.69 06H 06H WAR 1_Land 65 HOT 610PP 10 113 73 0.21 120 P4 TWD 6 06H -0.64 06H 06H WAR 1_Land 65 HOT 610PP 12 Total Tubes : 36 Total Records: 47 Page 18 of 93

GROUP TUBES A QueryM1 36 Ameren - Callaway Unit 1 4/16 - 1R21 TSP %TWD < 10%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:01:33 2016 Ameren: S/G A HOT AREVA S/G A TOTAL TUBES: 5872 HOT SELECTED TUBES: 36 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 19 of 93

GROUP TUBES A QueryM1 8 Ameren - Callaway Unit 1 4/16 - 1R21 TSP %TWD 10-19%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:05:31 2016 Ameren: S/G A HOT AREVA S/G A TOTAL TUBES: 5872 HOT SELECTED TUBES: 8 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 20 of 93

AREVA NP Inc 04/19/16 03:03:06 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G A Page 1 of 1 TSP %TWD 10-19%

QUERY: QueryM1.qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

71 119 0.33 277 P4 TWD 10 06C -0.67 06C 06C WAR 1_Land 7 COLD 610PP 64 80 114 0.36 100 P4 TWD 11 04H +0.40 04H 04H WAR 2_Land 65 HOT 610PP 23 0.36 101 P4 TWD 11 06H +0.27 06H 06H WAR 2_Land 65 HOT 610PP 23 81 23 0.38 113 P4 TWD 11 05C -0.69 05C 05C WAR 1_Land 8 COLD 610PP 7 86 26 0.39 101 P4 TWD 12 06C +0.35 06C 06C WAR 1_Land 8 COLD 610PP 8 97 35 0.35 270 P4 TWD 11 06C -0.69 06C 06C WAR 1_Land 7 COLD 610PP 38 102 74 0.34 100 P4 TWD 10 05H +0.37 05H 05H WAR 1_Land 65 HOT 610PP 11 107 85 0.50 104 P4 TWD 17 06H +0.35 06H 06H WAR 1_Land 65 HOT 610PP 18 111 79 0.36 98 P4 TWD 11 05C +0.40 05C 05C WAR 2_Land 7 COLD 610PP 58 Total Tubes : 8 Total Records: 9 Page 21 of 93

GROUP TUBES A QueryM1 8 Ameren - Callaway Unit 1 4/16 - 1R21 TSP %TWD 10-19%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:05:31 2016 Ameren: S/G A HOT AREVA S/G A TOTAL TUBES: 5872 HOT SELECTED TUBES: 8 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 22 of 93

AREVA NP Inc 04/19/16 03:06:36 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G A Page 1 of 1 TSP %TWD 20-29%

QUERY: QueryM1.qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

Total Tubes : 0 Total Records: 0 Page 23 of 93

AREVA NP Inc 04/19/16 03:07:38 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G A Page 1 of 1 TSP %TWD 30-39%

QUERY: QueryM1.qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

Total Tubes : 0 Total Records: 0 Page 24 of 93

AREVA NP Inc 04/19/16 03:08:49 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G A Page 1 of 1 TSP %TWD 40-100%

QUERY: QueryM1.qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

Total Tubes : 0 Total Records: 0 Page 25 of 93

GROUP TUBES A QueryM1[1] 27 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD < 10%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:36:34 2016 Ameren: S/G B HOT AREVA S/G B TOTAL TUBES: 5872 HOT SELECTED TUBES: 27 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 26 of 93

AREVA NP Inc 04/19/16 04:06:54 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G B Page 1 of 1 AVB %TWD < 10%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

27 79 0.12 154 P2 TWD 8 AV5 +0.49 TEC TEH 32 HOT 610HS 169 52 76 0.13 89 P2 TWD 8 AV4 -0.19 TEC TEH 19 HOT 610HS 105 61 77 0.16 141 P2 TWD 9 AV3 -0.05 TEC TEH 20 HOT 610HS 104 62 54 0.12 120 P2 TWD 7 AV5 -0.07 TEC TEH 3 HOT 610HS 183 65 67 0.14 122 P2 TWD 8 AV5 +0.05 TEC TEH 4 HOT 610HS 10 0.12 59 P2 TWD 7 AV2 -0.02 TEC TEH 4 HOT 610HS 10 67 87 0.10 31 P2 TWD 6 AV4 +0.00 TEC TEH 23 HOT 610HS 57 68 80 0.11 52 P2 TWD 7 AV3 +0.00 TEC TEH 19 HOT 610HS 159 73 51 0.15 82 P2 TWD 9 AV4 +0.02 TEC TEH 6 HOT 610HS 21 73 65 0.15 36 P2 TWD 9 AV5 -0.05 TEC TEH 4 HOT 610HS 32 76 74 0.14 116 P2 TWD 8 AV3 -0.05 TEC TEH 1 HOT 610HS 85 77 73 0.14 49 P2 TWD 9 AV2 -0.05 TEC TEH 2 HOT 610HS 86 80 44 0.13 136 P2 TWD 8 AV3 -0.05 TEC TEH 6 HOT 610HS 123 80 66 0.16 119 P2 TWD 9 AV6 -0.10 TEC TEH 1 HOT 610HS 43 0.12 143 P2 TWD 7 AV5 -0.02 TEC TEH 1 HOT 610HS 43 82 74 0.15 107 P2 TWD 9 AV3 -0.02 TEC TEH 2 HOT 610HS 88 83 75 0.16 144 P2 TWD 9 AV4 +0.00 TEC TEH 1 HOT 610HS 94 0.13 153 P2 TWD 8 AV2 -0.02 TEC TEH 1 HOT 610HS 94 0.04 163 P2 TWD 3 AV5 +0.00 TEC TEH 1 HOT 610HS 94 84 54 0.14 137 P2 TWD 8 AV4 -0.07 TEC TEH 3 HOT 610HS 172 0.11 129 P2 TWD 7 AV3 -0.05 TEC TEH 3 HOT 610HS 172 84 76 0.15 133 P2 TWD 9 AV3 +0.00 TEC TEH 1 HOT 610HS 98 89 63 0.15 60 P2 TWD 9 AV4 -0.05 TEC TEH 2 HOT 610HS 30 90 68 0.10 40 P2 TWD 6 AV4 -0.05 TEC TEH 2 HOT 610HS 57 0.11 85 P2 TWD 7 AV3 -0.05 TEC TEH 2 HOT 610HS 57 95 69 0.15 136 P2 TWD 9 AV3 -0.07 TEC TEH 1 HOT 610HS 59 95 79 0.13 128 P2 TWD 8 AV6 -0.05 TEC TEH 20 HOT 610HS 135 97 69 0.07 18 P2 TWD 5 AV4 +0.02 TEC TEH 2 HOT 610HS 59 97 81 0.12 86 P2 TWD 7 AV3 -0.02 TEC TEH 20 HOT 610HS 166 98 56 0.13 27 P2 TWD 8 AV5 -0.02 TEC TEH 4 HOT 610HS 137 100 58 0.12 136 P2 TWD 7 AV5 -0.07 TEC TEH 4 HOT 610HS 106 103 63 0.13 142 P2 TWD 8 AV6 -0.07 TEC TEH 3 HOT 610HS 57 111 71 0.11 45 P2 TWD 7 AV3 +0.09 TEC TEH 19 HOT 610HS 50 0.15 148 P2 TWD 9 AV2 -0.02 TEC TEH 19 HOT 610HS 50 Total Tubes : 27 Total Records: 34 Page 27 of 93

GROUP TUBES A QueryM1[1] 27 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD < 10%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:36:34 2016 Ameren: S/G B HOT AREVA S/G B TOTAL TUBES: 5872 HOT SELECTED TUBES: 27 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 28 of 93

GROUP TUBES A QueryM1[1] 30 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 10-19%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:38:45 2016 Ameren: S/G B HOT AREVA S/G B TOTAL TUBES: 5872 HOT SELECTED TUBES: 30 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 29 of 93

AREVA NP Inc 04/19/16 04:06:17 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G B Page 1 of 1 AVB %TWD 10-19%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

61 67 0.30 105 P2 TWD 15 AV2 -0.02 TEC TEH 4 HOT 610HS 9 65 67 0.20 144 P2 TWD 11 AV3 -0.05 TEC TEH 4 HOT 610HS 10 68 58 0.38 131 P2 TWD 18 AV3 -0.05 TEC TEH 3 HOT 610HS 116 68 96 0.18 149 P2 TWD 10 AV4 -0.05 TEC TEH 26 HOT 610HS 18 0.18 90 P2 TWD 10 AV3 -0.05 TEC TEH 26 HOT 610HS 18 75 51 0.37 112 P2 TWD 18 AV3 -0.05 TEC TEH 5 HOT 610HS 21 76 68 0.28 128 P2 TWD 14 AV6 +0.00 TEC TEH 1 HOT 610HS 53 0.33 140 P2 TWD 16 AV5 +0.00 TEC TEH 1 HOT 610HS 53 76 74 0.18 81 P2 TWD 11 AV4 -0.02 TEC TEH 1 HOT 610HS 85 77 67 0.40 127 P2 TWD 18 AV6 -0.12 TEC TEH 2 HOT 610HS 54 0.39 124 P2 TWD 18 AV3 -0.02 TEC TEH 2 HOT 610HS 54 77 73 0.28 108 P2 TWD 14 AV4 -0.02 TEC TEH 2 HOT 610HS 86 77 87 0.41 114 P2 TWD 19 AV4 -0.05 TEC TEH 24 HOT 610HS 58 0.32 104 P2 TWD 16 AV2 -0.02 TEC TEH 24 HOT 610HS 58 78 66 0.23 88 P2 TWD 12 AV6 -0.10 TEC TEH 2 HOT 610HS 45 0.29 109 P2 TWD 15 AV5 -0.07 TEC TEH 2 HOT 610HS 45 80 66 0.30 116 P2 TWD 15 AV3 -0.05 TEC TEH 1 HOT 610HS 43 0.18 50 P2 TWD 10 AV2 -0.02 TEC TEH 1 HOT 610HS 43 82 74 0.25 107 P2 TWD 13 AV4 -0.02 TEC TEH 2 HOT 610HS 88 83 75 0.30 81 P2 TWD 15 AV3 +0.00 TEC TEH 1 HOT 610HS 94 84 56 0.32 124 P2 TWD 16 AV4 -0.02 TEC TEH 3 HOT 610HS 142 0.24 130 P2 TWD 13 AV3 +0.00 TEC TEH 3 HOT 610HS 142 84 72 0.33 126 P2 TWD 16 AV3 -0.07 TEC TEH 1 HOT 610HS 76 85 77 0.20 72 P2 TWD 11 AV4 -0.02 TEC TEH 2 HOT 610HS 106 0.30 55 P2 TWD 15 AV2 -0.05 TEC TEH 2 HOT 610HS 106 86 64 0.27 113 P2 TWD 14 AV5 -0.05 TEC TEH 2 HOT 610HS 36 88 88 0.28 124 P2 TWD 14 AV2 -0.05 TEC TEH 23 HOT 610HS 72 89 63 0.22 62 P2 TWD 12 AV5 +0.00 TEC TEH 2 HOT 610HS 30 0.37 135 P2 TWD 17 AV2 -0.02 TEC TEH 2 HOT 610HS 30 89 73 0.30 65 P2 TWD 15 AV4 -0.05 TEC TEH 2 HOT 610HS 83 90 60 0.34 119 P2 TWD 16 AV4 -0.02 TEC TEH 2 HOT 610HS 15 0.26 115 P2 TWD 14 AV2 +0.02 TEC TEH 2 HOT 610HS 15 95 57 0.44 145 P2 TWD 19 AV3 -0.05 TEC TEH 3 HOT 610HS 132 95 69 0.21 91 P2 TWD 12 AV4 -0.02 TEC TEH 1 HOT 610HS 59 95 79 0.26 131 P2 TWD 14 AV5 -0.02 TEC TEH 20 HOT 610HS 135 0.28 137 P2 TWD 15 AV3 -0.02 TEC TEH 20 HOT 610HS 135 0.18 116 P2 TWD 10 AV2 +0.00 TEC TEH 20 HOT 610HS 135 97 55 0.17 105 P2 TWD 10 AV2 -0.02 TEC TEH 4 HOT 610HS 160 97 69 0.29 96 P2 TWD 15 AV2 +0.00 TEC TEH 2 HOT 610HS 59 97 81 0.24 114 P2 TWD 13 AV4 +0.02 TEC TEH 20 HOT 610HS 166 98 72 0.21 121 P2 TWD 12 AV5 -0.05 TEC TEH 19 HOT 610HS 54 103 67 0.17 140 P2 TWD 10 AV4 +0.00 TEC TEH 3 HOT 610HS 15 Total Tubes : 30 Total Records: 42 Page 30 of 93

GROUP TUBES A QueryM1[1] 30 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 10-19%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:38:45 2016 Ameren: S/G B HOT AREVA S/G B TOTAL TUBES: 5872 HOT SELECTED TUBES: 30 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 31 of 93

GROUP TUBES A QueryM1 14 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 20-29%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 11:12:13 2016 Ameren: S/G B HOT AREVA S/G B TOTAL TUBES: 5872 HOT SELECTED TUBES: 14 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 32 of 93

AREVA NP Inc 04/19/16 04:05:31 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G B Page 1 of 1 AVB %TWD 20-29%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

68 58 0.46 127 P2 TWD 20 AV4 -0.02 TEC TEH 3 HOT 610HS 116 76 68 0.71 125 P2 TWD 26 AV4 -0.02 TEC TEH 1 HOT 610HS 53 0.82 121 P2 TWD 27 AV3 -0.05 TEC TEH 1 HOT 610HS 53 0.76 113 P2 TWD 26 AV2 -0.05 TEC TEH 1 HOT 610HS 53 77 67 0.67 123 P2 TWD 25 AV4 +0.00 TEC TEH 2 HOT 610HS 54 77 73 0.57 122 P2 TWD 23 AV3 -0.02 TEC TEH 2 HOT 610HS 86 77 87 0.48 131 P2 TWD 20 AV3 -0.02 TEC TEH 24 HOT 610HS 58 78 66 0.61 96 P2 TWD 24 AV3 +0.00 TEC TEH 2 HOT 610HS 45 81 67 0.46 124 P2 TWD 20 AV5 +0.00 TEC TEH 2 HOT 610HS 53 0.71 117 P2 TWD 26 AV4 -0.05 TEC TEH 2 HOT 610HS 53 0.60 100 P2 TWD 23 AV3 -0.02 TEC TEH 2 HOT 610HS 53 85 77 0.67 116 P2 TWD 25 AV3 -0.02 TEC TEH 2 HOT 610HS 106 86 64 0.60 126 P2 TWD 23 AV4 -0.02 TEC TEH 2 HOT 610HS 36 0.74 116 P2 TWD 26 AV3 -0.02 TEC TEH 2 HOT 610HS 36 88 88 0.92 128 P2 TWD 29 AV4 -0.02 TEC TEH 23 HOT 610HS 72 0.59 121 P2 TWD 23 AV3 -0.02 TEC TEH 23 HOT 610HS 72 89 63 0.88 135 P2 TWD 28 AV3 -0.02 TEC TEH 2 HOT 610HS 30 90 60 0.55 120 P2 TWD 22 AV3 -0.02 TEC TEH 2 HOT 610HS 15 95 57 0.48 133 P2 TWD 21 AV5 -0.07 TEC TEH 3 HOT 610HS 132 97 69 0.62 109 P2 TWD 24 AV3 -0.05 TEC TEH 2 HOT 610HS 59 Total Tubes : 14 Total Records: 20 Page 33 of 93

GROUP TUBES A QueryM1[1] 14 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 20-29%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:40:50 2016 Ameren: S/G B HOT AREVA S/G B TOTAL TUBES: 5872 HOT SELECTED TUBES: 14 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 34 of 93

GROUP TUBES A QueryM1[1] 1 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 30-39%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:42:48 2016 Ameren: S/G B HOT AREVA S/G B TOTAL TUBES: 5872 HOT SELECTED TUBES: 1 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 35 of 93

AREVA NP Inc 04/19/16 04:04:42 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G B Page 1 of 1 AVB %TWD 30-39%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

95 57 1.04 127 P2 TWD 30 AV4 -0.02 TEC TEH 3 HOT 610HS 132 Total Tubes : 1 Total Records: 1 Page 36 of 93

GROUP TUBES A QueryM1[1] 1 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 30-39%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:42:48 2016 Ameren: S/G B HOT AREVA S/G B TOTAL TUBES: 5872 HOT SELECTED TUBES: 1 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 37 of 93

AREVA NP Inc 04/19/16 04:03:44 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G B Page 1 of 1 AVB %TWD 40-100%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

Total Tubes : 0 Total Records: 0 Page 38 of 93

GROUP TUBES A QueryM1[1] 7 Ameren - Callaway Unit 1 4/16 - 1R21 TSP %TWD < 10%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:12:46 2016 Ameren: S/G B HOT AREVA S/G B TOTAL TUBES: 5872 HOT SELECTED TUBES: 7 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 39 of 93

AREVA NP Inc 04/19/16 03:10:59 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G B Page 1 of 1 TSP %TWD < 10%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

50 78 0.16 104 P4 TWD 8 04H +0.37 04H 04H WAR 1_Land 64 HOT 610PP 27 76 116 0.09 267 P4 TWD 5 05H -0.75 05H 05H WAR 2_Land 64 HOT 610PP 25 0.14 264 P4 TWD 7 05H -0.77 05H 05H WAR 2_Land 64 HOT 610PP 25 90 30 0.12 109 P4 TWD 6 04C +0.43 04C 04C WAR 1_Land 7 COLD 610PP 21 108 84 0.10 82 P4 TWD 5 06H -0.64 06H 06H WAR 2_Land 64 HOT 610PP 19 108 86 0.19 104 P4 TWD 9 06H +0.35 06H 06H WAR 2_Land 64 HOT 610PP 23 109 83 0.10 101 P4 TWD 5 05H -0.53 05H 05H WAR 2_Land 64 HOT 610PP 20 113 69 0.16 105 P4 TWD 7 06C +0.40 06C 06C WAR 1_Land 7 COLD 610PP 13 Total Tubes : 7 Total Records: 8 Page 40 of 93

GROUP TUBES A QueryM1[1] 7 Ameren - Callaway Unit 1 4/16 - 1R21 TSP %TWD < 10%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:12:46 2016 Ameren: S/G B HOT AREVA S/G B TOTAL TUBES: 5872 HOT SELECTED TUBES: 7 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 41 of 93

GROUP TUBES A QueryM1[1] 19 Ameren - Callaway Unit 1 4/16 - 1R21 TSP %TWD 10-19%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:15:29 2016 Ameren: S/G B HOT AREVA S/G B TOTAL TUBES: 5872 HOT SELECTED TUBES: 19 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 42 of 93

AREVA NP Inc 04/19/16 03:13:59 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G B Page 1 of 1 TSP %TWD 10-19%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

64 74 0.22 91 P4 TWD 10 05H +0.35 05H 05H WAR 1_Land 64 HOT 610PP 15 81 23 0.22 102 P4 TWD 10 05H +0.35 05H 05H WAR 1_Land 64 HOT 610PP 9 85 25 0.37 275 P4 TWD 16 05H +0.43 05H 05H WAR 2_Land 64 HOT 610PP 10 0.24 278 P4 TWD 11 05H -0.64 05H 05H WAR 2_Land 64 HOT 610PP 10 89 37 0.24 100 P4 TWD 11 05H -0.77 05H 05H WAR 1_Land 64 HOT 610PP 11 89 59 0.36 95 P4 TWD 16 05H +0.32 05H 05H WAR 1_Land 64 HOT 610PP 14 97 49 0.24 101 P4 TWD 11 05H +0.45 05H 05H WAR 1_Land 64 HOT 610PP 13 99 47 0.25 277 P4 TWD 12 05H +0.40 05H 05H WAR 1_Land 64 HOT 610PP 12 105 89 0.24 99 P4 TWD 11 05C +0.35 05C 05C WAR 1_Land 7 COLD 610PP 17 106 82 0.20 89 P4 TWD 10 05H -0.77 05H 05H WAR 1_Land 64 HOT 610PP 18 106 84 0.28 103 P4 TWD 13 04H -0.61 04H 04H WAR 1_Land 64 HOT 610PP 21 0.34 106 P4 TWD 15 05H -0.56 05H 05H WAR 1_Land 64 HOT 610PP 22 106 90 0.31 95 P4 TWD 14 06H +0.32 06H 06H WAR 1_Land 64 HOT 610PP 24 108 84 0.29 91 P4 TWD 13 06H +0.40 06H 06H WAR 2_Land 64 HOT 610PP 19 108 86 0.20 93 P4 TWD 10 06H -0.72 06H 06H WAR 2_Land 64 HOT 610PP 23 109 77 0.27 97 P4 TWD 12 04C +0.35 04C 04C WAR 1_Land 7 COLD 610PP 16 109 83 0.26 104 P4 TWD 12 05H +0.56 05H 05H WAR 2_Land 64 HOT 610PP 20 110 72 0.32 95 P4 TWD 14 06C +0.37 06C 06C WAR 1_Land 7 COLD 610PP 14 110 74 0.22 96 P4 TWD 10 04C +0.40 04C 04C WAR 1_Land 7 COLD 610PP 15 111 77 0.28 106 P4 TWD 13 05H +0.43 05H 05H WAR 1_Land 64 HOT 610PP 16 112 78 0.23 81 P4 TWD 11 05H -0.72 05H 05H WAR 1_Land 64 HOT 610PP 17 Total Tubes : 19 Total Records: 21 Page 43 of 93

GROUP TUBES A QueryM1[1] 19 Ameren - Callaway Unit 1 4/16 - 1R21 TSP %TWD 10-19%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:15:29 2016 Ameren: S/G B HOT AREVA S/G B TOTAL TUBES: 5872 HOT SELECTED TUBES: 19 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 44 of 93

AREVA NP Inc 04/19/16 03:16:31 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G B Page 1 of 1 TSP %TWD 20-29%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

Total Tubes : 0 Total Records: 0 Page 45 of 93

AREVA NP Inc 04/19/16 03:17:23 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G B Page 1 of 1 TSP %TWD 30-39%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

Total Tubes : 0 Total Records: 0 Page 46 of 93

AREVA NP Inc 04/19/16 03:18:20 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G B Page 1 of 1 TSP %TWD 40-100%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

Total Tubes : 0 Total Records: 0 Page 47 of 93

GROUP TUBES A QueryM1[1] 62 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD < 10%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:45:51 2016 Ameren: S/G C HOT AREVA S/G C TOTAL TUBES: 5872 HOT SELECTED TUBES: 62 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 48 of 93

AREVA NP Inc 04/19/16 04:07:23 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G C Page 1 of 2 AVB %TWD < 10%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

28 42 0.14 146 P2 TWD 8 AV1 +1.09 TEC TEH 35 HOT 610HS 74 51 67 0.13 145 P2 TWD 8 AV3 +0.07 TEC TEH 6 HOT 610HS 6 58 44 0.13 65 P2 TWD 8 AV4 -0.05 TEC TEH 13 HOT 610HS 61 59 103 0.13 71 P2 TWD 8 AV5 +0.10 TEC TEH 24 HOT 610HS 128 0.14 126 P2 TWD 8 AV4 -0.02 TEC TEH 24 HOT 610HS 128 60 120 0.11 88 P2 TWD 7 AV4 +0.09 TEC TEH 28 HOT 610HS 54 62 64 0.09 120 P2 TWD 6 AV2 -0.02 TEC TEH 6 HOT 610HS 103 64 80 0.13 157 P2 TWD 8 AV5 -0.07 TEC TEH 22 HOT 610HS 33 0.12 145 P2 TWD 7 AV3 -0.07 TEC TEH 22 HOT 610HS 33 67 65 0.07 148 P2 TWD 4 AV2 +0.07 TEC TEH 6 HOT 610HS 98 69 35 0.14 97 P2 TWD 8 AV4 -0.02 TEC TEH 10 HOT 610HS 208 70 22 0.12 108 P2 TWD 8 AV2 -0.16 TEC TEH 11 HOT 610HS 63 73 55 0.12 80 P2 TWD 7 AV4 -0.07 TEC TEH 8 HOT 610HS 61 73 67 0.13 71 P2 TWD 8 AV2 -0.05 TEC TEH 7 HOT 610HS 11 76 70 0.12 121 P2 TWD 7 AV2 -0.14 TEC TEH 19 HOT 610HS 176 76 72 0.11 79 P2 TWD 7 AV4 -0.02 TEC TEH 19 HOT 610HS 207 77 67 0.14 66 P2 TWD 8 AV4 -0.05 TEC TEH 7 HOT 610HS 12 77 91 0.11 42 P2 TWD 7 AV5 +0.00 TEC TEH 23 HOT 610HS 191 0.12 148 P2 TWD 8 AV2 -0.02 TEC TEH 23 HOT 610HS 191 78 66 0.12 108 P2 TWD 7 AV4 +0.12 TEC TEH 7 HOT 610HS 30 79 51 0.12 142 P2 TWD 8 AV2 +0.00 TEC TEH 12 HOT 610HS 158 80 70 0.11 152 P2 TWD 7 AV4 +0.00 TEC TEH 19 HOT 610HS 175 81 59 0.11 54 P2 TWD 7 AV4 -0.07 TEC TEH 7 HOT 610HS 136 82 62 0.13 73 P2 TWD 8 AV3 -0.24 TEC TEH 7 HOT 610HS 68 83 57 0.11 139 P2 TWD 7 AV3 -0.07 TEC TEH 8 HOT 610HS 31 83 61 0.16 139 P2 TWD 9 AV3 -0.02 TEC TEH 6 HOT 610HS 69 83 71 0.10 154 P2 TWD 6 AV2 -0.09 TEC TEH 18 HOT 610HS 193 83 73 0.07 46 P2 TWD 5 AV5 -0.24 TEC TEH 21 HOT 610HS 7 84 64 0.08 131 P2 TWD 5 AV4 +0.00 TEC TEH 7 HOT 610HS 50 84 74 0.10 146 P2 TWD 6 AV3 +0.00 TEC TEH 21 HOT 610HS 22 84 76 0.13 108 P2 TWD 8 AV4 -0.02 TEC TEH 20 HOT 610HS 53 84 88 0.15 130 P2 TWD 9 AV4 +0.00 TEC TEH 22 HOT 610HS 144 0.11 151 P2 TWD 7 AV2 +0.00 TEC TEH 22 HOT 610HS 144 85 69 0.12 145 P2 TWD 7 AV3 -0.02 TEC TEH 19 HOT 610HS 159 86 70 0.14 154 P2 TWD 8 AV6 +0.00 TEC TEH 18 HOT 610HS 174 89 85 0.15 92 P2 TWD 9 AV4 +0.02 TEC TEH 23 HOT 610HS 106 90 68 0.12 89 P2 TWD 7 AV2 -0.02 TEC TEH 18 HOT 610HS 143 90 70 0.11 138 P2 TWD 7 AV5 -0.16 TEC TEH 18 HOT 610HS 173 90 72 0.12 144 P2 TWD 7 AV6 -0.05 TEC TEH 18 HOT 610HS 206 90 76 0.13 96 P2 TWD 8 AV3 -0.02 TEC TEH 21 HOT 610HS 53 91 61 0.10 65 P2 TWD 7 AV4 +0.02 TEC TEH 6 HOT 610HS 71 91 73 0.14 137 P2 TWD 9 AV2 +0.02 TEC TEH 21 HOT 610HS 9 93 65 0.16 132 P2 TWD 9 AV1 +0.02 TEC TEH 6 HOT 610HS 36 93 67 0.11 68 P2 TWD 7 AV3 -0.07 TEC TEH 7 HOT 610HS 16 93 75 0.11 155 P2 TWD 7 AV5 -0.02 TEC TEH 21 HOT 610HS 42 0.13 65 P2 TWD 8 AV2 -0.07 TEC TEH 21 HOT 610HS 42 94 66 0.16 109 P2 TWD 9 AV6 +0.00 TEC TEH 7 HOT 610HS 26 0.11 53 P2 TWD 7 AV2 +0.14 TEC TEH 7 HOT 610HS 26 94 72 0.11 118 P2 TWD 7 AV5 +0.09 TEC TEH 18 HOT 610HS 205 94 76 0.15 143 P2 TWD 9 AV6 +0.05 TEC TEH 20 HOT 610HS 50 0.16 156 P2 TWD 9 AV5 -0.02 TEC TEH 20 HOT 610HS 50 95 63 0.10 122 P2 TWD 6 AV3 -0.02 TEC TEH 6 HOT 610HS 54 95 65 0.14 141 P2 TWD 8 AV2 -0.02 TEC TEH 7 HOT 610HS 37 96 64 0.14 53 P2 TWD 8 AV2 -0.02 TEC TEH 7 HOT 610HS 47 96 70 0.13 123 P2 TWD 8 AV6 -0.05 TEC TEH 19 HOT 610HS 171 0.10 71 P2 TWD 6 AV5 -0.16 TEC TEH 19 HOT 610HS 171 97 63 0.11 88 P2 TWD 7 AV6 -0.02 TEC TEH 7 HOT 610HS 56 97 75 0.11 126 P2 TWD 7 AV6 -0.02 TEC TEH 21 HOT 610HS 43 99 69 0.11 84 P2 TWD 7 AV6 +0.00 TEC TEH 19 HOT 610HS 162 Page 49 of 93

AREVA NP Inc 04/19/16 04:07:23 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G C Page 2 of 2 AVB %TWD < 10%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

99 73 0.11 106 P2 TWD 7 AV3 +0.02 TEC TEH 21 HOT 610HS 10 100 68 0.10 108 P2 TWD 7 AV5 -0.05 TEC TEH 19 HOT 610HS 138 100 72 0.12 118 P2 TWD 7 AV4 -0.05 TEC TEH 19 HOT 610HS 201 0.09 101 P2 TWD 6 AV2 -0.05 TEC TEH 19 HOT 610HS 201 100 74 0.07 36 P2 TWD 5 AV1 +0.12 TEC TEH 21 HOT 610HS 18 101 69 0.12 86 P2 TWD 7 AV1 +0.00 TEC TEH 18 HOT 610HS 165 102 74 0.13 93 P2 TWD 8 AV5 -0.05 TEC TEH 20 HOT 610HS 18 104 72 0.13 113 P2 TWD 8 AV5 +0.09 TEC TEH 19 HOT 610HS 200 105 71 0.14 150 P2 TWD 8 AV2 -0.07 TEC TEH 19 HOT 610HS 195 106 76 0.14 96 P2 TWD 8 AV3 +0.09 TEC TEH 20 HOT 610HS 47 107 65 0.14 47 P2 TWD 9 AV5 -0.05 TEC TEH 7 HOT 610HS 40 111 67 0.12 143 P2 TWD 8 AV3 -0.09 TEC TEH 7 HOT 610HS 20 Total Tubes : 62 Total Records: 71 Page 50 of 93

GROUP TUBES A QueryM1[1] 62 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD < 10%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:45:51 2016 Ameren: S/G C HOT AREVA S/G C TOTAL TUBES: 5872 HOT SELECTED TUBES: 62 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 51 of 93

GROUP TUBES A QueryM1[1] 70 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 10-19%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:47:50 2016 Ameren: S/G C HOT AREVA S/G C TOTAL TUBES: 5872 HOT SELECTED TUBES: 70 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 52 of 93

AREVA NP Inc 04/19/16 04:08:34 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G C Page 1 of 2 AVB %TWD 10-19%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

58 44 0.38 100 P2 TWD 18 AV5 +0.00 TEC TEH 13 HOT 610HS 61 0.30 109 P2 TWD 15 AV3 -0.07 TEC TEH 13 HOT 610HS 61 0.18 82 P2 TWD 11 AV2 -0.02 TEC TEH 13 HOT 610HS 61 60 120 0.17 139 P2 TWD 10 AV3 -0.02 TEC TEH 28 HOT 610HS 54 62 64 0.21 121 P2 TWD 12 AV5 +0.00 TEC TEH 6 HOT 610HS 103 0.19 135 P2 TWD 11 AV4 -0.02 TEC TEH 6 HOT 610HS 103 63 39 0.24 95 P2 TWD 13 AV4 -0.05 TEC TEH 11 HOT 610HS 236 64 62 0.30 128 P2 TWD 15 AV3 -0.05 TEC TEH 6 HOT 610HS 116 64 80 0.20 110 P2 TWD 11 AV4 -0.02 TEC TEH 22 HOT 610HS 33 68 58 0.19 125 P2 TWD 11 AV5 +0.00 TEC TEH 8 HOT 610HS 18 0.25 104 P2 TWD 13 AV4 -0.05 TEC TEH 8 HOT 610HS 18 73 63 0.36 111 P2 TWD 17 AV3 -0.02 TEC TEH 7 HOT 610HS 110 73 67 0.17 114 P2 TWD 10 AV4 -0.05 TEC TEH 7 HOT 610HS 11 0.42 113 P2 TWD 19 AV3 -0.05 TEC TEH 7 HOT 610HS 11 77 71 0.25 143 P2 TWD 13 AV5 -0.02 TEC TEH 19 HOT 610HS 191 77 81 0.18 115 P2 TWD 10 AV3 +0.02 TEC TEH 23 HOT 610HS 42 0.35 108 P2 TWD 17 AV2 +0.00 TEC TEH 23 HOT 610HS 42 77 91 0.22 120 P2 TWD 12 AV4 -0.05 TEC TEH 23 HOT 610HS 191 0.30 138 P2 TWD 15 AV3 +0.00 TEC TEH 23 HOT 610HS 191 78 44 0.16 99 P2 TWD 10 AV3 -0.05 TEC TEH 13 HOT 610HS 56 78 66 0.31 82 P2 TWD 16 AV3 -0.05 TEC TEH 7 HOT 610HS 30 0.44 121 P2 TWD 19 AV2 -0.05 TEC TEH 7 HOT 610HS 30 79 51 0.24 130 P2 TWD 13 AV4 +0.00 TEC TEH 12 HOT 610HS 158 0.43 126 P2 TWD 19 AV3 -0.05 TEC TEH 12 HOT 610HS 158 80 60 0.18 114 P2 TWD 10 AV5 -0.05 TEC TEH 7 HOT 610HS 84 0.22 113 P2 TWD 12 AV2 +0.00 TEC TEH 7 HOT 610HS 84 80 70 0.28 130 P2 TWD 14 AV5 -0.19 TEC TEH 19 HOT 610HS 175 0.18 105 P2 TWD 10 AV3 -0.02 TEC TEH 19 HOT 610HS 175 0.22 73 P2 TWD 12 AV2 -0.05 TEC TEH 19 HOT 610HS 175 81 59 0.18 116 P2 TWD 10 AV3 -0.02 TEC TEH 7 HOT 610HS 136 81 77 0.21 78 P2 TWD 12 AV5 -0.05 TEC TEH 21 HOT 610HS 70 0.31 109 P2 TWD 16 AV4 +0.02 TEC TEH 21 HOT 610HS 70 82 40 0.19 134 P2 TWD 11 AV3 -0.05 TEC TEH 10 HOT 610HS 272 83 61 0.19 96 P2 TWD 11 AV2 +0.00 TEC TEH 6 HOT 610HS 69 83 67 0.17 137 P2 TWD 10 AV4 -0.05 TEC TEH 6 HOT 610HS 14 0.30 107 P2 TWD 15 AV2 -0.02 TEC TEH 6 HOT 610HS 14 83 75 0.18 144 P2 TWD 11 AV5 +0.02 TEC TEH 20 HOT 610HS 39 84 64 0.21 84 P2 TWD 12 AV3 -0.05 TEC TEH 7 HOT 610HS 50 84 88 0.28 134 P2 TWD 15 AV3 +0.02 TEC TEH 22 HOT 610HS 144 87 71 0.38 134 P2 TWD 18 AV5 -0.05 TEC TEH 18 HOT 610HS 194 0.36 121 P2 TWD 17 AV3 -0.07 TEC TEH 18 HOT 610HS 194 87 83 0.28 108 P2 TWD 14 AV3 +0.00 TEC TEH 22 HOT 610HS 76 88 70 0.39 129 P2 TWD 18 AV5 -0.05 TEC TEH 19 HOT 610HS 173 89 63 0.22 92 P2 TWD 12 AV4 -0.02 TEC TEH 7 HOT 610HS 54 0.20 78 P2 TWD 11 AV3 -0.02 TEC TEH 7 HOT 610HS 54 89 65 0.36 123 P2 TWD 17 AV3 -0.02 TEC TEH 6 HOT 610HS 35 89 67 0.34 131 P2 TWD 17 AV3 -0.02 TEC TEH 7 HOT 610HS 15 89 69 0.38 128 P2 TWD 18 AV4 -0.07 TEC TEH 19 HOT 610HS 160 0.27 103 P2 TWD 14 AV2 -0.05 TEC TEH 19 HOT 610HS 160 89 75 0.26 82 P2 TWD 14 AV5 -0.05 TEC TEH 21 HOT 610HS 41 0.31 134 P2 TWD 16 AV4 -0.02 TEC TEH 21 HOT 610HS 41 90 72 0.27 135 P2 TWD 14 AV5 -0.02 TEC TEH 18 HOT 610HS 206 0.20 127 P2 TWD 11 AV3 +0.00 TEC TEH 18 HOT 610HS 206 0.17 142 P2 TWD 10 AV2 -0.02 TEC TEH 18 HOT 610HS 206 90 76 0.20 87 P2 TWD 11 AV2 +0.02 TEC TEH 21 HOT 610HS 53 91 51 0.26 122 P2 TWD 14 AV4 +0.00 TEC TEH 12 HOT 610HS 161 0.36 114 P2 TWD 17 AV2 +0.00 TEC TEH 12 HOT 610HS 161 91 67 0.21 127 P2 TWD 12 AV4 -0.07 TEC TEH 6 HOT 610HS 16 91 71 0.23 112 P2 TWD 13 AV6 +0.00 TEC TEH 18 HOT 610HS 195 Page 53 of 93

AREVA NP Inc 04/19/16 04:08:34 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G C Page 2 of 2 AVB %TWD 10-19%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

0.32 130 P2 TWD 16 AV5 -0.05 TEC TEH 18 HOT 610HS 195 91 75 0.36 101 P2 TWD 17 AV5 -0.02 TEC TEH 20 HOT 610HS 41 0.19 115 P2 TWD 11 AV4 -0.02 TEC TEH 20 HOT 610HS 41 93 65 0.33 113 P2 TWD 16 AV3 -0.02 TEC TEH 6 HOT 610HS 36 93 69 0.22 125 P2 TWD 12 AV2 -0.05 TEC TEH 18 HOT 610HS 163 93 73 0.21 104 P2 TWD 11 AV5 -0.19 TEC TEH 20 HOT 610HS 11 0.23 108 P2 TWD 12 AV4 +0.00 TEC TEH 20 HOT 610HS 11 0.23 137 P2 TWD 12 AV3 -0.02 TEC TEH 20 HOT 610HS 11 93 75 0.22 79 P2 TWD 12 AV3 -0.07 TEC TEH 21 HOT 610HS 42 94 66 0.36 118 P2 TWD 17 AV5 -0.02 TEC TEH 7 HOT 610HS 26 0.31 127 P2 TWD 16 AV4 -0.02 TEC TEH 7 HOT 610HS 26 94 78 0.17 134 P2 TWD 10 AV2 +0.02 TEC TEH 20 HOT 610HS 81 95 65 0.31 112 P2 TWD 16 AV5 +0.00 TEC TEH 7 HOT 610HS 37 0.41 127 P2 TWD 19 AV4 +0.00 TEC TEH 7 HOT 610HS 37 0.24 107 P2 TWD 13 AV3 -0.05 TEC TEH 7 HOT 610HS 37 96 64 0.39 106 P2 TWD 18 AV3 -0.02 TEC TEH 7 HOT 610HS 47 96 70 0.20 108 P2 TWD 11 AV1 -0.05 TEC TEH 19 HOT 610HS 171 96 74 0.34 105 P2 TWD 17 AV5 -0.07 TEC TEH 21 HOT 610HS 19 0.42 115 P2 TWD 19 AV3 +0.00 TEC TEH 21 HOT 610HS 19 96 76 0.18 135 P2 TWD 11 AV3 +0.02 TEC TEH 21 HOT 610HS 52 97 63 0.17 81 P2 TWD 10 AV3 +0.00 TEC TEH 7 HOT 610HS 56 97 67 0.20 134 P2 TWD 11 AV4 -0.02 TEC TEH 7 HOT 610HS 17 0.20 110 P2 TWD 11 AV3 -0.02 TEC TEH 7 HOT 610HS 17 97 69 0.22 123 P2 TWD 12 AV6 +0.00 TEC TEH 18 HOT 610HS 164 97 73 0.27 141 P2 TWD 14 AV6 -0.02 TEC TEH 20 HOT 610HS 12 97 83 0.25 117 P2 TWD 13 AV4 -0.02 TEC TEH 23 HOT 610HS 76 98 68 0.22 136 P2 TWD 12 AV5 -0.02 TEC TEH 18 HOT 610HS 141 0.41 140 P2 TWD 19 AV3 +0.02 TEC TEH 18 HOT 610HS 141 99 73 0.43 133 P2 TWD 19 AV5 -0.05 TEC TEH 21 HOT 610HS 10 0.22 128 P2 TWD 12 AV4 -0.02 TEC TEH 21 HOT 610HS 10 0.21 125 P2 TWD 11 AV2 -0.05 TEC TEH 21 HOT 610HS 10 100 72 0.18 112 P2 TWD 10 AV3 -0.02 TEC TEH 19 HOT 610HS 201 101 63 0.21 78 P2 TWD 12 AV3 +0.00 TEC TEH 7 HOT 610HS 57 102 74 0.24 117 P2 TWD 13 AV6 +0.00 TEC TEH 20 HOT 610HS 18 104 74 0.39 123 P2 TWD 18 AV4 +0.00 TEC TEH 21 HOT 610HS 17 104 82 0.17 117 P2 TWD 10 AV5 -0.05 TEC TEH 23 HOT 610HS 52 0.21 71 P2 TWD 12 AV3 +0.02 TEC TEH 23 HOT 610HS 52 105 71 0.26 115 P2 TWD 14 AV4 -0.05 TEC TEH 19 HOT 610HS 195 0.31 112 P2 TWD 16 AV3 -0.02 TEC TEH 19 HOT 610HS 195 106 76 0.19 138 P2 TWD 11 AV2 +0.00 TEC TEH 20 HOT 610HS 47 107 69 0.34 133 P2 TWD 16 AV6 +0.02 TEC TEH 19 HOT 610HS 164 0.31 119 P2 TWD 16 AV4 -0.05 TEC TEH 19 HOT 610HS 164 108 72 0.37 126 P2 TWD 17 AV6 +0.00 TEC TEH 19 HOT 610HS 199 110 70 0.17 104 P2 TWD 10 AV4 -0.02 TEC TEH 18 HOT 610HS 168 110 72 0.37 134 P2 TWD 17 AV5 +0.00 TEC TEH 18 HOT 610HS 201 111 67 0.37 107 P2 TWD 17 AV4 -0.07 TEC TEH 7 HOT 610HS 20 111 71 0.20 112 P2 TWD 11 AV6 +0.00 TEC TEH 18 HOT 610HS 200 0.17 115 P2 TWD 10 AV5 +0.00 TEC TEH 18 HOT 610HS 200 Total Tubes : 70 Total Records: 107 Page 54 of 93

GROUP TUBES A QueryM1[1] 70 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 10-19%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:47:50 2016 Ameren: S/G C HOT AREVA S/G C TOTAL TUBES: 5872 HOT SELECTED TUBES: 70 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 55 of 93

GROUP TUBES A QueryM1[1] 33 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 20-29%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:49:45 2016 Ameren: S/G C HOT AREVA S/G C TOTAL TUBES: 5872 HOT SELECTED TUBES: 33 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 56 of 93

AREVA NP Inc 04/19/16 04:09:12 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G C Page 1 of 1 AVB %TWD 20-29%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

64 62 0.47 124 P2 TWD 20 AV4 -0.02 TEC TEH 6 HOT 610HS 116 73 63 0.72 101 P2 TWD 26 AV5 -0.02 TEC TEH 7 HOT 610HS 110 0.55 132 P2 TWD 22 AV4 -0.02 TEC TEH 7 HOT 610HS 110 77 67 0.78 119 P2 TWD 27 AV3 +0.00 TEC TEH 7 HOT 610HS 12 0.45 112 P2 TWD 20 AV2 -0.02 TEC TEH 7 HOT 610HS 12 77 71 0.45 121 P2 TWD 20 AV4 -0.02 TEC TEH 19 HOT 610HS 191 80 60 0.75 117 P2 TWD 26 AV4 -0.02 TEC TEH 7 HOT 610HS 84 81 51 0.79 116 P2 TWD 27 AV4 +0.00 TEC TEH 13 HOT 610HS 156 0.87 111 P2 TWD 28 AV3 +0.00 TEC TEH 13 HOT 610HS 156 83 67 0.48 125 P2 TWD 20 AV3 -0.02 TEC TEH 6 HOT 610HS 14 84 76 0.45 105 P2 TWD 20 AV2 +0.00 TEC TEH 20 HOT 610HS 53 87 83 0.54 125 P2 TWD 22 AV4 +0.00 TEC TEH 22 HOT 610HS 76 89 67 0.75 116 P2 TWD 26 AV5 +0.00 TEC TEH 7 HOT 610HS 15 0.64 125 P2 TWD 24 AV4 -0.05 TEC TEH 7 HOT 610HS 15 89 69 0.73 121 P2 TWD 26 AV3 +0.00 TEC TEH 19 HOT 610HS 160 89 75 0.69 108 P2 TWD 25 AV3 -0.02 TEC TEH 21 HOT 610HS 41 90 56 0.74 106 P2 TWD 26 AV3 -0.05 TEC TEH 9 HOT 610HS 45 0.47 101 P2 TWD 20 AV2 -0.02 TEC TEH 9 HOT 610HS 45 91 51 0.68 122 P2 TWD 25 AV3 +0.00 TEC TEH 12 HOT 610HS 161 91 73 0.45 120 P2 TWD 20 AV3 -0.02 TEC TEH 21 HOT 610HS 9 91 75 0.58 126 P2 TWD 23 AV6 -0.02 TEC TEH 20 HOT 610HS 41 93 65 0.60 123 P2 TWD 23 AV2 -0.05 TEC TEH 6 HOT 610HS 36 94 66 0.46 89 P2 TWD 20 AV3 -0.02 TEC TEH 7 HOT 610HS 26 96 64 0.68 109 P2 TWD 25 AV5 -0.02 TEC TEH 7 HOT 610HS 47 96 70 0.47 130 P2 TWD 20 AV4 -0.05 TEC TEH 19 HOT 610HS 171 96 74 0.69 110 P2 TWD 25 AV2 -0.02 TEC TEH 21 HOT 610HS 19 97 63 0.63 116 P2 TWD 24 AV5 -0.02 TEC TEH 7 HOT 610HS 56 97 67 0.52 101 P2 TWD 21 AV2 -0.05 TEC TEH 7 HOT 610HS 17 97 69 0.90 113 P2 TWD 28 AV5 -0.02 TEC TEH 18 HOT 610HS 164 0.87 129 P2 TWD 28 AV4 +0.00 TEC TEH 18 HOT 610HS 164 98 68 0.45 129 P2 TWD 20 AV2 -0.05 TEC TEH 18 HOT 610HS 141 100 74 0.59 124 P2 TWD 23 AV4 -0.02 TEC TEH 21 HOT 610HS 18 0.60 102 P2 TWD 23 AV2 -0.02 TEC TEH 21 HOT 610HS 18 101 63 0.82 115 P2 TWD 27 AV5 -0.05 TEC TEH 7 HOT 610HS 57 101 69 0.85 126 P2 TWD 28 AV6 +0.02 TEC TEH 18 HOT 610HS 165 104 82 0.46 115 P2 TWD 20 AV4 -0.02 TEC TEH 23 HOT 610HS 52 107 69 0.54 115 P2 TWD 22 AV5 -0.02 TEC TEH 19 HOT 610HS 164 108 72 0.79 110 P2 TWD 27 AV3 +0.00 TEC TEH 19 HOT 610HS 199 110 70 0.50 120 P2 TWD 21 AV3 +0.00 TEC TEH 18 HOT 610HS 168 110 72 0.83 132 P2 TWD 27 AV6 +0.00 TEC TEH 18 HOT 610HS 201 Total Tubes : 33 Total Records: 40 Page 57 of 93

GROUP TUBES A QueryM1[1] 33 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 20-29%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:49:45 2016 Ameren: S/G C HOT AREVA S/G C TOTAL TUBES: 5872 HOT SELECTED TUBES: 33 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 58 of 93

GROUP TUBES A QueryM1[1] 14 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 30-39%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:51:41 2016 Ameren: S/G C HOT AREVA S/G C TOTAL TUBES: 5872 HOT SELECTED TUBES: 14 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 59 of 93

AREVA NP Inc 04/19/16 04:09:52 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G C Page 1 of 1 AVB %TWD 30-39%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

77 71 1.65 108 P2 TWD 36 AV3 -0.05 TEC TEH 19 HOT 610HS 191 80 60 1.01 110 P2 TWD 30 AV3 -0.02 TEC TEH 7 HOT 610HS 84 81 51 1.36 111 P2 TWD 34 AV5 -0.02 TEC TEH 13 HOT 610HS 156 81 77 1.23 112 P2 TWD 32 AV3 +0.00 TEC TEH 21 HOT 610HS 70 1.06 100 P2 TWD 30 AV2 -0.02 TEC TEH 21 HOT 610HS 70 84 76 1.01 119 P2 TWD 30 AV3 +0.00 TEC TEH 20 HOT 610HS 53 93 69 1.18 117 P2 TWD 32 AV5 -0.05 TEC TEH 18 HOT 610HS 163 1.22 121 P2 TWD 32 AV4 -0.05 TEC TEH 18 HOT 610HS 163 1.93 120 P2 TWD 37 AV3 +0.00 TEC TEH 18 HOT 610HS 163 96 64 1.04 117 P2 TWD 30 AV4 -0.05 TEC TEH 7 HOT 610HS 47 96 70 1.61 112 P2 TWD 35 AV3 -0.02 TEC TEH 19 HOT 610HS 171 1.09 120 P2 TWD 31 AV2 -0.02 TEC TEH 19 HOT 610HS 171 97 63 1.38 115 P2 TWD 34 AV4 -0.02 TEC TEH 7 HOT 610HS 56 98 68 1.53 124 P2 TWD 35 AV4 +0.00 TEC TEH 18 HOT 610HS 141 100 74 1.53 111 P2 TWD 35 AV3 -0.02 TEC TEH 21 HOT 610HS 18 101 63 1.04 113 P2 TWD 30 AV4 -0.02 TEC TEH 7 HOT 610HS 57 101 69 1.48 123 P2 TWD 34 AV5 -0.02 TEC TEH 18 HOT 610HS 165 1.09 123 P2 TWD 31 AV4 -0.02 TEC TEH 18 HOT 610HS 165 1.37 120 P2 TWD 34 AV3 +0.02 TEC TEH 18 HOT 610HS 165 1.36 122 P2 TWD 33 AV2 -0.02 TEC TEH 18 HOT 610HS 165 108 72 1.38 118 P2 TWD 34 AV5 -0.02 TEC TEH 19 HOT 610HS 199 1.23 118 P2 TWD 32 AV4 -0.02 TEC TEH 19 HOT 610HS 199 Total Tubes : 14 Total Records: 22 Page 60 of 93

GROUP TUBES A QueryM1[1] 14 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 30-39%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:51:41 2016 Ameren: S/G C HOT AREVA S/G C TOTAL TUBES: 5872 HOT SELECTED TUBES: 14 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 61 of 93

AREVA NP Inc 04/19/16 04:10:35 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G C Page 1 of 1 AVB %TWD 40-100%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

Total Tubes : 0 Total Records: 0 Page 62 of 93

GROUP TUBES A QueryM1[1] 8 Ameren - Callaway Unit 1 4/16 - 1R21 TSP %TWD < 10%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:21:08 2016 Ameren: S/G C HOT AREVA S/G C TOTAL TUBES: 5872 HOT SELECTED TUBES: 8 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 63 of 93

AREVA NP Inc 04/19/16 03:19:30 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G C Page 1 of 1 TSP %TWD <10%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

100 38 0.16 119 P4 TWD 8 05H -0.64 05H 05H WAR 2_Land 56 HOT 610PP 20 0.07 82 P4 TWD 4 05H -0.72 05H 05H WAR 2_Land 56 HOT 610PP 20 106 62 0.16 88 P4 TWD 8 08C -0.80 08C 08C WAR 2_Land 6 COLD 610PP 9 0.11 99 P4 TWD 6 08C +0.29 08C 08C WAR 2_Land 6 COLD 610PP 9 108 52 0.19 117 P4 TWD 9 04H -0.59 04H 04H WAR 2_Land 56 HOT 610PP 19 108 84 0.11 284 P4 TWD 6 06H -0.61 06H 06H WAR 2_Land 56 HOT 610PP 25 109 53 0.11 289 P4 TWD 6 04H -0.59 04H 04H WAR 2_Land 56 HOT 610PP 18 0.12 106 P4 TWD 6 04H -0.61 04H 04H WAR 2_Land 56 HOT 610PP 18 109 83 0.17 107 P4 TWD 9 06H -0.59 06H 06H WAR 2_Land 56 HOT 610PP 24 0.15 89 P4 TWD 8 06H -0.69 06H 06H WAR 2_Land 56 HOT 610PP 24 112 78 0.14 100 P4 TWD 7 06H +0.32 06H 06H WAR 2_Land 56 HOT 610PP 23 0.17 277 P4 TWD 9 06H -0.69 06H 06H WAR 2_Land 56 HOT 610PP 23 113 67 0.13 130 P4 TWD 7 07C -0.48 06C 07C WAR 3_Land 6 COLD 610PP 11 0.10 93 P4 TWD 5 07C -0.59 06C 07C WAR 3_Land 6 COLD 610PP 11 Total Tubes : 8 Total Records: 14 Page 64 of 93

GROUP TUBES A QueryM1[1] 8 Ameren - Callaway Unit 1 4/16 - 1R21 TSP %TWD < 10%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:21:08 2016 Ameren: S/G C HOT AREVA S/G C TOTAL TUBES: 5872 HOT SELECTED TUBES: 8 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 65 of 93

GROUP TUBES A QueryM1[1] 14 Ameren - Callaway Unit 1 4/16 - 1R21 TSP %TWD 10-19%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:23:33 2016 Ameren: S/G C HOT AREVA S/G C TOTAL TUBES: 5872 HOT SELECTED TUBES: 14 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 66 of 93

AREVA NP Inc 04/19/16 03:22:15 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G C Page 1 of 1 TSP %TWD 10-19%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

75 117 0.31 101 P4 TWD 14 06C +0.29 06C 06C WAR 1-LAND 6 COLD 610PP 15 82 88 0.23 280 P4 TWD 11 05H +0.40 05H 05H WAR 1_Land 56 HOT 610PP 27 82 94 0.30 104 P4 TWD 13 04H +0.32 04H 04H WAR 1_Land 56 HOT 610PP 28 104 66 0.20 97 P4 TWD 10 05H +0.43 05H 05H WAR 1_Land 56 HOT 610PP 17 105 45 0.31 102 P4 TWD 14 04C +0.43 04C 04C WAR 1-LAND 6 COLD 610PP 14 106 54 0.20 105 P4 TWD 10 04C +0.40 04C 04C WAR 1_Land 6 COLD 610PP 13 107 85 0.26 96 P4 TWD 12 05H +0.35 05H 05H WAR 2_Land 56 HOT 610PP 26 0.21 280 P4 TWD 10 05H -0.77 05H 05H WAR 2_Land 56 HOT 610PP 26 108 52 0.32 93 P4 TWD 14 04H +0.48 04H 04H WAR 2_Land 56 HOT 610PP 19 108 84 0.26 101 P4 TWD 12 06H -0.59 06H 06H WAR 2_Land 56 HOT 610PP 25 110 72 0.22 110 P4 TWD 10 06C -0.61 06C 06C WAR 1_Land 6 COLD 610PP 10 111 75 0.20 94 P4 TWD 10 06H +0.35 06H 06H WAR 1_Land 56 HOT 610PP 21 112 60 0.36 101 P4 TWD 15 04C +0.43 04C 04C WAR 1_Land 6 COLD 610PP 12 112 76 0.36 283 P4 TWD 16 05H -0.59 05H 05H WAR 1_Land 56 HOT 610PP 22 113 67 0.29 97 P4 TWD 14 06C +0.45 06C 07C WAR 1-LAND 6 COLD 610PP 11 0.30 98 P4 TWD 13 07C +0.53 06C 07C WAR 3_Land 6 COLD 610PP 11 Total Tubes : 14 Total Records: 16 Page 67 of 93

GROUP TUBES A QueryM1[1] 14 Ameren - Callaway Unit 1 4/16 - 1R21 TSP %TWD 10-19%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:23:33 2016 Ameren: S/G C HOT AREVA S/G C TOTAL TUBES: 5872 HOT SELECTED TUBES: 14 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 130 120 110 100 90 80 70 60 50 40 30 20 10 MANWAY NOZZLE Page 68 of 93

AREVA NP Inc 04/19/16 03:24:35 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G C Page 1 of 1 TSP %TWD 20-29%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

Total Tubes : 0 Total Records: 0 Page 69 of 93

AREVA NP Inc 04/19/16 03:25:21 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G C Page 1 of 1 TSP %TWD 30-39%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

Total Tubes : 0 Total Records: 0 Page 70 of 93

AREVA NP Inc 04/19/16 03:26:14 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G C Page 1 of 1 TSP %TWD 40-100%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

Total Tubes : 0 Total Records: 0 Page 71 of 93

GROUP TUBES A QueryM1[1] 14 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD < 10%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:54:31 2016 Ameren: S/G D HOT AREVA S/G D TOTAL TUBES: 5872 HOT SELECTED TUBES: 14 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 72 of 93

AREVA NP Inc 04/19/16 04:14:42 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G D Page 1 of 1 AVB %TWD < 10%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

55 123 0.14 84 P2 TWD 8 AV3 -0.19 TEC TEH 38 HOT 610HS 33 63 19 0.09 132 P2 TWD 6 AV3 -0.19 TEC TEH 9 HOT 610HS 41 65 63 0.10 40 P2 TWD 6 AV4 -0.07 TEC TEH 17 HOT 610HS 22 70 54 0.13 93 P2 TWD 8 AV4 -0.05 TEC TEH 14 HOT 610HS 32 72 56 0.14 124 P2 TWD 9 AV3 -0.02 TEC TEH 14 HOT 610HS 62 0.09 144 P2 TWD 6 AV2 +0.00 TEC TEH 14 HOT 610HS 62 76 60 0.13 37 P2 TWD 8 AV6 -0.05 TEC TEH 14 HOT 610HS 122 77 73 0.09 125 P2 TWD 6 AV4 +0.07 TEC TEH 27 HOT 610HS 99 78 68 0.12 66 P2 TWD 8 AV6 -0.19 TEC TEH 26 HOT 610HS 18 0.09 93 P2 TWD 6 AV5 +0.12 TEC TEH 26 HOT 610HS 18 0.10 130 P2 TWD 6 AV4 -0.07 TEC TEH 26 HOT 610HS 18 80 58 0.14 133 P2 TWD 9 AV6 +0.00 TEC TEH 15 HOT 610HS 92 84 66 0.10 145 P2 TWD 6 AV3 +0.07 TEC TEH 17 HOT 610HS 74 86 72 0.13 56 P2 TWD 8 AV5 -0.17 TEC TEH 26 HOT 610HS 80 88 60 0.14 110 P2 TWD 8 AV5 -0.02 TEC TEH 14 HOT 610HS 119 98 66 0.11 51 P2 TWD 7 AV6 +0.12 TEC TEH 16 HOT 610HS 70 0.10 88 P2 TWD 6 AV2 -0.14 TEC TEH 16 HOT 610HS 70 101 49 0.11 146 P2 TWD 7 AV5 -0.30 TEC TEH 13 HOT 610HS 117 Total Tubes : 14 Total Records: 18 Page 73 of 93

GROUP TUBES A QueryM1[1] 14 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD < 10%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:54:31 2016 Ameren: S/G D HOT AREVA S/G D TOTAL TUBES: 5872 HOT SELECTED TUBES: 14 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 74 of 93

GROUP TUBES A QueryM1[1] 15 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 10-19%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:57:50 2016 Ameren: S/G D HOT AREVA S/G D TOTAL TUBES: 5872 HOT SELECTED TUBES: 15 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 75 of 93

AREVA NP Inc 04/19/16 03:56:32 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G D Page 1 of 1 AVB %TWD 10-19%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

66 92 0.25 128 P2 TWD 13 AV4 -0.02 TEC TEH 33 HOT 610HS 132 0.24 145 P2 TWD 13 AV3 -0.05 TEC TEH 33 HOT 610HS 132 70 54 0.42 112 P2 TWD 19 AV5 -0.05 TEC TEH 14 HOT 610HS 32 72 56 0.25 121 P2 TWD 13 AV5 +0.00 TEC TEH 14 HOT 610HS 62 76 60 0.21 123 P2 TWD 12 AV3 -0.07 TEC TEH 14 HOT 610HS 122 78 68 0.18 135 P2 TWD 10 AV3 -0.07 TEC TEH 26 HOT 610HS 18 80 60 0.22 100 P2 TWD 12 AV4 -0.02 TEC TEH 14 HOT 610HS 121 0.20 102 P2 TWD 11 AV3 -0.02 TEC TEH 14 HOT 610HS 121 86 72 0.18 83 P2 TWD 10 AV4 -0.05 TEC TEH 26 HOT 610HS 80 88 60 0.26 89 P2 TWD 14 AV4 -0.07 TEC TEH 14 HOT 610HS 119 88 72 0.35 122 P2 TWD 17 AV5 -0.02 TEC TEH 27 HOT 610HS 83 0.31 113 P2 TWD 15 AV4 -0.05 TEC TEH 27 HOT 610HS 83 90 80 0.30 98 P2 TWD 15 AV5 -0.05 TEC TEH 32 HOT 610HS 29 92 58 0.29 138 P2 TWD 15 AV3 -0.07 TEC TEH 15 HOT 610HS 89 94 70 0.23 137 P2 TWD 13 AV2 -0.05 TEC TEH 26 HOT 610HS 46 98 66 0.19 98 P2 TWD 11 AV5 -0.02 TEC TEH 16 HOT 610HS 70 99 71 0.17 76 P2 TWD 10 AV3 -0.05 TEC TEH 26 HOT 610HS 71 106 60 0.30 132 P2 TWD 15 AV2 +0.00 TEC TEH 14 HOT 610HS 114 Total Tubes : 15 Total Records: 18 Page 76 of 93

GROUP TUBES A QueryM1[1] 15 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 10-19%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:57:50 2016 Ameren: S/G D HOT AREVA S/G D TOTAL TUBES: 5872 HOT SELECTED TUBES: 15 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 77 of 93

GROUP TUBES A QueryM1[1] 5 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 20-29%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:59:47 2016 Ameren: S/G D HOT AREVA S/G D TOTAL TUBES: 5872 HOT SELECTED TUBES: 5 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 78 of 93

AREVA NP Inc 04/19/16 03:58:38 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G D Page 1 of 1 AVB %TWD 20-29%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

76 60 0.88 114 P2 TWD 28 AV5 -0.05 TEC TEH 14 HOT 610HS 122 0.50 116 P2 TWD 21 AV4 -0.02 TEC TEH 14 HOT 610HS 122 80 58 0.93 122 P2 TWD 29 AV2 +0.00 TEC TEH 15 HOT 610HS 92 88 72 0.52 113 P2 TWD 21 AV6 -0.02 TEC TEH 27 HOT 610HS 83 92 58 0.48 136 P2 TWD 21 AV5 -0.05 TEC TEH 15 HOT 610HS 89 99 71 0.57 122 P2 TWD 23 AV2 -0.07 TEC TEH 26 HOT 610HS 71 Total Tubes : 5 Total Records: 6 Page 79 of 93

GROUP TUBES A QueryM1[1] 5 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 20-29%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:59:47 2016 Ameren: S/G D HOT AREVA S/G D TOTAL TUBES: 5872 HOT SELECTED TUBES: 5 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 80 of 93

GROUP TUBES A QueryM1[1] 2 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 30-39%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 04:01:48 2016 Ameren: S/G D HOT AREVA S/G D TOTAL TUBES: 5872 HOT SELECTED TUBES: 2 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 81 of 93

AREVA NP Inc 04/19/16 04:00:33 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G D Page 1 of 1 AVB %TWD 30-39%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

80 58 1.71 119 P2 TWD 36 AV5 -0.02 TEC TEH 15 HOT 610HS 92 1.59 123 P2 TWD 35 AV4 -0.02 TEC TEH 15 HOT 610HS 92 2.02 117 P2 TWD 38 AV3 +0.00 TEC TEH 15 HOT 610HS 92 92 58 1.05 127 P2 TWD 30 AV4 -0.02 TEC TEH 15 HOT 610HS 89 Total Tubes : 2 Total Records: 4 Page 82 of 93

GROUP TUBES A QueryM1[1] 2 Ameren - Callaway Unit 1 4/16 - 1R21 AVB %TWD 30-39%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 04:01:48 2016 Ameren: S/G D HOT AREVA S/G D TOTAL TUBES: 5872 HOT SELECTED TUBES: 2 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 83 of 93

AREVA NP Inc 04/19/16 04:02:35 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G D Page 1 of 1 AVB %TWD 40-100%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

Total Tubes : 0 Total Records: 0 Page 84 of 93

GROUP TUBES A QueryM1[1] 8 Ameren - Callaway Unit 1 4/16 - 1R21 TSP %TWD < 10%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:28:34 2016 Ameren: S/G D HOT AREVA S/G D TOTAL TUBES: 5872 HOT SELECTED TUBES: 8 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 85 of 93

AREVA NP Inc 04/19/16 03:27:19 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G D Page 1 of 1 TSP %TWD < 10%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

88 72 0.22 261 P4 TWD 7 08C -0.80 08C 08C WAR 2_Land 8 COLD 610PP 8 0.24 97 P4 TWD 8 08C +0.27 08C 08C WAR 2_Land 8 COLD 610PP 8 98 92 0.19 99 P4 TWD 5 04H +0.43 04H 04H WAR 2_Land 63 HOT 610PP 18 0.11 296 P4 TWD 3 04H -0.59 04H 04H WAR 2_Land 63 HOT 610PP 18 104 46 0.20 283 P4 TWD 6 04H -0.69 04H 04H WAR 2_Land 63 HOT 610PP 13 0.17 286 P4 TWD 5 04H -0.69 04H 04H WAR 2_Land 63 HOT 610PP 13 106 56 0.13 256 P4 TWD 4 06H -0.83 06H 06H WAR 2_Land 63 HOT 610PP 14 0.08 105 P4 TWD 2 06H +0.32 06H 06H WAR 2_Land 63 HOT 610PP 14 108 76 0.28 287 P4 TWD 8 06H +0.37 06H 06H WAR 1_Land 63 HOT 610PP 17 110 56 0.15 102 P4 TWD 4 04H -0.67 04H 04H WAR 2_Land 63 HOT 610PP 15 0.15 106 P4 TWD 4 04H -0.67 04H 04H WAR 2_Land 63 HOT 610PP 15 110 76 0.14 101 P4 TWD 4 04C +0.35 04C 04C WAR 1_Land 8 COLD 610PP 9 113 63 0.27 281 P4 TWD 8 04H +0.48 04H 04H WAR 3_Land 63 HOT 610PP 16 0.16 123 P4 TWD 4 04H -0.59 04H 04H WAR 3_Land 63 HOT 610PP 16 0.11 128 P4 TWD 3 04H -0.59 04H 04H WAR 3_Land 63 HOT 610PP 16 Total Tubes : 8 Total Records: 15 Page 86 of 93

GROUP TUBES A QueryM1[1] 8 Ameren - Callaway Unit 1 4/16 - 1R21 TSP %TWD < 10%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:28:34 2016 Ameren: S/G D HOT AREVA S/G D TOTAL TUBES: 5872 HOT SELECTED TUBES: 8 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 87 of 93

GROUP TUBES A QueryM1[1] 1 Ameren - Callaway Unit 1 4/16 - 1R21 TSP %TWD 10-19%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:31:02 2016 Ameren: S/G D HOT AREVA S/G D TOTAL TUBES: 5872 HOT SELECTED TUBES: 1 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 88 of 93

AREVA NP Inc 04/19/16 03:29:31 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G D Page 1 of 1 TSP %TWD 10-19%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

91 105 0.35 99 P4 TWD 11 06H +0.35 06H 06H WAR 1_Land 63 HOT 610PP 19 Total Tubes : 1 Total Records: 1 Page 89 of 93

GROUP TUBES A QueryM1[1] 1 Ameren - Callaway Unit 1 4/16 - 1R21 TSP %TWD 10-19%

AREVA - FDMS map module Version 11.0 SCALE: 0.084494 X Tue Apr 19 03:31:02 2016 Ameren: S/G D HOT AREVA S/G D TOTAL TUBES: 5872 HOT SELECTED TUBES: 1 PRIMARY FACE OUT OF SERVICE (#): NA 110 110 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 10 20 30 40 50 60 70 80 90 100 110 120 130 NOZZLE MANWAY Page 90 of 93

AREVA NP Inc 04/19/16 03:31:46 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G D Page 1 of 1 TSP %TWD 20-29%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

Total Tubes : 0 Total Records: 0 Page 91 of 93

AREVA NP Inc 04/19/16 03:32:35 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G D Page 1 of 1 TSP %TWD 30-39%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

Total Tubes : 0 Total Records: 0 Page 92 of 93

AREVA NP Inc 04/19/16 03:33:20 Customer: Ameren Plant: Callaway Unit: 1 Component: S/G D Page 1 of 1 TSP %TWD 40-100%

QUERY: QueryM1[1] .qry ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE INDEX

==== ====== === === === === ======================== === ==== ======== ======== ===== ======== ============= =

Total Tubes : 0 Total Records: 0 Page 93 of 93