TXX-4995, Interim Deficiency Rept CP-86-37 Re Firing Board Assemblies & Amplifier Boards Used in Class 1E Battery Chargers. Initially Reported on 860514.Evaluation Determined That non-Class 1E Parts Bought for Sys.Next Rept by 861015

From kanterella
(Redirected from TXX-4995)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-37 Re Firing Board Assemblies & Amplifier Boards Used in Class 1E Battery Chargers. Initially Reported on 860514.Evaluation Determined That non-Class 1E Parts Bought for Sys.Next Rept by 861015
ML20210C048
Person / Time
Site: Comanche Peak  
Issue date: 09/10/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-37, TXX-4995, NUDOCS 8609180223
Download: ML20210C048 (1)


Text

e Log #-TXX-4995 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER. 400 NORTH OLIVE frt1tEET. L.B. Si a DALLAS. TEXAS 78201 September 10, 1986 ON %??E.?*%

Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 CLASS 1E BATTERY CHARGERS SDAR: CP-86-37 (INTERIM REPORT)

Dear Mr. Johnson:

On May 14, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving firing board assemblies and amplifier boards used in Class IE battery chargers that do not conform to vendor assembly drawings. This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). We have submitted interim reports logged TXX-4855 and TXX-4914, dated July 13, 1986, and July 16, 1986, respectively. We received an extension in submitting this report from your Mr. T. Westerman until September 10, 1986.

Evaluation of this issue has shown that non-Class 1E parts were purchased for a Class 1E system. This was due to an engineering error in determining the proper part.from the vendor drawing. We are trying to confirm that this is an isolated event. We are continuing our evaluation and anticipate submitting our next report by October 15, 1986.

Very truly yours, bV L;4 W. G. Counsil i 8609180223.860910 By: /_r PDR ADOCK 05000445 G. S. Keeley S

PDR Manager, Nuclear ensing JCH/amb c - NRC Region IV (0 + 1 copy) g Q g QM@_ D Director, Inspection & Enforcement (15 copies) e U. S. Nuclear Regulatory Commission SEP 128 Washington, D.C.