TXX-4401, Forwards Table Providing Description of Amend 54 to FSAR
| ML20114C770 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/21/1985 |
| From: | Woodlan D TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Burwell S Office of Nuclear Reactor Regulation |
| References | |
| TXX-4401, NUDOCS 8501300503 | |
| Download: ML20114C770 (9) | |
Text
g Log # TXX-4401 File # 10010 TEXAS UTILITIES GENERATING COMPANY MKYWAY TOWER. 400 NORTH () LIVE MTREET. L.B. RI
- DALLAM.TEXAM 75201 January 21, 1985 Mr. S. B. Burwell Licensing Project Manager U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 FSAR AMENDENT 54 DESCRIPTION sear Mr. Burwell:
Attached is a table providing the description of A.nendment 54, dated January 21, 1985.
h Sincerely, D. R. Woodlan RWH/grr Attachment cc:
J. J. Stefano J. D. Redding G. S. Keeley (w/ amendment)
R. A. Jones (w/ draft amendment)
J.y fDft 0
4 A
A DIVIN10N 09' TEXAN l'TILITIEN KLECTNGC COMi%NY L
?
CPSES/FSAR AMENDENT 54 DESCRIPTION i
,/
Sec tion Description of Change 1
1.2 Provides update to the environmental monitoring program.
Provides update to include I&C description of UPS HVAC system (See al so Section 7.3).
T1.7-1 1A(B)
Provides update to include commitment to BTP RSB 5-1, natural circulation testing (See also Sections 5A, II.B.3, Q212).
Provides clarification to R.G.1.144 to include correct revision number.
Provides clarification to description of R.G.1.146 to' include da tes.
3.1 Provides description of documentation applied to code case usage.
T3.2-3 Provides update to flow diagrams.
(Refer to page 8 for coglete listing of updated flow diagrams).
3.7B Provides update to criteria on how non-category I equipment is eval ua ted. _-_ __
CP SES/FSAR j
Sec tion Description of Change 3.8 Provides response to ILRT question (See also Section T14.2-2, Q022).
3.10B Provides correction of damping values from 5% to 7% used for c:ble trays.
5A Provides update to include commitment to BTP RSB 5-1, natural circulation testing (See also Section 1A(B), II.B.3, Q212).
T6.4-3 Provides revision to control room
)
humidity ifmits to agree with FSAR Section 3.118.4.2 (See also Section 9.4, T9.4-2).
7.2 Provides correction to reference correction sets vs. channels.
T7.2-1 Provides correction to the steam generator low-low logic.
7.3 Provides annunciation in the control room indicating bypass of the Phase "A" containment isolation signal (PASS) (See also Section II.B.3).
Provides update to IAC description of control room HVAC (See also Section 9.4).
i.. _ _...
CPSES/FSAR Section Description of Change Provides update to include I&C description of UPS HVAC system (See al so Section 1.2).
7.5 Provides update to accident monitoring.
T7.5-2 T7.5-3 T7.5-6 1/.5-7 7.6 Provides ciarification of valve annunciated in pressurizer PORY f
line.
8.3 Provides minor corrections to ESFAS and SIAS logic descriptions (See al so Section F15.0-21).
T8.3-1A Provides revision to control room TS.3-1B emergency pressurization heater nameplate rating.
l T8.3-2 Provides change to sequence time for CRDM vent fans.
t T9.2-3 Provides update to component cooling water chemistry.
9.4 Provides revision to control room humidity limits to agree with FSAR
. l p.
mm n,+sn-,-
w p
e
,,,--9
- CP SES/FSAR Section Description of Change Sec tion 3.118.4.2 (See also Section T6.4-3, T9.4-2).
Provides update to ISC description of control room HVAC (See also Section 7.3).
T9.4-2 Provides revision to control room humidty limits to agree with FSAR Section 3.118.4.2 (See also Section T6.4-3,9.4).
T9.4-5 Provides clarification to CRDM shroud temperature.
9.5 Provides editorial corrections.
Provides organizational updates (See also Section 13.1).
Provides description of method to implement rec'irement to keep-portable cosumnics.on repeater free.
from fire damage.
i -
s l
Provides update to description of diesel generator cooling water corrosion inhibitor, j.
10.4 Provides update of turbine-driven auxiliary feed-water pump description..
CPSES/FSAR Section Description of Change T11.2-9 Provides update to reflect revised process parameters.
11.4 Provides update of Solid Waste Management System (SWMS) to reflect the revised process control program (See al so Section T11.4-1, Til.4-2, F11.4-1, F11.4-2).
Provides update to SWMS operating personnel exposure limits.
Provides SWMS update of the containers used to package k
radioactive waste.
T11.4-1 Provides update of Solid Waste T11.4-2 Management System (SWMS) to reflect F11.4-1 the revised process control program F11.4-2 (See also Section 11.4).
11.5-Provides update to iodine sampling to allow use of silver zeolite fil ters.
12.1 Provides corrected job' titles and program description for radiation protec tion.
13.1 Provides organizational updates (See al so Section 9.5).
CPSES/FSAR Section Description of Change 13.3 14.2 Provides update to reflect the performance of some initial startup tests during the preoperational test pha se.
T14.2-2 Deletes requirement to measure neutron detector well tenperature during power escalation.
Provides response to ILRT question (See also Section 3.8, Q022).
T14.2-3 Provides update to change net load rejection to full load rejection for turbine generator trip test.
F15.0-21 Provides minor corrections to ESFAS and SIAS logic descriptions (See al so Section 8.3).
15.1 17.1 Provides update to job titles.
17.2 Provides editortal correction.
II.B.3 Provides annunciation in the control rcos indicating bypass of the Phase "A" containment isolation signal (PASS) (See also Section 7.3).
CPSES/FSAR i
Section Description of Ch:: ige Q010 Provides response to question on Fire Safe Shutdown.
Q022
/rovides response to ILRT question (See al so Section 3.8, T14.2-2).
QO32 Provides correction to description of how high positive / negative rate trips are tested.
T032.110-1 Provides update to accident T032.110-2 monitoring.
T032.110-4 T032.110-5 f
Q033 Provides revised response on SPDS isolation.
Q130 Provides clarification to SGEB question responses.
Q212 Provides update to include constituent tc BTP RS8 5-1, natural circulation testing (See also Section 1A(B), 5A, II.B.3)..-.
~
REVISED FSAR FLOW DIAGRAMS F3.2-1 F9.5-52 (Sh.1)
FS.1-1 (Sh. 1)
F10.3-1 (Sh.1)
F5.1-1 (Sh. 2)
F10.3-1 (Sh. 2)
F5.4-6 F10.3-1 (Sh. 3)
F6.2.2-1 F10.4-3 F6.3-1 (Sh. 1)
F10.4-4 F6.3-1 (Sh. 2)
F10.4-5 F6.3-1 (Sh. 3)
F10.4-7 (Sh.1)
~.
F9.1-13 (Sh. 1)
F10.4-8 F9.1-13 (Sh. 2)
F10.4-9 (Sh.1)
F9.2-1 (Sh. 1)
F10.4-9 (Sh. 2)
F9.2-1 (Sh. 2)
F10.4-10 F9.2-3 (Sh. 1)
F10.4-11 F9.2-3 (Sh. 2)
F10.4-13 F9.2-3 (Sh. 3)
F10.4-14 (Sh.1)
F9.2-4 F10.4-14 (Sh. 2)
F9.2-4A F10.4-14 (Sh. 3)
F9.2-5 (Sh. 1)
F10.4-15 F9.2-5 (Sh. 2)
F10.4-16 (Sh.1)
F9.2-6 F10.4-16 (Sh. 2)
F9.2-7 F10.4-17 F9.2-15 F10.4-18 F9.3-2 F10.4-19 F9.3-3 (Sh. 1)
F10.4-20 F9.3-3 (Sh. 2)
F11.2-2 F9.3-3 (Sh. 3)
F11.2-3 7
F9.3-4 F11.2-4 F9.3-5 F11.2-5 F9.3-6 F11.2-6 F9.3-7 (Sh. 3)
F11.2-7 F9.3-7 (Sh. 4)
F11.2-8 F9.3-9 F11.3-1 (Sh. 1)
F9.3-10 (Sh. 1)
F11.3-1 (Sh. 2)
F9.3-10 (Sh. 2)
FII.B.3-1 F9.3-10 (Sh. 3)
F9.3-10 (Sh. 4)
F9.3-10 (Sh. 5)
F9.3-11 (Sh. 1)
F9.3-11 (Sh. 2)
F9.4-1 (Sh. 1)
F9.4-2 (Sh. 1)
F9.4-2 (Sh. 2)
F9.4-3 F9.4-4 F9.4-5 F9.4-6 F9.4-7 F9.4-8 F9.4-9 F9.4-11 F9.4-12 F9.4-14 r