TXX-4958, Interim Deficiency Rept CP-86-36 Re Scope of Plant Mods Resulting from Pipe Support Reverification Program.Initially Reported on 860609.Encl Lists Support Mods Initiated to Date.Next Rept by 860926

From kanterella
(Redirected from TXX-4958)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-36 Re Scope of Plant Mods Resulting from Pipe Support Reverification Program.Initially Reported on 860609.Encl Lists Support Mods Initiated to Date.Next Rept by 860926
ML20214K566
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/13/1986
From: Counsil W, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-36, TXX-4958, NUDOCS 8608210276
Download: ML20214K566 (2)


Text

N - Log # TXX-4958 File # 10110 903.9 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER . 400 NORTH OLIVE ErFREET. L.B. 81. D AIJ AS. TEXAS 78901 August 13, 1986 Us%"?.Jf?J.7.*i p

@@ @Mg  !

Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects gg 15 l985 lI ,

U. S. Nuclear Regulatory Commission . ' ' "jl 611 Ryan Plaza Drive, Suite 1000 L Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 PIPE SUPPORTS SDAR: CP-86-36 (INTERIM REPORT)

Dear Mr. Johnson:

On June 9,1986, we notified you of a reportable item involving the scope of plant modifications resulting from the project's pipe support reverification program (see TXX-4844). This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e).

The continuing engineering evaluation has not identified any additional instances which are considered reportable pursuant to 10CFR50.55(e). The attached list show the support modifications initiated to date. The evaluation of this issue is continuing and we anticipate submitting our next report by September 26, 1986.

Very truly yours, k).Co. DM W. G. Counsil By:

D. R. Woodlan Licensing Supervisor JCH/arh Attachment c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8608210276 060913 PDR ADOCK 05000445 S PDR A inVES10N OF TEXAS UTILITIEN ELECTRIC COMPANY

&%D _

. . -. - .m

e: -

ATTACHMENT PIPE SUPPORT MODIFICATIONS Unit Cateaory Number af Modifications *

'I Prudent 852 Recent Industry Practice ~ 364 Adjustment 2 Cumulative Effects .83 II Prudent 691 Recent Industry Practice 90 Adjustment- 22 Cumulative Effects 144

  • Changes in these figures from the last report represent not only identification of further modifications but a reclassification and recategorization of certain supports.

e ,-,---.n - --, . . - - . , . , - - - , - - - , - - - - - - , - , - - va~. - - - ,.w,, ,,,--,,n.-,-w- -nm,--,,--,-n. - -, -.--. -