TXX-6113, Forwards Vols I & II of Comanche Peak Response Team Results Repts
| ML20214J888 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/19/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Noonan V NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM) |
| Shared Package | |
| ML20214J890 | List: |
| References | |
| CPRT-750, TXX-6113, NUDOCS 8612020025 | |
| Download: ML20214J888 (2) | |
Text
CPRT-750 LOG NO. TXX-6113 FILE NO. 10068 TEXAS UTILITIES GENERATING COMPANY SEEYWAY TOWWE e 400 NORTBI OLIVE STREET. k.B. 81. DAIJ.AS. TEXAS 78801 November 19, 1986 aown w. nex VICE PRESIDE 8t?
Director of Nuclear Reactor Regulation Attn: Vince S. Noonan, Director Comanche Peak Project Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 CPRT RESULTS REPORTS
Dear Mr. Noonan:
We transmit herewith the following SRT approved Results Reports:
III.a.2 JTG Approval of Test Data - Rev.0 III.a.3 Technical Specification for Deferred Tests - Rev.0 V.a Inspection for Certain Types of Skewed Welds in NF Supports - Rev.1 V.c Design Consideration for Piping Systems Between Seismic Category I Buildings - Rev.1 V.e Installation of Main Steam Pipes - Rev.1 VII.a.6 Exit Interviews - Rev.1 VII.a.8 Fuel Pool Liner Documentation - Rev.1 For your convenience, these Results Reports are contained in the enclosed binders together with all Results Reports issued to date.
kk p
DO 9
^
90 I
A DEVISION OF TEKA8 M7,8 EERCTEIC LDMPANY
November 19, 1986 Page 2 The files which contain supporting documentation for these Results Reports have been reproduced in their entirety and are available for public inspec-tion in our Dallas office.
Anyone wishing to inspect these files should contact Ms. Susan Palr.n (214/979-8242).
We shall issue further Results Reports on a periodic basis as they are approved by the CPRT Senior Review Team.
Very truly yours, M
W. G. Counsil WGC/lmi Enclosures
.