Text

-e - - . . . . . . ~ . - . .. ._,

~f

. M CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month December 1986 (None to be reported this month) s s , f

?

t. ,

,7 f

1 ,

' l'

}

r s (

,I '

s ' ,

'T 4 i

l

}, 9 1, o f

~. ,

au 9

N #f I

s f

o

~-,

m MONTHLY OPERATING REPORT FORMAT AND INSTRUCTIONS AVERAGE DAILY UNIT POWER LEVEL g DOCKET NO. 50-461 UNIT Clinton 1 ,

DATE 12/31/86' COMPLETED BY F. A. Spangenberg v w.

TELEPHONE (217).935-8881 X3400-0 MONTH' December, 1986 O DAY AVER "E DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL VRe-Net) (MWe-Net)

'l 0 ) 17 0 l

-2 0 18 0 9

3 0 19 0 4 0 20 0 5 0 Lt 21 e 0

- 6s, 0 i 22 0 7 0 [ 23 0 i 8 0 L

.24 0 0 25 e 0 f 9 10 0 ,

s 1. 26 0 3

11 0 C '-

27 0 12 0 28 0

.13 0 29 0

!. 14 0 30 0 ,

15 0 31 0 16 0 INSTRUCTIONS i

-On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

[ These figures will be used to plot a graph for each reporting month. Note j that when maximum dependable capacity is used for the net electrical rating of l

the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

a___

., , ~ . . . - - . . . - .. . .

4Y;g

~

i+1 -OPERATING DATA. REPORT

+-

l DOCKET NO.- 50-461 UNIT Clinton 1 DATE 12/31/86 COMPLETED BY F. A. Spangenberg

. TELEPHONE (217) 935-8881- X3400

[)1g OPERATING STATUS' w

11. REPORTING PERIOD:-December, 1986 GROSS' HOURS IN REPORTING ^ PERIOD: 744 ,
2. CURRENU.Y AUTHORTZED POWER LEVEL (MWt): 144.7 MAX. DEPEND. CAPACITY (MWe-Net): Not'Available DESIGN ELECTRICAL RATING (MWe-Net): 933
3. . POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 46.6
4. REASONS'FOR RESTRICTION (IF ANY): Clinton-1 is in the start-up testing phase and is limited to 5% of rated power.

. e.

THIS MO 'IH YR TO DATE CUMULATIVE

5. NUMBER OF' HOURS REACTOR WAS CRITICAL... 0 0 0
6. REACTOR RESERVE SHUTDOWN HOURS......... 0 0 0 s 7. _ HOURS GENERATOR ON LINE................. 0 0 0
8. UNIT RESERVE SHUTDOWN HOURS............ 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH)... 0 0 0
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 0 i

-11. NET ELECTRICAL ENERGY GENERATED (MWH).. 0 0 0

12. REACTOR SERVICE FACTOR................. N/A
13. REACTOR AVAILABILITY. FACTOR............ N/A
14. UNIT SERVICE FACT 0R.................... N/A

. 1.5 . UNIT-AVAILABILITY FACTOR............... N/A

16. UNIT CAPACITY FACTOR (Using MDC)....... ,

N/A

- 17 . UNIT CAPACITY FACTOR (Using Design MWe) N/A

18. UNIT FORCED OUTAGE RATE................ N/A
19. . SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): Maintenance shutdown, March 31, 1987, 13 days.
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 1/25/87
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED j.

INITIAL CRITICALITY 1/25/87 INITIAL ELECTRICITY (Synchronization) 2/20/87 I COMMERCIAL OPERATION (Warranty Run) 8/21/87

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-461 1

UNIT- Clinton 1 DATE 12/31/86 COMPLETED BY F. A. Spangenberg TELEPHONE- (217) 935-8881 X3400~

REPORT. MONTH December, 1986 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) CORRECTIVE-ACTIONS / COMMENTS NO. DATE N/A N/A N/A N/A N/A N/A .(1) REASON A: EQUIPMENT FAILURE (EXPLAIN)

B: MAINT. OR TEST C: REFUELING D: REGULATORY RESTRICTION I

E: OPERATOR TRAINING'AND 1

' LICENSE EXAMINATION F: ADMINISTRATIVE

' G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN) i

! (2). METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM 4: OTHER (EXPLAIN)

THERE HAVE BEEN NO SHUTDOWNS DURING THIS REPORT PERIOD.

SUMMARY

f i

" U-600810 L30-87 ( 01-13)-L 1A.120 ILLIN0/S POWER 00MPANY CLINTON POWER STATION, P.O. BOX 678, CLINTON, ILLINOl$ 61727 January 13, 1987 Docket No. 50-461 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Clinton Power Station, Unit 1 December 1986 Monthly Operating Report NPF-55

Dear Sir:

Please find enclosed the monthly operating report for Clinton Power Station, Unit 1, for the period ending December 31, 1986, incer yours, c.AC .

F. A. Spang serg ,

Manager - L ensing and Safety TLR/cke Enclosure cc: Regional Administrator, Region III, USNRC S5 ,