lihnois Power Company Chnton Power Station P.O. Box 678 Chnton, IL 61727 n.uness "a";**'
PGWER 1A 120 February 7, 1997 Docket No. 50-461 10CFR26.71 Dm~nt Control Desk Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Semi-Annual Fitness For Duty Report
Dear Madam or Sir:
Attached is the Illinois Power Company (IP) Clinton Power Station Semi-Annual Fitness For Duty Report for the period ending December 31,1996. This information is being submitted in accordance with 10CFR26.71.
J Sincerely yours, Paul J. Telthorst Director-Licensing RSF/krk Attachments 1
cc:
NRC Clinton Licensing Project Manager NRC Resident Office, V-690 Regional Administrator, Region III, USNRC Illinois Department of Nuclear Safety I
9702200358 970207 3
[/
I gDR ADOCK 0500 1
200059
x Fitzess f:r Duty Program r
Performance Data Personnel Subject to 10CFR26
\\
l lilinois Power Company December 31,1996 cr m
m.a.d Clinton Power Station 1-.u.
Gary S. Kephart, Supervisor-Personnel Processing (217) 935-8881 X3888 Caeemet Name Pheme (includsag ares code)
Cutoffs: Screen /Confumation (ng/ml) lXl Appendix A to 10CFR26 Marijuana
/
Amphetamines
/
/
Cocaine
/
Phencyclidine
/
/
Opiates
/
Alcohol (% BAC)
/
j Long-Term Short-Term Testing Results Licensee Employees Contractor Pers>nnel Contractor Personnel Average Number with Unescorted Access 887 78 529 Categories Tested Positive Tested Positive Tested Positive Pre-Access 28 0
27 1
808 11 For Post Accident 0
0 0
0 0
0 Cause Observed Behavior 0
0 0
0 3
2 Random 213 0
25 0
151 3
Follow-up 7
0 0
0 10 0
Other 23 0
1 0
108 2
Total 271 0
53 1
1080 18
..._._.m..__.-
_. ~....
V
- l S---f
- ' Form 3 i
July-December 1996 s
Page1of1 ILLINOIS POWER COMPANY CLINTON POWER STATION l
PERFORMANCE DATA
- L Clinton Power Station incurred no repostable fitness for duty events during the July-December 1996 reportmg Period.
c
)
i MANAGEMENTACTIONS g
The effectiveness of the FFD Program was evaluated in August 1996 through the review of documentation, observanon of activities and pg al interviews by our Nuclear Accessment department. The results of the audit indicated i
that the FFD Program is effectively implemented to meet the requirements of 10CFR26;" Fitness For Duty Programs".
There were no audit findags issued during this audit.
1 A problem was identified regarding urine specimen botties in September 1996. An investigation was completed
[
when a blind quality control sample spiked with marijuiana tested below the 100 ng/ml cutofflevel at our on-site laboratory.
i The low marijuana level was verified by the off-site laboratory. With assistance of off-site laboratory personnel and the on-i site Fitness for Duty Laboratory Administrator an on-site testmg experunent revealed the cap sealing the specimen bottle
[
used by the vendor to ship the blind quality control samples contained a rubber gasket which was absorbing the THC from the specimen resulting in a lower detection level at testag. Our vendor discontmued using the bottles in question and f
we have incurred no further problems.
t Clinton Power Station tests all site employees with and without unescorted access privileges. The numbers given
-[
reflect the number of all those individuals in the random selection program j
Numbers given reflect testag of those individuals placed on a monitormg program per the Medical Review Officer's (MRO) ihomu,Jgicii due to background information and personal interviews by the MRO. 'Ihese are unannounced tests, and the individuals are escorted fmm theirjobs to the collection site for testag. Also included in these l
numbers are those tests which are repeated because oflow specific gravity or low creatmine on the initial urine test.