TXX-6168, Interim Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 861003.QC Verification of Const Activities Scheduled for Completion by 870130.Next Rept Will Be Submitted by 870220

From kanterella
(Redirected from TXX-6168)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 861003.QC Verification of Const Activities Scheduled for Completion by 870130.Next Rept Will Be Submitted by 870220
ML20212D226
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/18/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-54, TXX-6168, NUDOCS 8612310321
Download: ML20212D226 (1)


Text

Log # TXX-6168 File # 10110 903.7 TEXAS UTILITIES GENERATING COMPANY SEYWAY TOWER. 488 MOST98 OLIVE STREET. 3.5. 88. DAELAS. TEXAS 76398 December 18, 1986

  • R@KWRn

. w.

Mr. Eric H. Johnson, Director E I 9E Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission

~

611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 ORIGINAL DESIGN OF CONTROL ROOM CEILING SDAR: CP-86-54 (INTERIM REPORT)

Dear Mr. Johnson:

On October 3,1986, we notified you of a reportable item involving the design and installation of the control room ceiling (see TXX-6007). We have submitted a follow-up interim report logged TXX-6091, dated November 14, 1986.

This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e) and is provided to status the implementation of corrective actions.

Quality control verification of construction activities concerning the control room ceiling will be complete upon closure of outstanding inspection findings.

These activities are tentatively scheduled for completion by January 30, 1987.

Our next status report on this issue will be submitted no later than February 20, 1987.

Very truly yours, W. G. Counsil

~

By:

L G. S. Keeley 5

~

Manager,NuclearLih/ sing JCH/mlh c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 0612310321 861218 PDR ADOCK 05000445 S

PDR A ununxuos or mrs trusmra n n,nue anurm s/d