MONTHYEARULNRC-04103, Application for Amend to License NPF-30,reflecting USQ Associated with Increases to Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents1999-09-0808 September 1999 Application for Amend to License NPF-30,reflecting USQ Associated with Increases to Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents ULNRC-04024, Suppl 1 to Application to License NPF-30,adding License Conditions to Address Surveillance Requirements as Described in Ltr1999-04-30030 April 1999 Suppl 1 to Application to License NPF-30,adding License Conditions to Address Surveillance Requirements as Described in Ltr ULNRC-03910, Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld1998-10-27027 October 1998 Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld ULNRC-03902, Application for Amend to License NPF-30,revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start Turbine Driven Pump in TS Tables 3.3-3,3.3-4 & 4.3.21998-09-29029 September 1998 Application for Amend to License NPF-30,revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start Turbine Driven Pump in TS Tables 3.3-3,3.3-4 & 4.3.2 ULNRC-03873, Application for Amend to License NPF-30,revising TS Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr1998-07-30030 July 1998 Application for Amend to License NPF-30,revising TS Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr ULNRC-03854, Application for Amend to License NPF-30,revising TS 3.7.1.7 Re SG Atmospheric Steam Dump Lines1998-06-29029 June 1998 Application for Amend to License NPF-30,revising TS 3.7.1.7 Re SG Atmospheric Steam Dump Lines ML20216F3731998-03-0909 March 1998 Application for Amend to License NPF-30,revising TS SR 3/4.5.2b.1 by Adding Clarification in Regard to Venting & ECCS Pump Casings & Accessible Discharge Piping High Points ML20198P3321997-10-31031 October 1997 Application for Amend to License NPF-30,reducing Repeated Alarms,Rod Blocks & Partial Reactor Trips That Continue to Manifest,During Beginning of Cycle Operation Following Refueling Outages ML20198P4081997-10-31031 October 1997 Application for Amend to License NPF-30,revising Tech Specs Tables 3.3-3,3.3-4 & 4.3-2 Re ESFAS Functional Unit 6.f, Loss of Offsite Power-Start Turbine-Driven Pump ML20217K2281997-10-17017 October 1997 Application for Amend to License NPF-30,revising TS 3/4.4.9, Pressure/Temperature Limits. Westinghouse Repts WCAP-14894,WCAP-14896 & WCAP-14895 Encl W/Application.Review & Approval of Amend Application Requested by 970301 ULNRC-03627, Application for Amend to License NPF-30,revising TS Table 3.7-2 Specifying That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer1997-08-0808 August 1997 Application for Amend to License NPF-30,revising TS Table 3.7-2 Specifying That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer ULNRC-03628, Application for Amend to License NPF-30,revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 as Listed1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 as Listed ULNRC-03626, Application for Amend to License NPF-30,revising Tech Spec 3/4.7.4, Essential Svc Water Sys, by Removing Requirement to Perform SRs 4.7.4.b.1,4.7.4.b.2 & 4.7.4.c During Shutdown1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Tech Spec 3/4.7.4, Essential Svc Water Sys, by Removing Requirement to Perform SRs 4.7.4.b.1,4.7.4.b.2 & 4.7.4.c During Shutdown ULNRC-03625, Application for Amend to License NPF-30,revising Tech Spec 3/4.3 Re Instrumentation & Changing Slave Relay Quarterly Surveillance to Quarterly Actuation Logic Test for Ms & FW Isolation Sys Actuation & Relays1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Tech Spec 3/4.3 Re Instrumentation & Changing Slave Relay Quarterly Surveillance to Quarterly Actuation Logic Test for Ms & FW Isolation Sys Actuation & Relays ML20148C4541997-05-15015 May 1997 Application for Amend to License NPF-30,adding License Condition to Address Surveillance Requirements Not Previously Performed by Existing Requirements or Tests ML20138B7301997-04-24024 April 1997 Application for Amend to License NPF-30,revising Title Senior Vice President,Nuclear to Vice President & Chief Nuclear Officer, Due to Retirement on 970430 & Replacement by GL Randolph on 970501 ML20137N6031997-04-0101 April 1997 Application for Amend to License NPF-30,requesting Rev to TS Table 3.3-3 Re Engineered Safety Features Actuation Sys Instrumentation ULNRC-03402, Application for Amend to License NPF-30,changing TS 3/4.7.7,3/4.9.13 & Corresponding Bases Re Charcoal Test Methodology for Emergency Exhaust Sys1996-07-18018 July 1996 Application for Amend to License NPF-30,changing TS 3/4.7.7,3/4.9.13 & Corresponding Bases Re Charcoal Test Methodology for Emergency Exhaust Sys ML20112E8731996-05-29029 May 1996 Application for Amend to License NPF-30,modifying Pneumatic Valve Control Configuration for Main Feedwater Control & Bypass Valves & Reflecting Unreviewed Safety Question Associated W/Mod ML20107M4401996-04-24024 April 1996 Application for Amend to License NPF-30,transferring License to Reflect Licensee as wholly-owned Operating Subsidiary of Ameren ML20107H3551996-04-17017 April 1996 Application for Amend to License NPF-30,adding Ms & FW Isolation Sys Actuation Logic & Relays to Functional Units 4.b & 5.a of Tables 3.3-3,3.3-4 & 4.3-2.Revise Table 3.3-3 by Adding Action Statements 27a & 34a ML20107E3171996-04-12012 April 1996 Application for Amend to License NPF-30,revising TS 3/4.4.5, SGs & 3.4.6.2, Operational Leakage & Associated Bases to Address Installation of Laser Welded Tube Sleeves in Plant Sgs.Supporting Proprietary TR Encl.Proprietary TR Withheld ML20107F0421996-04-12012 April 1996 Application for Amend to License NPF-30,changing TS 3/4.4, RCS & Associated Bases to Address Installation of Electrosleeves in Callaway Plant Sgs.Info Re Installation Process in TR BAW-10219P,Rev 1 Dtd Mar 1996 Withheld ULNRC-03349, Application for Amend to License NPF-30,implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled1996-03-22022 March 1996 Application for Amend to License NPF-30,implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled ML20106G4091996-02-23023 February 1996 Application for Amend to License NPF-30,reflecting Union Electric as Wholly Owned Subsidiary of Ameren Corp ML20097D5681996-02-0909 February 1996 Application for Amend to License NPF-30,proposing Change to TS 5.3.1,to Allow Use of Alternate Zirconium Based Fuel Cladding Material ML20097D6021996-02-0909 February 1996 Application for Amend to License NPF-30,proposing Changes to TS 4.6.1.2.a & Bases Re Containment Systems ML20097F8891996-02-0909 February 1996 Application for Amend to License NPF-30,revising TS 4.6.1.2.a Re Containment Sys ML20096B1811996-01-0202 January 1996 Application for Amend to License NPF-30,revising TS 3.9.4, Containment Bldg Penetrations & Associated Bases Section to Allow Containment Personnel Airlock Doors to Be Open During Core Alterations ULNRC-03264, Application for Amend to License NPF-30,revising TS Sections 5.3.1 & 5.6.1.1 & Figure 3.9-1 Re Spent Fuel Pool Storage. Rev 0 of Rept LFNF-95-02, Callaway Plant Region 1 Spent Fuel Rack Criticality Analysis Encl1995-09-0606 September 1995 Application for Amend to License NPF-30,revising TS Sections 5.3.1 & 5.6.1.1 & Figure 3.9-1 Re Spent Fuel Pool Storage. Rev 0 of Rept LFNF-95-02, Callaway Plant Region 1 Spent Fuel Rack Criticality Analysis Encl ULNRC-03244, Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in EDG Reliability & Availability Based Upon,In Part,Guidance of GLs 94-01,93-05 & Reg Guide 1.9,Rev 31995-07-25025 July 1995 Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in EDG Reliability & Availability Based Upon,In Part,Guidance of GLs 94-01,93-05 & Reg Guide 1.9,Rev 3 ML20086B7411995-06-26026 June 1995 Application for Amend to License NPF-30 Removing List of Containment Isolation Valves,Revising Allowed Outage Time for Component Cw Motor Operated Containment Penetration Check Valves as Isolation Devices ULNRC-03230, Application for Amend to License NPF-30.Amend Would Revise TSs to Implement Recommendations of GL 93-05 Re Reduction of SRs for Testing During Power Operation1995-06-23023 June 1995 Application for Amend to License NPF-30.Amend Would Revise TSs to Implement Recommendations of GL 93-05 Re Reduction of SRs for Testing During Power Operation ML20082S7701995-04-26026 April 1995 Application for Amend to License NPF-30.Amend Would Change Surveillance Requirements of TS 3/4.7.6,reducing Upper Limit on Flow Rate Through CR Filtration Subsystem ULNRC-03198, Application for Amend to License NPF-30,changing Table 2.2-1 of TS 2.2.1 to Reduce Repeated Alarms & Partial Reactor Trips Associated w/C-4 Control Sys Interlock & Overpower Delta-T,which Occurred in Past Cycles1995-04-17017 April 1995 Application for Amend to License NPF-30,changing Table 2.2-1 of TS 2.2.1 to Reduce Repeated Alarms & Partial Reactor Trips Associated w/C-4 Control Sys Interlock & Overpower Delta-T,which Occurred in Past Cycles ULNRC-03184, Application for Amend to License NPF-30,responding to Concerns Raised by NRC Staff During Review of Final Policy Statement on TS Improvements1995-03-29029 March 1995 Application for Amend to License NPF-30,responding to Concerns Raised by NRC Staff During Review of Final Policy Statement on TS Improvements ULNRC-03151, Application for Amend to License NPF-30,revising TS 4.6.1.7.4 & Associated Bases Re Containment Ventilation Sys1995-02-24024 February 1995 Application for Amend to License NPF-30,revising TS 4.6.1.7.4 & Associated Bases Re Containment Ventilation Sys ML20078A4731995-01-13013 January 1995 Application for Amend to License NPF-30 for Callaway Plant. Amend Would Relocate TS 3.3-2, Reactor Trip Sys Instrumentation Response Times ML20080C7531994-12-0909 December 1994 Application for Amend to License NPF-30,revising TS 4.3.2.2, 4.7.1.2.1 & Bases for Spec 3/4.7.1.2 for Afs ML20078P7001994-12-0909 December 1994 Application for Amend to License NPF-30,revising TS Surveillance Requirement 4.8.1.1.2f.7 to Remove Requirement to Perform Hot Restart within 5 Min of Completing 24 H Test & Place Requirement in Separate TS ML20077F2311994-12-0909 December 1994 Application for Amend to License NPF-30,requesting Exemption to 10CFR50,App J,Section III.D.1(a) & Rev to TS SR 4.6.1.2.a & Associated Bases to Defer Next Scheduled Containment ILRT for One Outage,From Refuel 7 to Refuel 8 ML20073A6091994-09-12012 September 1994 Application for Amend to License NPF-30,revising Tech Specs Table 3.7.1 Re Limit Max Allowable Power Levels W/Inoperable Main Steam Line Safety Valves ML20072T3421994-09-0909 September 1994 Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in Emergency Diesel Generator Reliability & Availability ML20073A6841994-09-0909 September 1994 Application for Amend to License NPF-30,revising Tech Specs 3/4.8.2.1,3/4.8.2.2,3/4.8.3.1 & 3/4.8.3.2 Re Electrical Power Sys Dc Sources & Onsite Power Distribution ML20072U4381994-09-0808 September 1994 Application for Amend to License NPF-30,revising TS 4.2.2.2, 4.2.2.4 & 6.9.19 to Incorporate Penalty in COLR to Account for Fq Increases Greater That 2% Between Measurements ML20072U7551994-09-0808 September 1994 Application for Amend to License NPF-30,reflecting Unreviewed Safety Question Associated W/Use of Reactor Makeup Water to Rinse Items Removed from Refueling Pool & Spray Down Refueling Pool ML20072A9671994-08-0404 August 1994 Application for Amend to License NPF-30,replacing TS 3/4.6.2.2, Spray Additive Sys W/Spec 3/4.6.2.2 Entitled, Recirculation Fluid Ph Control (Rfpc) Sys, Supporting Passive Rfpc Sys Consisting of Stainless Steel Baskets ML20072A0761994-08-0404 August 1994 Application for Amend to License NPF-30,revising TS to Reflect Changes in Boron Dilution Accident Analysis to Address Boron Dilution Mitigation Sys (Bdms) Time Delays & Bdms Actuation Setpoint Uncertainty ML20070A7931994-06-21021 June 1994 Application for Amend to License NPF-30,deleting TS Sections Describing On-Site Review Committee & Nuclear Safety Review Board ML20069D7321994-05-20020 May 1994 Application for Amend to License NPF-30,modifying TSs to Incorporate Improvements in Scope & Content Endorsed by NRC in Final Policy Statement on TS Improvements for Nuclear Power reactors,58FR39132 1999-09-08
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARULNRC-04103, Application for Amend to License NPF-30,reflecting USQ Associated with Increases to Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents1999-09-0808 September 1999 Application for Amend to License NPF-30,reflecting USQ Associated with Increases to Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents ULNRC-04024, Suppl 1 to Application to License NPF-30,adding License Conditions to Address Surveillance Requirements as Described in Ltr1999-04-30030 April 1999 Suppl 1 to Application to License NPF-30,adding License Conditions to Address Surveillance Requirements as Described in Ltr ULNRC-03910, Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld1998-10-27027 October 1998 Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld ULNRC-03902, Application for Amend to License NPF-30,revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start Turbine Driven Pump in TS Tables 3.3-3,3.3-4 & 4.3.21998-09-29029 September 1998 Application for Amend to License NPF-30,revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start Turbine Driven Pump in TS Tables 3.3-3,3.3-4 & 4.3.2 ULNRC-03873, Application for Amend to License NPF-30,revising TS Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr1998-07-30030 July 1998 Application for Amend to License NPF-30,revising TS Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr ULNRC-03854, Application for Amend to License NPF-30,revising TS 3.7.1.7 Re SG Atmospheric Steam Dump Lines1998-06-29029 June 1998 Application for Amend to License NPF-30,revising TS 3.7.1.7 Re SG Atmospheric Steam Dump Lines ML20216F3731998-03-0909 March 1998 Application for Amend to License NPF-30,revising TS SR 3/4.5.2b.1 by Adding Clarification in Regard to Venting & ECCS Pump Casings & Accessible Discharge Piping High Points ML20198P3321997-10-31031 October 1997 Application for Amend to License NPF-30,reducing Repeated Alarms,Rod Blocks & Partial Reactor Trips That Continue to Manifest,During Beginning of Cycle Operation Following Refueling Outages ML20198P4081997-10-31031 October 1997 Application for Amend to License NPF-30,revising Tech Specs Tables 3.3-3,3.3-4 & 4.3-2 Re ESFAS Functional Unit 6.f, Loss of Offsite Power-Start Turbine-Driven Pump ML20217K2281997-10-17017 October 1997 Application for Amend to License NPF-30,revising TS 3/4.4.9, Pressure/Temperature Limits. Westinghouse Repts WCAP-14894,WCAP-14896 & WCAP-14895 Encl W/Application.Review & Approval of Amend Application Requested by 970301 ULNRC-03627, Application for Amend to License NPF-30,revising TS Table 3.7-2 Specifying That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer1997-08-0808 August 1997 Application for Amend to License NPF-30,revising TS Table 3.7-2 Specifying That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer ULNRC-03628, Application for Amend to License NPF-30,revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 as Listed1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 as Listed ULNRC-03626, Application for Amend to License NPF-30,revising Tech Spec 3/4.7.4, Essential Svc Water Sys, by Removing Requirement to Perform SRs 4.7.4.b.1,4.7.4.b.2 & 4.7.4.c During Shutdown1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Tech Spec 3/4.7.4, Essential Svc Water Sys, by Removing Requirement to Perform SRs 4.7.4.b.1,4.7.4.b.2 & 4.7.4.c During Shutdown ULNRC-03625, Application for Amend to License NPF-30,revising Tech Spec 3/4.3 Re Instrumentation & Changing Slave Relay Quarterly Surveillance to Quarterly Actuation Logic Test for Ms & FW Isolation Sys Actuation & Relays1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Tech Spec 3/4.3 Re Instrumentation & Changing Slave Relay Quarterly Surveillance to Quarterly Actuation Logic Test for Ms & FW Isolation Sys Actuation & Relays ML20148C4541997-05-15015 May 1997 Application for Amend to License NPF-30,adding License Condition to Address Surveillance Requirements Not Previously Performed by Existing Requirements or Tests ML20138B7301997-04-24024 April 1997 Application for Amend to License NPF-30,revising Title Senior Vice President,Nuclear to Vice President & Chief Nuclear Officer, Due to Retirement on 970430 & Replacement by GL Randolph on 970501 ML20137N6031997-04-0101 April 1997 Application for Amend to License NPF-30,requesting Rev to TS Table 3.3-3 Re Engineered Safety Features Actuation Sys Instrumentation ULNRC-03402, Application for Amend to License NPF-30,changing TS 3/4.7.7,3/4.9.13 & Corresponding Bases Re Charcoal Test Methodology for Emergency Exhaust Sys1996-07-18018 July 1996 Application for Amend to License NPF-30,changing TS 3/4.7.7,3/4.9.13 & Corresponding Bases Re Charcoal Test Methodology for Emergency Exhaust Sys ML20112E8731996-05-29029 May 1996 Application for Amend to License NPF-30,modifying Pneumatic Valve Control Configuration for Main Feedwater Control & Bypass Valves & Reflecting Unreviewed Safety Question Associated W/Mod ML20107M4401996-04-24024 April 1996 Application for Amend to License NPF-30,transferring License to Reflect Licensee as wholly-owned Operating Subsidiary of Ameren ML20107H3551996-04-17017 April 1996 Application for Amend to License NPF-30,adding Ms & FW Isolation Sys Actuation Logic & Relays to Functional Units 4.b & 5.a of Tables 3.3-3,3.3-4 & 4.3-2.Revise Table 3.3-3 by Adding Action Statements 27a & 34a ML20107E3171996-04-12012 April 1996 Application for Amend to License NPF-30,revising TS 3/4.4.5, SGs & 3.4.6.2, Operational Leakage & Associated Bases to Address Installation of Laser Welded Tube Sleeves in Plant Sgs.Supporting Proprietary TR Encl.Proprietary TR Withheld ML20107F0421996-04-12012 April 1996 Application for Amend to License NPF-30,changing TS 3/4.4, RCS & Associated Bases to Address Installation of Electrosleeves in Callaway Plant Sgs.Info Re Installation Process in TR BAW-10219P,Rev 1 Dtd Mar 1996 Withheld ULNRC-03349, Application for Amend to License NPF-30,implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled1996-03-22022 March 1996 Application for Amend to License NPF-30,implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled ML20106G4091996-02-23023 February 1996 Application for Amend to License NPF-30,reflecting Union Electric as Wholly Owned Subsidiary of Ameren Corp ML20097D5681996-02-0909 February 1996 Application for Amend to License NPF-30,proposing Change to TS 5.3.1,to Allow Use of Alternate Zirconium Based Fuel Cladding Material ML20097D6021996-02-0909 February 1996 Application for Amend to License NPF-30,proposing Changes to TS 4.6.1.2.a & Bases Re Containment Systems ML20097F8891996-02-0909 February 1996 Application for Amend to License NPF-30,revising TS 4.6.1.2.a Re Containment Sys ML20096B1811996-01-0202 January 1996 Application for Amend to License NPF-30,revising TS 3.9.4, Containment Bldg Penetrations & Associated Bases Section to Allow Containment Personnel Airlock Doors to Be Open During Core Alterations ULNRC-03264, Application for Amend to License NPF-30,revising TS Sections 5.3.1 & 5.6.1.1 & Figure 3.9-1 Re Spent Fuel Pool Storage. Rev 0 of Rept LFNF-95-02, Callaway Plant Region 1 Spent Fuel Rack Criticality Analysis Encl1995-09-0606 September 1995 Application for Amend to License NPF-30,revising TS Sections 5.3.1 & 5.6.1.1 & Figure 3.9-1 Re Spent Fuel Pool Storage. Rev 0 of Rept LFNF-95-02, Callaway Plant Region 1 Spent Fuel Rack Criticality Analysis Encl ULNRC-03244, Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in EDG Reliability & Availability Based Upon,In Part,Guidance of GLs 94-01,93-05 & Reg Guide 1.9,Rev 31995-07-25025 July 1995 Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in EDG Reliability & Availability Based Upon,In Part,Guidance of GLs 94-01,93-05 & Reg Guide 1.9,Rev 3 ML20086B7411995-06-26026 June 1995 Application for Amend to License NPF-30 Removing List of Containment Isolation Valves,Revising Allowed Outage Time for Component Cw Motor Operated Containment Penetration Check Valves as Isolation Devices ULNRC-03230, Application for Amend to License NPF-30.Amend Would Revise TSs to Implement Recommendations of GL 93-05 Re Reduction of SRs for Testing During Power Operation1995-06-23023 June 1995 Application for Amend to License NPF-30.Amend Would Revise TSs to Implement Recommendations of GL 93-05 Re Reduction of SRs for Testing During Power Operation ML20082S7701995-04-26026 April 1995 Application for Amend to License NPF-30.Amend Would Change Surveillance Requirements of TS 3/4.7.6,reducing Upper Limit on Flow Rate Through CR Filtration Subsystem ULNRC-03198, Application for Amend to License NPF-30,changing Table 2.2-1 of TS 2.2.1 to Reduce Repeated Alarms & Partial Reactor Trips Associated w/C-4 Control Sys Interlock & Overpower Delta-T,which Occurred in Past Cycles1995-04-17017 April 1995 Application for Amend to License NPF-30,changing Table 2.2-1 of TS 2.2.1 to Reduce Repeated Alarms & Partial Reactor Trips Associated w/C-4 Control Sys Interlock & Overpower Delta-T,which Occurred in Past Cycles ULNRC-03184, Application for Amend to License NPF-30,responding to Concerns Raised by NRC Staff During Review of Final Policy Statement on TS Improvements1995-03-29029 March 1995 Application for Amend to License NPF-30,responding to Concerns Raised by NRC Staff During Review of Final Policy Statement on TS Improvements ULNRC-03151, Application for Amend to License NPF-30,revising TS 4.6.1.7.4 & Associated Bases Re Containment Ventilation Sys1995-02-24024 February 1995 Application for Amend to License NPF-30,revising TS 4.6.1.7.4 & Associated Bases Re Containment Ventilation Sys ML20078A4731995-01-13013 January 1995 Application for Amend to License NPF-30 for Callaway Plant. Amend Would Relocate TS 3.3-2, Reactor Trip Sys Instrumentation Response Times ML20080C7531994-12-0909 December 1994 Application for Amend to License NPF-30,revising TS 4.3.2.2, 4.7.1.2.1 & Bases for Spec 3/4.7.1.2 for Afs ML20078P7001994-12-0909 December 1994 Application for Amend to License NPF-30,revising TS Surveillance Requirement 4.8.1.1.2f.7 to Remove Requirement to Perform Hot Restart within 5 Min of Completing 24 H Test & Place Requirement in Separate TS ML20077F2311994-12-0909 December 1994 Application for Amend to License NPF-30,requesting Exemption to 10CFR50,App J,Section III.D.1(a) & Rev to TS SR 4.6.1.2.a & Associated Bases to Defer Next Scheduled Containment ILRT for One Outage,From Refuel 7 to Refuel 8 ML20073A6091994-09-12012 September 1994 Application for Amend to License NPF-30,revising Tech Specs Table 3.7.1 Re Limit Max Allowable Power Levels W/Inoperable Main Steam Line Safety Valves ML20072T3421994-09-0909 September 1994 Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in Emergency Diesel Generator Reliability & Availability ML20073A6841994-09-0909 September 1994 Application for Amend to License NPF-30,revising Tech Specs 3/4.8.2.1,3/4.8.2.2,3/4.8.3.1 & 3/4.8.3.2 Re Electrical Power Sys Dc Sources & Onsite Power Distribution ML20072U4381994-09-0808 September 1994 Application for Amend to License NPF-30,revising TS 4.2.2.2, 4.2.2.4 & 6.9.19 to Incorporate Penalty in COLR to Account for Fq Increases Greater That 2% Between Measurements ML20072U7551994-09-0808 September 1994 Application for Amend to License NPF-30,reflecting Unreviewed Safety Question Associated W/Use of Reactor Makeup Water to Rinse Items Removed from Refueling Pool & Spray Down Refueling Pool ML20072A9671994-08-0404 August 1994 Application for Amend to License NPF-30,replacing TS 3/4.6.2.2, Spray Additive Sys W/Spec 3/4.6.2.2 Entitled, Recirculation Fluid Ph Control (Rfpc) Sys, Supporting Passive Rfpc Sys Consisting of Stainless Steel Baskets ML20072A0761994-08-0404 August 1994 Application for Amend to License NPF-30,revising TS to Reflect Changes in Boron Dilution Accident Analysis to Address Boron Dilution Mitigation Sys (Bdms) Time Delays & Bdms Actuation Setpoint Uncertainty ML20070A7931994-06-21021 June 1994 Application for Amend to License NPF-30,deleting TS Sections Describing On-Site Review Committee & Nuclear Safety Review Board ML20069D7321994-05-20020 May 1994 Application for Amend to License NPF-30,modifying TSs to Incorporate Improvements in Scope & Content Endorsed by NRC in Final Policy Statement on TS Improvements for Nuclear Power reactors,58FR39132 1999-09-08
[Table view] |
Text
V
.a a 4: . ;
Y i' - 1901 Choutecu Avenue
- , ,, Post Othce Box 149
'~
. St. Louis. Missouri 63166
. < 314-554-2650 ' t b . !
i DonaldF.Schnell NION sernor vice eresisent TRIC Nuclear -
h5 February 24, 1995 l
U.S. Nuclear Regulatory Commission Attn: Document Control Desk ,
Mail Station P1-137 Washington, D.C. 20555 ULNRC-03151 Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT REVISION TO TECHNICAL SPECIFICATION 4.6.1.7.4 CONTAINMENT VENTILATION SYSTEM i i
Union Electric Company herewith transmits an application for amendment to; Facility Operating License No. NPF-30 for Callaway Plant.
This amendment application proposes revising i Technical Specification Surveillance Requirement j 4.6.1.7.4 and its associated Bases to delete the i requirement to verify quarterly that the measured l I
leakage rate is less than 0.05 times the maximum-allowable leakage rate for each 18-inch containment mini-purge supply and exhaust isolation valve. This l requirement would be replaced with a quarterly l requirement to demonstrate operability by verifying l that when the measured leakage rate for these valves is i added to the leakage rates determined pursuant to i Specification 4.6.1.2d for all other Type B and C !
penetrations, the combined leakage rate is less than 0.60 times the maximum allowable leakage rate.
Attachments 1, 2, 3, and 4 contain the Safety Evaluation, the Significant Hazards Evaluation, the l Environmental Consideration, and the Proposed Technical i Specification Changes in support of this amendment nn- . , .
9503090433 950224
~
PDR ADOCK 05000483 PDR P
I
U.S. NuclCOr R gulctory -Conniccion ,
7 , Page 2 :
1
<- request. This. change request has been' approved by the Callaway Onsite Review Committee and the Nuclear' Safety ;
Review Board. l If.you have any questions concerning this matter, !
please contact me. .,
l Very truly yours, ?
?
1 i
Donald F. Schnell l JMC/ dis Attachments: 1) Safety Evaluation l
- 2) Significant Hazards Evaluation ;
- 3) Environmental Consideration ,
- 4) Proposed Technical Specification Changes i
6 I
i
'i l
k l
l s
x ,
F 1
STATE OF MISSOURI. )
)- SS CITY OF ST. LOUIS )
. Donald F. Schnell, of lawful age, being first duly sworn upon oath says that he is Senior Vice President-Nuclear and
- an officer of Union Electric Company; that he has read.the foregoing document _and knows the content thereof; that he has executed the same for and on. behalf of-said company with full power and authority to do'so; and that.the facts therein stated are true and correct to the best of his knowledge, information and belief.
By Donald-F. Schnell Senior Vice President Nuclear SUBSCRIBED and sworn to before me this c8N day of Muw/- , 1995.
.kA&L -
BARBA[A i PkFE NOTARY PUBLIC-STATE OF MISSOURI MT COMMISSJON EXPlRES APRIL 22,1993 ST. LOUIS COUNU
i
!? ' -
i cc: .T. A. Baxter, Esq. i Shaw, Pittman, Potts &_Trowbridge 2300 N. Street, N.W.
Washington, D.C. 20037 M. . H. Fletcher 3 Professional Nuclear Consulting, Inc. '
18225-A Flower Hill Way Gaithersburg,-MD 20879-5334 L. Robert Greger
- , Chief, Reactor Project Branch 1 U.S. Nuclear Regulatory Commission i Region III "
801 Warrenville Road Lisle, IL 60532-4351 Bruce Bartlett &
Callaway Resident Office !
i U.S. Regulatory Commission RR#1 Steedman, MO 65077 ,
L. R. Wharton (2) ;
office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission ,
1 White Flint, North, Mail Stop 13E21 11555 Rockville Pike 'i' Rockville, MD 20852-2738 Manager, Electric Department !
Missouri Public Service Commission P.O. Box 360 i Jefferson City, MO 65102 ,
Ron Kucera r Department of Natural Resources l P.O. Box 176 i Jefferson City, MO 65102 :
6 1
i i
)
l l !
1 I
I
s Attachment 1
. . Paga 1 of 3 ULNRC4 3151 SAFETY EVALUATION Pronosed Chance This amendment request revises Technical Specification (T/S)
Surveillance Request 4.6.1.7.4 and its associated Bases to delete the requirement to verify quarterly that the measured leakage rate is less than 0.05 times the maximum allowable leakage rate ( L, ) ,
for each 18-inch containment mini-purge supply and exhaust isolation valve. This requirement would be replaced with a quarterly requirement to demonstrate operability by verifying that when the measured leakage rate for these valves is added to the leakage rates determined pursuant to Specification 4.6.1.2d for all other Type B and C penetrations, the combined leakage rate is less than 0.60 L,.
Backaround The containment mini-purge supply and exhaust isolation valves are 18-inch damper type valves that are pneumatically operated. These valves are automatic valves that close on receipt of a Containment Purge Isolation Signal (CPIS). They have a resilient seal for proper valve seating and are required to close in less than 5 seconds to provide containment isolation.
During power generation operation the mini-purge system is ]
designed to minimize occupational exposures to '
as-low-as-reasonably-achievable (ALARA) levels. Instead of i personnel entering the containment with airborne activities much l greater than the maximum permissible concentration, the l containment will be purged to reduce airborne radioactivity l concentrations and exposures in line with the philosophy of 10 CPR 20 and Regulatory Guide 8.15. The mini-purge system is designed to be operated continuously to achieve these objectives. l The need for continuous operation includes consideration for planned and unplanned entries into the containment and the need to periodically vent excess air from the containment to maintain the pressure near atmospheric conditions. The mini-purge system is manually initiated from the control room. Exhaust from the containment is processed through the containment purge exhaust system charcoal adsorption train prior to being discharged through the unit vent. The containment purge exhaust system is monitored for radioactivity, both upstream and downstream of the charcoal adsorber.
During emergency operation, both the containment shutdown purge and the containment mini-purge isolation valves are automatically closed upon receipt of a CPIS. The CPIS is initiated by receipt of a safety injection signal or by high radioactivity levels in the purge exhaust radiation monitors. The containment purge isolation valves are designed for rapid closure to minimize release of containment effluents following postulated accident conditions. The containment mini-purge isolation valves are designed for tight closure within 5 seconds after receipt of an isolation signal.
. Attcchment 1
ULNRC-03151 Evaluation The containment mini-purge isolation valves are used to provide-containment integrity during normal and emergency operations. ,
Removal of the individual leakage rate acceptance criteria for j these valves will not affect the consequences of an accident since !
the overall Type B and C containment leakage rate will be maintained less than the 10 CFR 50 Appendix J acceptance criterion i of 0.60 L, .
l The primary functions that the mini-purge valves provide are !
closure in 5 seconds upon receipt of a CPIS and to seal tightly I such that the overall Type B and C containment leakage rate l remains below 0.60 L, . The deletion of the individual leakage l rate acceptance criterion for these valves will not affect their closure stroke time, nor will it impact the ability to detect ;
early valve seal degradation to prevent seal failures. These valves will still be required to undergo quarterly testing for leakage rate which will be used as the mechanism for seal degradation detection. Instead of an individual acceptance I criteria, their leakage rate will be added to the combined leakage rate for all Type B and C penetrations.
The current T/S surveillance requirement is not contained in NUREG-1431, " Standard Technical Specifications-Westinghouse Plants." It allows the use of acceptance criteria in accordance with 10 CFR 50, Appendix J, which would be the Type B and C combined leakage rate of less than 0.60 L, . The NUREG-1431 Bases for this surveillance indicates the testing frequency for these ,
valves is based on operating experience. The type of seal used is more susceptible to degradation in a shorter time period than other seal types. The purpose of this surveillance is to ensure that the seals are not deteriorating to a point where they would fail and compromise containment integrity, and that excessive containment purge valve leakage is properly accounted for in determining the overall containment leakage rate.
The proposed revision to T/S Surveillance Requirement 4.6.1.7.4 and its associated Bases to delete the requirement to verify quarterly that the individual measured leakage rate for each 18-inch containment mini-purge supply and exhaust isolation valve is less than 0.05 times the maximum allowable leakage rate is consistent with the guidance provided in NUREG-1431. The proposed revision does not involve an unreviewed safety question because operation of Callaway Plant with this change would not:
a) Increase the probability of occurrence or the consequences of an accident or malfunction of equipment important to safety previously evaluated in the Safety Analysis Report. The proposed revision to the T/S will not adversely impact plant safety since the requirement to perform the quarterly surveillance will still be implemented to verify valve leakage and seal degradation.
~ * ,
i j
l E4" " '
Attachment l1-
^
'i 5 s
+
Prgi 31off3 ,
q
, ULNRC- 03151 .; i q
? b) Create'the possibilityLfor anLaccident or malfunction of . . i equipment of aidifferent type.than any.previously evaluated- .i Lin'the-Safety; Analysis Report. :There are no-designichanges i being made'that would-create the possibility for an' accident r
- or malfunction _of equipment. -Deletion of the' individual l
- 1eakage rate forsthese valves'does not affect the. severity
- of- l any. accident previously evaluated. :The consequences of:a- l valve failure or malfunction ~are not' increased by removal;of :
- the. acceptance criteria, leakage raterwill'still-be measured; .j on a quarterly' basis-as is currently done tofdetermine"if the a seals are. degrading. !
l
. c) . Reduce,the' margin of safety as defined in the basis for.any_ !
' technical specification. The proposed revision to the T/S j does not reduce the margin of safety assumed in any accident i analysis. The valves will still be surveilled on a quarterly- 1 basis to verify leakage and seal degradation to assure gross j
, . failure will not occur and that containment integrity is !
maintained. !
I
' Conclusion !
\
Given the aboveIdiscussions as well as those presented in the l
-Significant Hazards Consideration, the proposed change does not !
adversely' affect or endanger the health or safety.of the general !
public or involve a significant safety hazard.- ;
1 j
i l
l I
o
, g, .- .- , = , . , , , -
.- . - - - ,- r
Att0chment 2 Pago 1 of 2 ULNRC-03151
]
SIGNIFICANT HAZARDS CONSIDERATION )
ProDosed Change .
This amendment request revises Technical Specification (T/S) ,
Surveillance Request 4.6.1.7.4 and its associated Bases to delete :
the requirement to verify quarterly that the measured leakage rate is less than 0.05 times the maximum allowable leakage rate (L,)
for each 18-inch containment mini-purge supply and exhaust isolation valve. This requirement would be replaced with a quarterly requirement to demonstrate operability by verifying that when the measured leakage rate for these valves is added to the leakage rates determined pursuant to Specification 4.6.1.2d for all other Type B and C penetrations, the combined leakage rate is less than 0.60 L, . The valves will still be inspected during this quarterly surveillance to assure the resilient seal material has not degraded.
The proposed revision to T/S Surveillance Requirement 4.6.1.7.4 l and its associated Bases to delete the requirement to verify quarterly that the individual measured leakage rate for each 18-inch containment mini-purge supply and exhaust isolation valve is less than 0.05 times the maximum allowable leakage rate is consistent with the guidance provided in NUREG-1431. The proposed revision does not involve a significant hazards consideration because operation of Callaway Plant with this change would not:
a) Involve a significant increase in the probability or consequences of an accident previously evaluated. The proposed revision to the T/S will not adversely impact plant safety since the requirement to perform the quarterly surveillance will still be implemented to verify valve leakage and seal degradation. The mini-purge valves will still perform their intended safety function to close within .
5 seconds after receipt of an isolation signal.
b) Create the possibility of a new or different kind of accident from any previously evaluated. There are no design changes being made that would create a new type of accident or malfunction and the method and manner of plant operation remain unchanged. Deletion of the individual leakage rate for these valves does not affect tre severity of any accident previously evaluated. The consequences of a valve failure or malfunction are not increased by the removal of the acceptance criteria, leakage rate will still be measured on a ,
quarterly basis as is currently done to determine if the seals are degrading.
c) Involve a significant reduction in a margin of safety. There are no changes being made to the safety limits or safety system settings that would adversely impact plant safety. ;
The valves will still be surveilled on a quarterly basis to verify leakage and seal degradation to assure gross failure will not occur and that containment integrity is maintained.
^
-Attachment 2 l N
i .
Paga 2 of-2 d '
ULNRC-03151 Based on.the~above' discussions, it has-been determined that-the. >
requested Technical Specification change does not involve a significant increase in the probability or consequences of an
_ accident.or create the possibility of a new or different kind of ;
accident or condition over previous evaluations; or involve a-
-significant reduction in a margin of safety. Therefore, the requested license amendment does not involve a significant hazards consideration.
t f
+
1 t
1 1
i
= _ . - . _
. Attachm:nt 3 Paga 1 of 1 ULNRC-03151 ENVIRONMENTAL CONSIDEkATION This amendment application revises the surveillance requirements of Technical Specification 4.6.1.7.4 and its associated Bases to delete the requirement to verify quarterly that the measured leakage' rate is less than 0.05 times the maximum allowable leakage rate for each 18-inch containment mini-purge supply and exhaust valve. This requirement would be replaced with a quarterly requirement to demonstrate operability by verifying that when the measured leakage rate for these valves is added to the leakage rates determined pursuant to Specification 4.6.1.2d for all other Type B and C penetrations, the combined leakage rate is less than 0.60 times the maximum allowable leakage rate.
The proposed amendment involves changes with respect to the use of facility components located within the restricted area, as defined in 10 CFR 20 and revises surveillance requirements. Union Electric has determined that the proposed amendment does not involve:
(1) A significant hazards consideration, as discussed in Attachment 2 of this amendment application; (2) A significant change in the types or significant increase in the amounts of any effluents that may be released offsite; (3) A significant increase in individual or cumulative occupational radiation exposure.
Accordingly, the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22 (c) (9) .
Pursuant to 10 - CFR 51.22 (b) , no environmental impact statement or environmental assessment need be prepared in connection with the issuance of this amendment.