TXX-8869, Requests Approval of Encl Final Draft, Process Control Program
| ML20155E919 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/07/1988 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20155E922 | List: |
| References | |
| TXX-88695, NUDOCS 8810130060 | |
| Download: ML20155E919 (1) | |
Text
'.
N==
log a TXX-88695
~
File # 10010
?
911.4 1UELECTRIC wn.m c. counm October 1, 1988 benatm Vka hrss.irnst U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) 00CKET NOS. 50-445 AND 50-446 PROCESS CONTROL PR0((AM (PCP)
Gentlemen:
Enclosed is the proposed final draft of the CPSES Process Control Program (PCP).
This final draf t supersedes all other prior submittals of the proposed PCP.
NRC Staff approval for the CPSES PCP is requested.
Very truly yours,
!//
,h1/7k n '
W. G. Counsil RDD/mlh c - Mr. R. D. Martin, Region IV Resident inspectors CPSES (3)
Mr. J. H. Wilson, OSP - NRC l
a 0
t S810130060 881007 i
n PER ADOCK G5000445 FDC n
O) North WM Street LB Al lkil.u. Tetas 13NI l