TXX-6181, Interim Deficincy Rept CP-86-60 Re Gaps Between Polar Crane Girder & Girder Support Brackets.Initially Reported on 860904.Preliminary Review Results Indicate Condition Not Reportable Under 10CFR50.55(e).Final Rept by 870215

From kanterella
(Redirected from TXX-6181)
Jump to navigation Jump to search
Interim Deficincy Rept CP-86-60 Re Gaps Between Polar Crane Girder & Girder Support Brackets.Initially Reported on 860904.Preliminary Review Results Indicate Condition Not Reportable Under 10CFR50.55(e).Final Rept by 870215
ML20212D083
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/18/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-60, TXX-6181, NUDOCS 8612310276
Download: ML20212D083 (1)


Text

Log # TXX-6181 File # 10110 903.8 TEXAS UTILITIES GENERATING COMPANY SEYWAY TOWEE. 400 NORTH OLIVE STREET. IJ. St - DALLAS, TEXAB 783D1 December 18, 1986 WILLIAM G. COUN51L trcufws wcs Passiosm?

Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects DEC i 9 E U. S. Nuclear Regulatory Commission y

611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 POLAR CRANE GIRDER AND GIRDER SUPPORT SHIM GAPS SDAR: CP-86-60 (INTERIM REPORT)

Dear Mr. Johnson:

On September 4,1986 we verbally notified your Mr. I. Barnes of a deficiency involving gaps between the polar crane girder and the girder support brackets.

This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our latest interim report was logged TXX-6009 dated October 3, 1986. On December 17, 1986, we verbally received an extension for submitting this response to December 19, 1986.

Preliminary review results indicate this issue is not reportable.

Calculations supporting our position are currently undergoing final review.

These efforts are scheduled to be completed by January 28, 1987.

We anticipate submitting our final report no later than February 15, 1987.

Very truly yours, I

W. G. Counsil By:

lf

/dM

/

G. S. Keeley Manager, Nuclear ensing RWH/mlh c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555