TXX-4545, Updates Util Re Max Allowable Time for Operator Action Following Control Room/Cable Spreading Room Fire, Concurrent W/Loss of Offsite Power.Safe Shutdown Equipment in UPS Room Operable More than 10 Minutes W/O Ventilation

From kanterella
(Redirected from TXX-4545)
Jump to navigation Jump to search
Updates Util Re Max Allowable Time for Operator Action Following Control Room/Cable Spreading Room Fire, Concurrent W/Loss of Offsite Power.Safe Shutdown Equipment in UPS Room Operable More than 10 Minutes W/O Ventilation
ML20135A310
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/04/1985
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Noonan V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
References
TXX-4545, NUDOCS 8509100095
Download: ML20135A310 (1)


Text

7 Log # TXX-4545 TEXAS UTILITIES GENERATING COMPANYFile # 10010 909.5

.o.1,.oi.

- r.

...... u.. m m.......

3 M O a 5?fn'A September 4, 1985 Director of Nuclear Reactor Regulation Attention: Mr. Vincent S. Noonan, Director Comanche Peak Project Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET N05. 50-445 AND 50-446 OPERATOR ACTION TO RESTORE UPS ROOM VENTILATION DURIhG A POSTULATED CONTROL ROOM / CABLE 3PREADING ROOM FIRE

Dear Mr. Noonan:

Texas Utilities letter TXX-4528 dated August 6,1985 stated that for a Control Room / Cable Spreading Room Fire, concurrent with a loss of offsite power, operator action to restore UPS room vent!1ation is required in less than ten minutes.

We have reviewed the qualification of the safe shutdown equipment contained in the UPS room and have determined that the equipment can operate for greater than ten minutes without ventilation.

Should you have any questions in this matter, please contact this office.

Very truly yours,-

Ti j

W. G. Counsil BSD/grr

%[