TXX-4912, Interim Deficiency Rept CP-84-12 Re Environ Qualification of Equipment Outside Containment for High Energy Line Breaks. Initially Reported on 840604.Evaluation Continuing.Next Rept Will Be Submitted by 860919
| ML20207K903 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/16/1986 |
| From: | Counsil W, Keeley G TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-84-12, TXX-4912, NUDOCS 8607300110 | |
| Download: ML20207K903 (1) | |
Text
Log # TXX-4912 File # 10110 903.11 TEXAS UTIL,iTIES GENERATING COMPANY
......,_..._._..,_._...........m........_,
July 16, 1986 f}$
K' '
' Jj['~@llyG(\\//
Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects U. S. Nuclear Regulatory commission 611 Ryan Plaza Drive, Suite 1000 f
dUl2l1986 Arlington, TX 76012 L
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 IMPACT OF HELB TEMPERATURES ON QUALIFIED EQUIPMENT OUTSIDE CONTAINMENT SDAR: CP-84-12 (INTERIM REPORT)
Dear Mr. Johnson:
On June 4,1984, we verbally notified your Mr. D. Hunnicutt of a deficiency 1
involving the environmental qualification of equipment outside containment for high energy line breaks (HELB). This is an interim report of a potentially reportable item under provisions of 10CFR50.55(e). Our most recent interim report was logged TXX-4808, dated May 16, 1986.
We are continuing our evaluation and anticipate submitting our next report by September 19, 1986.
Very truly yours, j
i W. G. C u s :1 By:/
/
G. S. Keeley,
Manager, NucT ticensing i
JCH/arh I
c - NRC Region IV (0 + 1 Copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission
]
Washington, D.C.
20555,,
l 8607300110 860716 DR ADOCK 0500 5
4 6
/
e4 g
.1 --
_