TXX-6117, Interim Deficiency Rept CP-86-36 Re Scope of Plant Mods Resulting from Project Pipe Support Reverification Program. Initially Reported on 860609.No Addl Instances Identified During Evaluation.Next Rept Will Be Submitted by 870108

From kanterella
(Redirected from TXX-6117)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-36 Re Scope of Plant Mods Resulting from Project Pipe Support Reverification Program. Initially Reported on 860609.No Addl Instances Identified During Evaluation.Next Rept Will Be Submitted by 870108
ML20215D554
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/25/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-36, TXX-6117, NUDOCS 8612160401
Download: ML20215D554 (2)


Text

"

Log # TXX-6117 File # 10110 903.9 TEXAS UTILITIES GENERATING COMPANY BKYWAY TOWER. 400 NORTH OLIVE STREET. I.IL 88. DALLAB. TEXAS 7M01 November 25, 1986 t'T.Sff.Y:S DEC - 9 PS6 Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKETS NOS. 50-445 AND 50-446 LARGE BORE PIPING AND SUPPORTS SDAR:

CP-86-36 (INTERIM REPORT)

Dear Mr. Johnson:

On June 9,1986, we verbally notified you of a reportable item involving the scope of plant modifications resulting from the project's pipe support reverification program (see TXX-4844). This is a follow-up interim report on a reportable item under provisions of 10CFR50.55(e). We have submitted interim reports logged TXX-4958, TXX-5033 and TXX-6044, dated August 13, 1986, September 26, 1986, and October 17, 1986, respectively.

The continuing engineering evaluation has not identified any additional instances which are considered reportable pursuant to 10CFR50.55(e). The attached list shows the support modifications issued to date. The evaluation is continuing and we anticipate submitting our next report by January 8, 1987.

Very truly yours,

&/

W. G. Counsil BSD/amb c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8612160401 861125 PDR ADOCK 0500044S S

PDR

{

.< t>n tstov or rn<s erts.unrs rurrure <wervr

TXX-6117 j.,..N::vembe r 25, 1986 Page 1 of 1 ATTACHMENT LARGE BORE PIPE SUPPORT MODIFICATIONS Number of Unit Cateoory Modifications

  • 1 Prudent 873 Recent Industry Practice 1143 Adjustment 198 Cumulative Effects 705 2

Prudent 1271 Recent Industry Practice 310 Adjustment 186 Cumulative Effects 509 Changes in these figures from the last report represent not only identification of further modifications but a reclassification and/or recategorization of certain supports.

l i

1 J