Monthly Operating Rept for Dec 1986
ML20212P833
Person / Time
Site: Clinton 
Issue date: 12/31/1986
From: Spangenberg F
ILLINOIS POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
U-600810, NUDOCS 8703160287
Download: ML20212P833 (5)


Text

-e

.... ~. -...._,

~f M

CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month December 1986 (None to be reported this month) s s

, f

?

t.,

f

,7

1 l'

}

r s

(

,I s

4

'T i

l

},

9 f

o 1,

~.

au 9

N

  1. f I

s f

o

~-,

m MONTHLY OPERATING REPORT FORMAT AND INSTRUCTIONS AVERAGE DAILY UNIT POWER LEVEL g

DOCKET NO.

50-461 UNIT Clinton 1 DATE 12/31/86' COMPLETED BY F. A. Spangenberg v w.

TELEPHONE (217).935-8881 X3400-0 MONTH' December, 1986 O

DAY AVER "E DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL VRe-Net)

(MWe-Net)

'l 0

)

17 0

l

-2 0

18 0

9 3

0 19 0

4 0

20 0

5 0

Lt 21 e

0

- 6s, 0

i 22 0

7 0

[

23 0

i 8

0 L

.24 0

0 f

9 0

25 e

1.

26 0

10 0

s 3

27 0

11 0

C 12 0

28 0

.13 0

29 0

14 0

30 0

15 0

31 0

16 0

INSTRUCTIONS

-On this form, list the average daily unit power level in MWe-Net for each day i

in the reporting month. Compute to the nearest whole megawatt.

[

These figures will be used to plot a graph for each reporting month. Note j

that when maximum dependable capacity is used for the net electrical rating of l

the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

a

~... - -... -

4Y;g

~

-OPERATING DATA. REPORT i+1

+-

l DOCKET NO.-

50-461 UNIT Clinton 1 DATE 12/31/86 COMPLETED BY F. A. Spangenberg TELEPHONE (217) 935-8881-X3400

[)1g OPERATING STATUS' w

11.

REPORTING PERIOD:-December, 1986 GROSS' HOURS IN REPORTING ^ PERIOD:

744 2.

CURRENU.Y AUTHORTZED POWER LEVEL (MWt): 144.7 MAX. DEPEND. CAPACITY (MWe-Net): Not'Available DESIGN ELECTRICAL RATING (MWe-Net): 933 3.

. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 46.6 4.

REASONS'FOR RESTRICTION (IF ANY): Clinton-1 is in the start-up testing phase and is limited to 5% of rated power.

. e.

THIS MO 'IH YR TO DATE CUMULATIVE 5.

NUMBER OF' HOURS REACTOR WAS CRITICAL...

0 0

0 6.

REACTOR RESERVE SHUTDOWN HOURS.........

0 0

0 s 7.

_ HOURS GENERATOR ON LINE.................

0 0

0 8.

UNIT RESERVE SHUTDOWN HOURS............

0 0

0 9.

GROSS THERMAL ENERGY GENERATED (MWH)...

0 0

0 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0

0 i

-11.

NET ELECTRICAL ENERGY GENERATED (MWH)..

0 0

0 12.

REACTOR SERVICE FACTOR.................

N/A 13.

REACTOR AVAILABILITY. FACTOR............

N/A 14.

UNIT SERVICE FACT 0R....................

N/A

. 1.. UNIT-AVAILABILITY FACTOR...............

N/A 5

16.

UNIT CAPACITY FACTOR (Using MDC).......

N/A

- 17. UNIT CAPACITY FACTOR (Using Design MWe)

N/A 18.

UNIT FORCED OUTAGE RATE................

N/A

19.. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): Maintenance shutdown, March 31, 1987, 13 days.

20.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 1/25/87 21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED j.

INITIAL CRITICALITY 1/25/87 INITIAL ELECTRICITY (Synchronization) 2/20/87 I

COMMERCIAL OPERATION (Warranty Run) 8/21/87

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-461 1

UNIT-Clinton 1 DATE 12/31/86 COMPLETED BY F. A. Spangenberg TELEPHONE- (217) 935-8881 X3400~

REPORT. MONTH December, 1986 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.

DATE S: SCHEDULED (HOURS)

REASON (1)

REDUCING POWER (2)

CORRECTIVE-ACTIONS / COMMENTS N/A N/A N/A N/A N/A N/A

.(1) REASON A: EQUIPMENT FAILURE (EXPLAIN)

B: MAINT. OR TEST C: REFUELING r

D: REGULATORY RESTRICTION I

E: OPERATOR TRAINING'AND 1

LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN) i (2). METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM 4: OTHER (EXPLAIN)

THERE HAVE BEEN NO SHUTDOWNS DURING THIS REPORT PERIOD.

f

SUMMARY

i

U-600810 L30-87 ( 01-13)-L 1A.120 ILLIN0/S POWER 00MPANY CLINTON POWER STATION, P.O. BOX 678, CLINTON, ILLINOl$ 61727 January 13, 1987 Docket No. 50-461 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Clinton Power Station, Unit 1 December 1986 Monthly Operating Report NPF-55

Dear Sir:

Please find enclosed the monthly operating report for Clinton Power Station, Unit 1, for the period ending December 31, 1986, incer

yours, c.AC F. A. Spang serg Manager - L ensing and Safety TLR/cke Enclosure cc: Regional Administrator, Region III, USNRC S5 I