TXX-4809, Interim Deficiency Rept CP-86-15 Re Diesel Generator Controls Involving Field Flash & K1 Relays.Initially Reported on 860314.Evaluation Continuing.Next Rept Should Be Submitted by 860618
| ML20155K269 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/16/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-15, TXX-4809, NUDOCS 8605280019 | |
| Download: ML20155K269 (1) | |
Text
Log # TXX-4809 File 0 10110 909.5 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OLIVE STREET. L.B. e t. DAILAB. TEXAS 78901 WILLIAM G COUN91L ERECUTevt vict PegeneEst Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 DIESEL GENERATOR CONTROLS SDAR:
CP-86-15 (INTERIM REPORT)
Dear Mr. Johnson:
On March 14, 1986, we verbally notified your Mr. T. F. Westerman of a deficien-cy involving the field flash and K1 relays which are required to operate during the starting process of the diesel generators.
This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4764, dated April 14, 1986.
We are continuing our evaluation and anticipate submitting our next report by June 18, 1986.
Very truly yours, MS W. G. Counsil JCH/arh c - NRC Region IV (0 + 1 Copy)
Director, Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 8605280019 e60516 ADOCK 0500 5
gDR
- f, A DIVEREON OF TEXAS UTTLETIES EERCTRIC ContFANY
- N
-