ULNRC-05772, Nuclear Property Insurance Reporting
| ML110940092 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 04/01/2011 |
| From: | Maglio S Ameren Missouri |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| ULNRC-05772 | |
| Download: ML110940092 (5) | |
Text
~~
WAmeren MISSOURI Callaway Plant April 1, 2011 ULNRC-05772 u.s. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:
10 CFR 50. 54(w)
DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO.
FACILITY OPERATING LICENSE NPF-30 NUCLEAR PROPERTY INSURANCE REPORTING In accordance with established federal nuclear property insurance reporting requirements (10 CFR 50. 54(w)), the attached report provides the present level of insurance and the sources of insurance that are applicable to the Callaway Plant.
This letter does contain new commitments.
If there are any questions concerning this letter, contact Scott Maglio at 573-676-8719.
EMF/nls Enclosure Sincerely, xJCo~2 Scott Maglio Regulatory airs Manager PO Box 620 Fulton, MO 65251 AmerenMissouri.com
ULNRC-05772 April 1, 2011 Page 2 cc:
Mr. Elmo E. Collins, Jr.
Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Senior Resident Inspector Callaway Resident Office U. S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)
Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8G14 Washington, DC 20555-2738 Mr. James Polickoski Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8B lA Washington, DC 20555-2738
ULNRC-05772 April 1, 2011 Page 3 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
A. C. Heflin F. M. Diya C. O. Reasoner III L. S. Sandbothe S.M.Maglio T. B. Elwood S. L. Gallagher T. L. Woodward (NSRB)
Mr. Paul Parmenter, Director (SEMA)
Mr. Thomas Mohr, Senior REP Planner (SEMA)
Mr. John Campbell, REP Planner (SEMA)
Ms. Diane M. Hooper (WCNOC)
Mr. Tim Hope (Luminant Power)
Mr. Ron Barnes (APS)
Mr. Tom Baldwin (pG&E)
Mr. Wayne Harrison (STPNOC)
Ms. Linda Conklin (SCE)
Mr. John O'Neill (pillsbury Winthrop Shaw Pittman LLP)
Mr. Dru Buntin (DNR)
Mr. T. B. Elwood:
March 10,2011 Re: Nuclear Property Insurance NRC Property Rule 10 CFR 50.54 (W)
Reporting Requirements The subject NRC reporting requirement stipulates that on April 1, of each year, the licensee for each commercial nuclear reactor site provide to the NRC a description of the nuclear property insurance in force.
Attached is a schedule I have prepared for the current year's filing. I understand that all correspondence to the NRC is to be logged via your established numbering system and distribution of copies made according to your established procedure. Accordingly, please file the original at the appropriate time and make the necessary distribution of copies.
MEB/bjI Attachment cc with attachment:
A. C. Heflin E. M. Fast
UNION ELECTRIC COMPANY - CALLA WAY PLANT NUCLEAR PROPERTY INSURANCE - April 1, 2011 10 CFR SO.S4(W) REPORTING REQUIREMENTS In accordance with established federal nuclear property insurance reporting requirements [10 CFR SO.S4(W)], this is to advise that on April 1, 20 Ill, Union Electric Company will have in force the below listed coverages which are applicable to its Callaway Nuclear Plant.
- 1.
Primary Nuclear Property Insurance
- a.
Nuclear Electric Insurance, Ltd.
- 2.
Excess Nuclear Property Insurance
- a.
Nuclear Electric Insurance, Ltd.
Grand Total MEB/bjl
$ SOO,OOO,OOO
$2,2S0,000,000
$2,7S0,000,000 Mark E. Blair Manager - Insurance Risk Management