TXX-6359, Interim Deficiency Rept CP-86-72 Re Scope of Plant Mods Resulting from Pipe Support Reverification Program.Initially Reported on 860609.Engineering Evaluation Has Not Identified Addl Reportable Instances.Next Rept Expected by 870612

From kanterella
(Redirected from TXX-6359)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-72 Re Scope of Plant Mods Resulting from Pipe Support Reverification Program.Initially Reported on 860609.Engineering Evaluation Has Not Identified Addl Reportable Instances.Next Rept Expected by 870612
ML20205K597
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/27/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CP-86-72, TXX-6359, NUDOCS 8704010622
Download: ML20205K597 (3)


Text

w

\\

Log # TXX-6359

_==

File # 10110 r7 903.9 C

Ref. # 10CFR50.55(e)

.r r

lilELECTRIC March 27, 1987 wini. c.coomii Emtotive ik e l' resident U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKETS NOS. 50-445 AND 50-446 SMALL BORE PIPING AND SUPPORTS SDAR: CP-86-72 (INTERIM REPORT)

Gentlemen:

On June 9,1986, we verbally notified you of a reportable item involving the scope of plant modifications resulting from the project's pipe support reverification program (see TXX-4844). This is a follow-up interim report on a reportable item under provisions of 10CFR50.55(e). Our latest interim report logged TXX-6297 was submitted on February 20, 1987.

The continuing engineering evaluation has not identified any additional instances which are considered reportable pursuant to 10CFR50.55(e). The attached list shows the support modifications issued to date.

The evaluation is continuing and we anticipate submitting our next report by June 12, 1987.

Very truly yours, (7f W. G. Counsil BSD/amb Attachment c - Mr. E. H. Johnson, Region IV Mr. D. L. Kelley, RI - Region IV Mr. H. S. Phillips, RI - Region IV gf gnain!!! E8Bjk g

i 1 400 North Olive Street 1 II. M i Dallas, leus 75201

TXX-6359 March 27, 1987 Attachment Page 1 of 1 ATTACHMENT SMALL BORE PIPE SUPPORT MODIFICATIONS Number of Unit Cateaory Modifications

  • 1 Prudent 23 Recent Industry Practice 87 Adjustment 185 Cumulative Effects 136 2

Prudent 2

Recent Industry Practice 17 Adjustment 46 Cumulative Effects 20

  • Changes in these figures from the last report represent not only identification of further modifications but a recategorization of certain supports.

Outgoing Correspondence bec (3):

M. D. Spence

  • INP0
  • K. L. Scheppele A

W. G. Counsil R. T. Jenkins H. C. Schmidt J. W. Beck R. A. Jones A. B. Scott R. P. Baker S. D. Karpyak B. C. Scott

  • R. E. Ballard G. S. Keeley/

C. E. Scott E. Brabazon J. S. Marshall

  • L. K. Sterchi J. L. Barker
  • R. P. Klause P. B. Stevens
  • W. R. Burchette J. E. Krechting J. F. Streeter
  • J. H. Butts J. C. Kuykendall
  • 8. Tartt R. D. Calder
  • D. F. Landers
  • J. L. Vota F. Camp
  • R. P. Lessey
  • E. L. Wagoner R. E. Camp
0. W. Lowe H. M. Warren (2)
  • R. L. Cloud D. M. McAfee/
  • N. H. Williams J. R. Coombe P. E. Halstead kD.R.Woodlan D. E. Deviney
  • R. E. McCaskill R. A. Wooldridge
  • L. Dietrich
  • J. P. McGaughy
  • T. G. Dignan D. D. Mosley
  • J. Ellis
  • A. Muzzin W. D. Fenoglio L. D. Nace
  • 8. Finkelstein PIMS J. C. Finneran L. E. Powell
  • J. Garibaldi R. L. Ramsey J. B. George J. D. Redding R. L. Grubb D. M. Reynerson H. A. Harrison
  • N. S. Reynolds J. C. Hicks March 2, 1987
  • - First Class Mail

-aua=>.--

.au%