TXX-4953, Forwards Comanche Peak Review Team Results Repts,Including Rev 2 to Isap I.a.4, Agreement Between Drawings & Field Terminations & Rev 1 to Isap I.a.5, Nonconformance Repts on Vendor Installed Amp Terminal Lugs
| ML20205D193 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/11/1986 |
| From: | Beck J, Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Noonan V NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM) |
| Shared Package | |
| ML20205D198 | List: |
| References | |
| CPRT-597, TXX-4953, NUDOCS 8608150296 | |
| Download: ML20205D193 (2) | |
Text
__
CPRT-597 Log # TXX-4953 File # 10068 TEXAS UTILITIES GENERATING COMPANT SKYW AY TOWER. 400 NOR'TH OLIVE STREET. L.B. SI. DALLAS. TEXAS 75301 August 11, 1986 0N'A*E?E2?.7&'Er Director of Nuclear Reactor Regulation Attn:
Vince S. Noonan, Director Comanche Peak Project Division of Licensing U. S. Nue. lear Regulatory Commission Washington, D.C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 CPRT RESULTS REPORTS
Dear Mr. Noonan:
We transmit herewith the SRT approved Results Reports listed below. The files which contain supporting documentation for the Results Reports have been reproduced in their entirety and are available for public inspection in our Dallas office. Anyone wishing to inspect these files should contact Ms. Susan Palmer (214/979-8242).
I.a.4 Agreement Between Drawings and Field Terminations, Revision 2 I.a.5 NCR's on Vendor Installed Amp Terminal Lugs, Revision 1 VII.a.5 Periodic Review of QA Program, Revision 1 We shall issue future Results Reports on a periodic basis as they are approved by the CPRT Senior Review Team.
Very truly yours, i
i W. G. Counsil By: h d. b >_
J. S. Beck Vice President WGC/arh Enclosures 0
8608150296 860011 l
PDR ADOCK 00000445 I
I l A
PDR A titvssuos or rexAs ursuries essernac coursur
CPRT-596 Log # TUS-4903 File # 10068 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER
- 400,comTIE OBJVE WrmBET. L.B. 81
- DA11AS. TEXAS 7890 8 August 11, 1986
'L"EJ.,US*
MEMORANDUM T0: Mr. W. G. Counsil
SUBJECT:
CPRT RESULTS REPORTS We transmit herewith the SRT approved Results Reports listed below. The files which contain supporting documentation for the Results Reports have been reproduced and are available in the Dallas file room for public inspection.
I.a.4 Agreement Between Drawings and Field Terminations, Revision 2 I.a.5 NCR's on Vendor Installed Amp Terminal Lugs, Revision 1 VII.a.5 Periodic Review of QA Program, Revision 1 John W. Beck
- Chairman, CPRT Senior Review Team JWB:arh Enclosures cc: CPRT File A DEVEREON OF TEXAB (TETLETIES ELECTERC COMPANY
_ _ _ _ _ _.