TXX-6922, Supplemental Deficiency Rept CP-82-09 Re Solid State Protection Sys Undetectable Failure.Initially Reported on 821130.Test Procedures Revised to Incorporate facility-specific Requirements Recommended by Westinghouse

From kanterella
(Redirected from TXX-6922)
Jump to navigation Jump to search
Supplemental Deficiency Rept CP-82-09 Re Solid State Protection Sys Undetectable Failure.Initially Reported on 821130.Test Procedures Revised to Incorporate facility-specific Requirements Recommended by Westinghouse
ML20236N620
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/10/1987
From: Counsil W, John Marshall
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-82-09, CP-82-9, TXX-6922, NUDOCS 8711160253
Download: ML20236N620 (2)


Text

@E. Mb 1:

=

=

~

7 me.im,,.. p 1

8s y fc pd@

h DJ,e y

y r

3, n.

j h $g g -

,d g

o-J M, pq M

,{

1 2'

h E:9-Log 4 TXX-692*

1 g

W g

. f,

Fi1e # 10110

'r C

f

-907.2 -

+(a.

7EFELECTRIC:

.Ref..#10CFR50.S5(e)i i..m, 3

s 5

  • tovember 10, 1987_

N wmiam c. couma unkwvatwan 1

1 L'

U. S. Nuclear Reguiatory Commission i

Atta: Document Control Desk I

.l 4,,

Washingt0n,: D. C.

20555 J

s

SUBJECT:

CONANCHE' PEAK STEAM ELECTRIC STATION (CPSES) i DOCKET NOS. 50-445'AND,50-446 SOLID' STATE'0ETECTION S'rSTEM UNDETECTABLE FAILURE I

SDAR: CP-82-09 (SUPPLEMENTAL REPORT) i Gen tlemen:

On November 30, 1982, in our report logged TXX-3595, we notified you'of a

' deficiency involving Solid State Protection System (SSPS). undetectable fallure twhich'we. deemed reportable under the provisions of 10CFR50.55(e).

This issue.

l was' subsequent 1y' identified by our report logged TXX-6435, dated May 13, 19873 as an item for which a final report had been issued but, the corrective

, actions. required revislon.

This report is submitted to status the implementation'of.those. corrective actions.

In'.our. report TXX-3595, we indicated our corrective actions would involve a a

revision to our test procedures to' incorporate the CPSES specific testing

~!

. requirements recommended by Westinghouse.

Since that report, Westinghouse has

. submitted : instructions to modify the 'SSPS master relay. test panel.to provide j

positive' detection of're-establishment'of the slave relay coil circuits after j

testing.

These instructions were transmitted via field Chenge Notices TBXM-1 10605A and TCXM-10578 and were implemented via Design Change Authorizations 18348 (Unit'1) and 19853 (Unit 2). Rework for Unit 1 and Unit 2 was completed on August 16, 1983, and June 26, 1987 respectively.

1

..Due.to the implementation of these hardware modifications, revision of our test procedures as described in TXX-3595 is no longer required, l

1 i

9711160253 871110 PDR ADOCK 05000445 S

PDR 9

l

?-

t OJ

.wo North Olive Street Lil XI Dallas. Texas 75201

w ;.

o

'C Txx-6922 November 10, 198)

Page 2 of 2 This concludes our evaluation and corrective action.for this issue.

Suoporting documentation is available for your inspectors to review at the CPSES site.

Very_truly.yours, I h. (.ou. n sc.Y W. G. Counsil

.. [

I

'i-gyb,J.S. Marshall Supervisor, Generic Licensing

-l CBC/gj

-c

.Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) i i

l 1

i

_-