TXX-6944, Supplemental Deficiency Rept CP-87-03 Re Installation of safety-related 6.9 Kv Switchgear on Structural Embedments Which Were Not Level.Initially Reported on 870316.Testing of Switchgear Rescheduled for Completion by 880301
| ML20236S053 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/20/1987 |
| From: | Counsil W, John Marshall TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-87-03, CP-87-3, TXX-6944, NUDOCS 8711240187 | |
| Download: ML20236S053 (1) | |
Text
_ _ _ _ _ _ _ _. -
M
=M
. Log f.TXX-6944 1
5
,Fi1e.#'10110
=
=:
908.3-Ref 1 10UR50;55(e)-
WELECTRIC -
wmiam c. counsu November 20, 1987 l
Executive Vwe President V. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION'(CPSES)
DOCKET NOS. 50-445 AND 50-446 i
6.9 KV SWITCHGEAR INSTALLATION SDAR:
CP-87-03 (SUPPLEMENTAL REPORT) 1 i
Gentlemen:
1 1
On March 16, 1987, we notified you by our letter logged TXX-6334 of.a reportable deficiency involving the installation of the safety-related 6.9 kV-Switchgear on structural embedments which were not level.
This is a i
supplemental report submitted _to status corrective actions implemented to q
date.
The reinstallation, jackshaft replacement and testing for the safety-related 6.9 kV Switchgear has been rescheduled for complet. ion by March 1, 1988.
Supporting documentation will be available for your inspectors to review at-the CPSES Project site after April 29, 1988.
Very truly yours, (4A. Csay sd W.'6. Counsil tk By':
J. S. Marshall
. Supervisor, i
Generic Licensing.
WJH/mgt c - Mr. R. D. Martin, Region IV
)
Resident Inspectors, CPSES (3) j
)
1 j
8711240187 871120 I
I PDR ADOCK 05000445
~
6 S
/'
]
/
a 400 North Olive Street LB 81 IMas. Texas 7$201