U-604250, Notification of Readiness for NRC 95001 Inspection

From kanterella
(Redirected from U-604250)
Jump to navigation Jump to search
Notification of Readiness for NRC 95001 Inspection
ML15314A834
Person / Time
Site: Clinton 
Issue date: 11/06/2015
From: Stoner T
Exelon Generation Co
To:
Document Control Desk, NRC/RGN-III
References
U-604250
Download: ML15314A834 (1)


Text

Clinton Power Station" ClnoIL 61727

U-604250 November 6, 2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

Notification of Readiness for NRC 95001 Inspection

Reference:

Letter from C. Pederson (US NRC) to B. Hanson (EGC), "Final Significance Determination of a White Finding with Assessment Followup and Notice of Violation; NRC Inspection Report No. 05000461/201 5009; Clinton Power Station," dated August 11,2015 In the referenced letter, Exelon Generation Company, LLC (EGC) received the final significance determination of a White Finding and a Notice of Violation for Clinton Power Station, Unit 1.

The referenced letter stated that, as a result of the White Finding, the NRC planned to conduct a supplemental inspection using Inspection Procedure (IP) 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area." This letter also requested that the NRC be notified of EGC's readiness for this inspection.

The purpose of this letter is to inform the NRC that EGC is ready for the NRC to conduct the IP 95001 supplemental inspection. Based on discussions with the NRC staff, EGC requests the NRC commence this inspection prior to the end of the 4 th quarter of 2015.

There are no regulatory commitments contained in this submittal.

Should you have any questions concerning this letter, please contact Mr. Dale A. Shelton, Regulatory Assurance Manager, at (217) 937-2800.

Respectfully, Theodore R. Stoner Site Vice President Clinton Power Station J LP/bsz cc:

Regional Administrator, NRC Region Ill NRC Senior Resident Inspector, Clinton Power Station Region Ill Branch Chief - Clinton Power Station

Clinton Power Station" ClnoIL 61727

U-604250 November 6, 2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

Notification of Readiness for NRC 95001 Inspection

Reference:

Letter from C. Pederson (US NRC) to B. Hanson (EGC), "Final Significance Determination of a White Finding with Assessment Followup and Notice of Violation; NRC Inspection Report No. 05000461/201 5009; Clinton Power Station," dated August 11,2015 In the referenced letter, Exelon Generation Company, LLC (EGC) received the final significance determination of a White Finding and a Notice of Violation for Clinton Power Station, Unit 1.

The referenced letter stated that, as a result of the White Finding, the NRC planned to conduct a supplemental inspection using Inspection Procedure (IP) 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area." This letter also requested that the NRC be notified of EGC's readiness for this inspection.

The purpose of this letter is to inform the NRC that EGC is ready for the NRC to conduct the IP 95001 supplemental inspection. Based on discussions with the NRC staff, EGC requests the NRC commence this inspection prior to the end of the 4 th quarter of 2015.

There are no regulatory commitments contained in this submittal.

Should you have any questions concerning this letter, please contact Mr. Dale A. Shelton, Regulatory Assurance Manager, at (217) 937-2800.

Respectfully, Theodore R. Stoner Site Vice President Clinton Power Station J LP/bsz cc:

Regional Administrator, NRC Region Ill NRC Senior Resident Inspector, Clinton Power Station Region Ill Branch Chief - Clinton Power Station