TXX-6091, Followup Interim Deficiency Rept CP-86-54 Re Original Design & Installation of Control Room Ceiling.Initially Reported on 861003.Physical Const of New Ceiling Complete.Qc Verification Scheduled for Completion by 861128

From kanterella
(Redirected from TXX-6091)
Jump to navigation Jump to search
Followup Interim Deficiency Rept CP-86-54 Re Original Design & Installation of Control Room Ceiling.Initially Reported on 861003.Physical Const of New Ceiling Complete.Qc Verification Scheduled for Completion by 861128
ML20214C257
Person / Time
Site: Comanche Peak  
Issue date: 11/14/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-54, DECFR-861114, TXX-6091, NUDOCS 8611210041
Download: ML20214C257 (1)


Text

Log # TXX-6091 File # 10110 903.7 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OLIVE STREET L.B. Et. DALLAS. TEXAS 75301 November 14, 1986 i+M@ i JWM +

w.um, l

NOV I 81986 L

e Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 ORIGINAL DESIGN OF CONTROL ROOM CEILING SDAR: CP-86-54 (INTERIM REPORT)

Dear Mr. Johnson:

On October 3,1986, we notified you of a reportable item involving the design and installation of the control room ceiling (see TXX-6007). This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e) and is provided to status the implementation of corrective actions.

The physical construction of the new ceiling is complete with the one remaining activity being quality control verification. This is tentatively scheduled for completion by November 28, 1986.

We will submit our next status report no later than December 19, 1986.

Very truly yours, h'

MatJ$

W. G. Counsil By:_

6/

G. S. Keeley Manager, Nuclea icensing JCH/mlh c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555

$h kOON

[

g0 s

g s unuro, or rrns amururs nraarc anawr