TXX-4855, Interim Deficiency Rept CP-86-37 Re Class 1E Battery Charger Firing Board Assemblies & Amplifier Boards Not Conforming to Vendor Assembly Drawings.Evaluation Continuing.Next Rept Will Be Submitted by 860716

From kanterella
(Redirected from TXX-4855)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-37 Re Class 1E Battery Charger Firing Board Assemblies & Amplifier Boards Not Conforming to Vendor Assembly Drawings.Evaluation Continuing.Next Rept Will Be Submitted by 860716
ML20199F952
Person / Time
Site: Comanche Peak  
Issue date: 06/13/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-37, TXX-4855, NUDOCS 8606240623
Download: ML20199F952 (1)


Text

Log # TXX-4855 File C 10110 908.3 TEXAS UTILITIES GENERATING COMPANY SKYW AY TOWER. 400 NORTII OI IVE STREET. L.B. 81. DAI.LAN. TEX A8 78301 June 13, 1986 b@

" M O S 5?fn'A I

Qgg Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission i

611 Ryan Plaza Drive, Suite 1000

,R-

--l Arlington, TX 76012 L

l

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 CLASS lE BATTERY CHARGERS SDAR:

CP-86-37 (INTERIM REPORT)

Dear Mr. Johnson:

On May 14, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving firing board assemblies and amplifier boards used in Class 1E battery chargers that do not conform to vendor asser..bly drawings. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).

We are continuing our evaluation and anticipate submitting our next report by July 16,1986.

Very truly yours, f'N W. G. Counsil JCH/arh c - NRC Region IV (0 + 1 Copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 t

8606240623 860613 gDR ADOCK 05000445 l

PDR Q-(Y b5~

A DEVIS10N OF TEXAS UTILITIES ELECTRIC COMPANY h