U-603639, October 2003 Monthly Operating Report for Clinton, Unit 1

From kanterella
(Redirected from U-603639)
Jump to navigation Jump to search
October 2003 Monthly Operating Report for Clinton, Unit 1
ML033230354
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/12/2003
From: Iliff W
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
U-603639
Download: ML033230354 (5)


Text

z AmerGen An Exelon/British Energy Company Clinton Power Station R.R. 3 Box 228 Clinton, IL 61727-9351 1 OCFR50.36 U-603639 November 12, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

October 2003 Monthly Operating Report Please find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending October 31, 2003.

Respectfully, W. S. Iiff Regulatory Assurance Manager Clinton Power Station MKB/bIf Attachments cc:

Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - Clinton Power Station Office of Nuclear Facility Safety - Illinois Department of Nuclear Safety Jq

')  1:

5,

7 ATTACHMENT 1 CHALLENGES TO MAIN STEAM SAFETY/RELIEF VALVES Month October 2003 None

ATTACHMENT 2 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-461 UNIT Clinton 1 DATE 10/31/03 COMPLETED BY M. K. Baetz TELEPHONE (217) 937-2201 MONTH October 2003 1

1017 17 1023 2

1017 18 1023 3

1017 19 1023 4

1018 20 1023 5

1017 21 1023 6

1017 22 1023 7

1018 23 1022 8

1017 24 1020 9

1017 25 1020 10 1020 26 1061 11 1022 27 1019 12 1024 28 624 13 1024 29 487 14 1022 30 487 15 1025 31 708 16 1024

ATTACHMENT 3 OPERATING DATA REPORT DOCKET NO.

50-461 UNIT DATE Clinton 1 10/31/03 COMPLETED BY TELEPHONE M. K. Baetz (217)937-2201 OPERATING STATUS

1.

REPORTING PERIOD:

October2003 GROSS HOURS IN REPORT PERIOD: 745

2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt):

3473 MAX. DEPEND. CAPACITY (MDC) (MWe-Net):

1022 DESIGN ELECTRICAL RATING (MWe-Gross):

1062

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):

None

4.

REASONS FOR RESTRICTION (IF ANY):

N/A

5.

NUMBER OF HOURS REACTOR WAS CRITICAL

6.

REACTOR RESERVE SHUTDOWN HOURS

7.

HOURS GENERATOR ON LINE

8.

UNIT RESERVE SHUTDOWN HOURS

9.

GROSS THERMAL ENERGY GENERATED (MWH)

10.

GROSS ELECTRICAL ENERGY GENERATED (MWH)

11.

NET ELECTRICAL ENERGY GENERATED (MWH)

12.

REACTOR SERVICE FACTOR

13.

REACTOR AVAILABILITY FACTOR

14.

UNIT SERVICE FACTOR

15.

UNIT AVAILABILITY FACTOR

16.

UNIT CAPACITY FACTOR (Using MDC)

17.

UNIT CAPACITY FACTOR (Using Design MWe)

18.

UNIT FORCED OUTAGE RATE THIS MONTH 745.0 0.0 745.0 0.0 2.232.110 746222.0 717.634 100.0%

1 00.0%

100.0%

1 00. 0 103.6%

94.7%

0.0%

YR TO DATE 7252.0 0.0 7239.4 0.0 22.750.889 7.662.820.5 7.3767.94.0 99.4%

99.4%

99.2%

99.1%

108.7%

99.4%

0.0/0 CUMULATIVE 95.988.8 0.0 93.828.9 4.0 262.380.634.6 87.084.534 83.201.691 68.7%

68.7%

67.2%

67.2%

64.0%

58.6%

6.3%

19.

SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):

TYPE DATE DURATION Refuel (Cl R09) 02/03/04 18 Days

20.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A

ATTACHMENT 4 UNIT SHUTDOWNS DOCKET NO.

UNIT 50-461 Clinton 1 DATE COMPLETED BY 10/31/03 M. K. Baetz REPORT MONTH October 2003 TYPE FORCED NO.

DATE F:

SCHEDULED METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER DURATION (HOURS)

CORRECTIVE ACTIONS/COMMENTS REASON (1)

(2)

NONE (1)

Reason A - Equipment Failure (explain), B - Maintenance or Test, C - Refueling, D - Regulatory Restriction E - Operator training & License Examination, F - Administrative, G - Operational Error (explain)

(2)

Method 1 - Manual, 2 - Manual Scram, 3 - Automatic Scram, 4 - Other (explain)