Interim Deficiency Rept CP-86-11 Re Component Cooling Water Pump Impeller Linear Indications.Initially Reported on 860623.Requisition for Offsite Repair of Replacement Spare Impeller Being Processed.Next Rept Anticipated by 861205
ML20215C633
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/01/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-11, TXX-5036, NUDOCS 8610100379
Download: ML20215C633 (1)


Text

._

Log # TXX-5036 File # 10010 909.2 TEXAS UTr.LITIES GENERATING COMPANY I EYWAY TOWER . d'A NORTH OI.IVE RTMEP:T. L.B. 81 = DALLAS. TEXAN 7b201 October 1, 1986

= = = = ,  %$@$

v OCT - 2 i986 .

Mr. Eric H. Johnson, Diractor i '

Division of Reactor Safety and Projects -

U. S. Nuclear Regulatory Commission J 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 COMP 0NENT COOLING WATER PUMP IMPELLER LINEAR INDICATIONS SDAR: CP-86-11 (INTERIM REPORT)

Dear Mr. Johnson:

On June 23, 1986, we notified you of a reportable item involving linear indications on impellers for the component cooling water (CCW) pumps (see TXX-4871). This is a follow-up interim report on a reportable item under the provision of 10CFR50.55(e). We received an extension in submitting this report from your Mr. T. Westerman until Octoher 3, 1986.

The inspection of the Unit 1, Train A, CCW pump inpeller is currently scheduled for completion in October,1986. Train B impeller will be inspected following the availability of Train A service water (scheduled for mid-November 1986). Upon completion of each inspection, the extent of the required rework will be determined and the repair will be scheduled as required.

We are processing a requisition for the off-site repair of the replacement

" spare" impeller. Upon completion of this requisition processing and approval, the replacement " spare" impeller will be repaired.

We anticipate submitting our next report by December 5, 1986.

Very truly yours, W. G. Co sil By: .

G. S. Keeley e L Manager,NuclearLiMnsing g0%$h b S