TXX-6297, Interim Deficiency Rept CP-86-72 Re Reverification of Small Bore Piping & Supports.Initially Reported on 860609. Continuing Engineering Evaluation Found No Addl Reportable Instances.Next Rept Will Be Submitted by 870410

From kanterella
(Redirected from TXX-6297)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-72 Re Reverification of Small Bore Piping & Supports.Initially Reported on 860609. Continuing Engineering Evaluation Found No Addl Reportable Instances.Next Rept Will Be Submitted by 870410
ML20211H463
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/20/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CP-86-72, TXX-6297, NUDOCS 8702260184
Download: ML20211H463 (2)


Text

Log # TXX-6297

-lll=llll:' =

File # 10110 F """"

903.9 8

6 Ref. # 10CFR50.55(e) 1UELECTRIC February 20, 1987 w nu-c. coow Ltrentne iice President U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKETS NOS. 50-445 AND 50-446 SMALL BORE PIPING AND SUPPORTS SDAR:

CP-86-72 (INTERIM REPORT)

Gentlemen:

On June 9,1986, we verbally notified you of a reportable item involving the scope of plant modifications resulting from the project's pipe support reverification program (see TXX-4844).

This is a follow-up interim report on a reportable item under provisions of 10CFR50.55(e). Our latest interim report logged TXX-6207 was submitted on January 9, 1987.

The continuing engineering evaluation has not identified any additional instances which are considered reportable pursuant to 10CFR50.55(e).

The attached list shows the support modifications issued to date. The evaluation is continuing and we anticipate submitting our next report by April 10, 1987.

Very truly yours, f

&NX W. G. Counsil BSD/amb Attachment c - Mr. E. H. Johnson, Region IV Mr. D. L. Kelley, RI - Region IV Mr. H. S. Phillips, RI - Region IV 8702260184 870220 PDR ADOCK 05000445 g

PDR JIN) %rth Olhe Street I..it XI Dallas, Teus 75201 sfl

TXX-6297 0

February 20, 1987 Attachment Page 1 of 1 ATTACHMENT SMALL BORE PIPE SUPPORT MODIFICATIONS Number of Unit

.Cateaory Modifications

  • 1 Prudent 20 Recent Industry Practice 85 Adjustment 174 Cumulative Effects 124 2

Prudent 3

Recent Industry Practice 17 Adjustment 48 Cumulative Effects 18 Changes in these figures from the last report represent not only identification of further modifications but a reclassification and/or recategorization of certain supports.

Reductions in these figures from the previous report are due in part to tracking changes in the program.