E E==i Log # TXX-6580
--- 9 File # 10130 IR 86-03/02 r
r IR 86-07/05 1UELECTRIC William G. Counsil Extrutive %ct President V. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 UPDATE TO RESPONSES TO NRC NOTICES OF DEVIATIONS (N00)
INSPECTION REPORTS NOS.:
50-445/86-05 AND 50-446/86-02 50-445/86-07 AND 50-446/86-05
REFERENCE:
TXX-6489 dated June 1, 1987 from W. G. Counsil to NRC Gentlemen:
l In our referenced letter, TV Electric provided updated responses to N0D l
l 445/8603-D-13 (Item E.3.c) and N0D 445/8607-D-10 (Item I.2).
Our updated responses stated that NCR-25340N (which has been converted to NCR CM-87-5721-j N) would be closed no later than July 15, 1987. As a result of a conflict with other work in the same location, the field activities required for closure of this NCR could not be completed by July 15, 1987. Accordingly, the date for closure of NCR CM-87-5721-N is hereby revised to September 30, 1987.
l Very truly yours, l
W I
W. G.
ounsi By:
i G. S. Keeley Manager, Nucle sing RSB/mlh c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) h p