TXX-6090, Interim Deficiency Rept CP-86-31 Re Diesel Generator Lube Oil Sump Tank Foot Valves.Initially Reported on 860822.New Viton Liners Will Be Installed by 861205 for Unit 1 & by 870301 for Unit 2.Next Rept Expected by 870301

From kanterella
(Redirected from TXX-6090)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-31 Re Diesel Generator Lube Oil Sump Tank Foot Valves.Initially Reported on 860822.New Viton Liners Will Be Installed by 861205 for Unit 1 & by 870301 for Unit 2.Next Rept Expected by 870301
ML20214F374
Person / Time
Site: Comanche Peak  
Issue date: 11/17/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-31, TXX-6090, NUDOCS 8611250281
Download: ML20214F374 (1)


Text

Log # TXX-6090 File # 10110 909.5 TEXAS UTILITIES GENERATING COMPANY isKYWAY TOWER. 4se NORTH OLIVE STREET. I.B. 88. DALLAS.1EXAS 75201 November 17, 1986 WILLIAM G. COUNSlL satcuavs met Persontm?

Mr. Eric H. Johnson, Director NOV 2 01986 Division of Reactor Safety and Projects j

U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 DIESEL GENERATOR LUBE OIL SUMP TANK FOOT VALVES SDAR: CP-86-31 (INTERIM REPORT)

Dear Mr. Johnson:

On August 22, 1986 we notified you of a reportable item involving the possible failure of the rubber facing on foot valves mounted in the diesel generator lube oil sump tank (see TXX-4975). This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e) and is provided to status the implementation of corrective actions.

New Viton liners have been purchased and received at the CPSES site.

Unit I work orders have been issued and installation is expected to be complete by December 5, 1986.

Unit 2 replacement liners are scheduled for installation after lube oil flush of the diesel generator system which is tentatively scheduled for completion by March 1, 1987.

We will submit our next status report no later than March 27, 1987.

Very truly yours, 7(M W. G. Counsil j

RWH/mlh c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 8611250281 861117 PDR ADOCK 05000445 S

PDR

)

a nuruswx or rms run unes runrnue cmumr r8