TXX-7015, Updates 871002 Response to Violations Noted in Insp Rept 50-445/87-11 & 50-446/87-09.Completion Date for Removal of Unauthorized Splices & Wire Nuts Changed from 871130 to 880129
| ML20236V657 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/30/1987 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| TXX-7015, NUDOCS 8712040448 | |
| Download: ML20236V657 (1) | |
Text
-_-_
3 y
muuss
'M ='
' Log # TXX-7015 File'# 10130
?
E 1R 87-11 1R 87 09 i
N# ELECTRIC
]
Ref. # 10CFR2.201 Winiam G. Counsu u,,w&, vm. sw,a, November-30, 1987 U. S. Nuclear Regulatory Commission
)
Attn: Document Control Desk
.}
Washington, D.
C..
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
[
DOCKET NOS. 50-445 AND 50-446 i
INSPECTION REPORT NOS. 50-445/87-11.AND 50-446/87-09 REVISED DATE OF FULL COMPLIANCE FOR 3
NOTICE OF VIOLATION (N9V), ITEM A' I
(445/8711-V-02; 446/8709-V-02)
)
REF: TV Electric Letter TXX-6777 from W. G. Counsil to NRC dated October 2, 1987 Gentlemen:
The referenced letter provided our response to Notice of Violation (NOV) Item 1
A (445/8711-V-02; 446/8709-V-02).
In that response we stated that the removal of unauthorized splices and wire nuts per NCRs CE-87-9610 and CE-87-10026 would be completed by November 30, 1987. Completion of this work has taken longer than expected. Accordingly, our date for completion of this work is hereby revised to be no later than January 29, 1988.
Very truly yours, ff W. G. Counsil 1