TXX-4626, Interim Deficiency Rept SDAR-187 Re Deviation from FSAR Criteria in Design of Upper Lateral Restraint Embedment. Initially Reported on 850719.Evaluation Continuing Under Program Plan Item V.B.Completion Anticipated by 860122
| ML20137W737 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/20/1985 |
| From: | Counsil W, Woodlan D TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Denise R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| SDAR-187, TXX-4626, NUDOCS 8512100326 | |
| Download: ML20137W737 (1) | |
Text
. _ _ _ _ _
t I
Log # TXX-4626 l
TEXAS UTILITIES GENERATING COMPANY Fi1e # 10110 mKYW AY TUWER. 400 N(DET98 DEJVR FFRENT, L.IB. 5 8 e DALLAN. TEXAB 75301 November 20, 1985 i
enua o couwit e acunwr vece reasiosur l
Mr. R. P. Denise, Director Division of Reactor Safety and Projects js U.S. Nuclear Regulatory Commission ig NOV 2 51985 611 Ryan P1 na Drive, Suite 1000 i
Arlington,
','X 76012 L\\
- b
SUBJECT:
CCMANCHE PEAK STEAM ELECTRIC STATION DOCKET NO. 50-445 UPPER LATERAL RESTRAINT EMBEDMENT DESIGN QA FILE: CP-85-26, SDAR-187
Dear Mr. Denise:
l ~
On July 19, 1985, we verbally notified your Mr. D. Powell of a deficiency regarding the deviation from FSAR criteria in the design of the Unit 1 Steam Generator upper lateral restraint embedment.
We have submitted an interim report logged TXX-4532, dated August 9, 1985.
The concern is being evaluated under CPRT Program Plan Item V.b.
We are continuing our evaluation and anticipato completion by January 22, 1986.
Very truly yours, 0. 0,. O W. G. Counsil By:
D. R. Woodlan l
Licensing Supervisor JCH/grr c' - NRC Region IV (0 + 1 copy) i Director, Inspection & Enforcement (15 copies) l U. S. Nuclear Regulatory Commission Washington, D.C.
20555
%2Q$0 P
6 j~E C Zg.9
.,,, v,.,,,,,,, _. mm.
mc,,c e
~,
'I e