WAmeren MISSOURI Callaway Plant March 20, 2013 ULNRC-05971 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:
10 CFR 2.101 1 0 CFR 2.1 09(b) 10 CFR 50.4 10 CFR 50.30 10 CFR 51.53(c) 10 CFR 54 DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO.
FACILITY OPERATING LICENSE NPF-30 COMMITMENT REGARDING NFPA 805 GAP ANALYSIS FOR THE CALLA WAY LRA
References:
- 1) ULNRC-05830 dated December 15, 2011
- 2) ULNRC-05946 dated January 10,2013 By the Reference 1 letter, Union Electric Company (Ameren Missouri) submitted a license renewal application (LRA) for Callaway Plant Unit 1. Reference 2 dated January 10, 2013 transmitted a revised commitment (LRA Table A4-1, Item 39) to provide a gap analysis between the LRA and NFPA 805 post-transition changes. This analysis was to be provided prior to March 25, 2013, if the draft NFPA 805 Safety Evaluation Report (SER) was available in February 2013. The draft NFPA 805 SER is not available at this time. Pending further discussions with the NRC, Ameren Missouri will provide a formal update to Item 39 in LRA Table A4-1 in a future LRA Amendment transmittal.
If you have any questions, please contact me at (573) 823-9286 or Ms. Sarah Kovaleski at (314) 225-1134.
DS/SGK/nls Sincerely,
&~.)~
Les H. Kanuckel Director Engineering Design PO Box 620 Fulton, MD 65251 AmerenMissouri.com
ULNRC-05971 March 20, 2013 Page2 cc:
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Mr. Elmo E. Collins Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Samuel Cuadrado De Jesus Project Branch 1 Division of License Renewal Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. Fred Lyon Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 Mr. Gregory A. Pick U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511
ULNRC-05971 March 20, 2013 Page 3 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:
A. C. Heflin F. M. Diya C. 0. Reasoner III D. W. Neterer L. H. Graessle J. S. Geyer S. A. Maglio R. Holmes-Bobo NSRB Secretary L. H. Kanuckel G. S. Kremer S. G. Kovaleski T. B. Elwood G. G. Yates E. Blocher (STARS PAM COB)
Mr. Mike Westman (WCNOC)
Mr. Tim Hope (Luminant Power)
Mr. Ron Barnes (APS)
Mr. Tom Baldwin (PG&E)
Mr. Mike Murray (STPNOC)
Mr. Mark Morgan (SCE)
Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)