TXX-7032, Supplemental Deficiency Rept CP-87-23 Re Class 1E Conduit Unions.Initially Reported on 870626.Final Rept Rescheduled for 880219 Due to Time Constraints
| ML20236W812 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/02/1987 |
| From: | Counsil W, John Marshall TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-87-23, TXX-7032, NUDOCS 8712080245 | |
| Download: ML20236W812 (1) | |
Text
_-
l e
J main amme.
F9 Log # TXX-?032
_~_
Fi'le # 10110
___r
=
903.9 7t/ ELECTRIC Ref. # 10CFR50.55(e)
William G. Counsil cm,,,,, ur cena.,,,
December 2, 1987 U. S. Nuclear Regulatory Commission Attn: Document Control Oesk Washington, D. C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) l DOCKET N05. 50-445 AND 50-446 i
CONDUIT UNIONS l
SDAR: CP-87-23 (SUPPLEMENTAL REPORT)
Gentlemen:
On June 26, 1987, we verbally notified your Mr. R. F. Warnick of a deficiency involving Class IE conduit installation runs coupled with unions which were not securely tightened which we deemed reportable under the provisions of 10CFR50.55(e).
This is a supplemental report to reschedule projected l
completion d6tes for identifying and correcting any loose conduit unions.
Our last (Final) report, logged.TXX-6565, was submitted on July 27, 1987.
l The completion date for identifying and correcting any loose conduit unions for both Units 1 and 2 was scheduled for December 1, 1987.
However, due to time constraints these activities have been rescheduled for completion by l
February 3, 1988.
As a result of this reschedule of activities the records supporting our evaluation will be available for your inspector's review at the CPSES site af ter February 19, 1988.
Very truly yours, It].ds.Ocanca' l
l W. G. Counsil 1
k'
?-
By:
J'. S. Marshall Supervisor, Generic Licensing l
DAR/grr c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 8712080245 871202 8 6 DR ADOCN 0500 5