TXX-4697, Forwards Rev 1 to Inservice Testing Program,Response to Sser 12 & Current Drawing Rev Referenced in Program Plan.W/O Encls

From kanterella
(Redirected from TXX-4697)
Jump to navigation Jump to search
Forwards Rev 1 to Inservice Testing Program,Response to Sser 12 & Current Drawing Rev Referenced in Program Plan.W/O Encls
ML20205J744
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/21/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Noonan V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
References
TXX-4697, NUDOCS 8602260383
Download: ML20205J744 (1)


Text

-

c.

Leg # TXX-4697 File # 10010 903.9 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER . 400 NORTH OLIVE frrREET. I.St. 81

  • DAI.LAN. TEKAS 78301 February 21, 1986
  1. An^"Af?J.7.*A Director of Nuclear Reactor Regulation Attention: Mr. Vince S. Noonan, Director Comanche Peak Project Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 INSERVICE TESTING (IST) PROGRAM

Dear Mr. Noonan:

In the CPSES Safety Evaluation Report Supplement No. 12, the NRC staff evaluated the CPSES Unit 1 IST program for compliance with applicable codes and regulations, including the acceptability of specific requests for relief.

TUGC0 has reviewed the staff's evaluation and has revised the CPSES IST program accordingly (Revision 1) which is provided as enclosure 1. Where appropriate, additional requests for relief are provided.

Enclosure 2 is a point-by-point response to the staff's evaluation, and provides the basis for the changes included in Revision 1 to the CPSES IST program.

Enclosure 3 provides the current revisions of drawings referenced in the IST Program Plan.

Very truly yours, ai.CCua/

W. G. Counsil SSD/ arm /

Enclosures /

By: A, Original plus 1 copy G.S. Keeley c- A. Vietti-Cook 8602260383 860221 ,

I PDR ADOCK 05000445 M A PDR ,

FI a omsuou or ruxa urn.mes stecrmic couraur a j