TXX-4303, Informs That Comparison Demonstrating Applicability of Diablo Canyon Natural Circulation/Boron Mixing Prototype Test Results to Facility Will Be Provided.Test Will Be Performed If Results Unsatisfactory
| ML20098F761 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/24/1984 |
| From: | Beck J TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Youngblood B Office of Nuclear Reactor Regulation |
| References | |
| TXX-4303, NUDOCS 8410030345 | |
| Download: ML20098F761 (1) | |
Text
"z
- a Log # TXX-4303 File # 10010 TEXAS UTILITIES GENERATING COMPANY MMYWAY TOWEN. 400 NONTH OLIVE MTBtEET, L.II. Mt e inA LLAN, TEXAM 18308 September 24, 1984 Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 SPECIAL LOW-POWER TEST PROGRN4 REF:
1)
H. C. Schmidt letter to H. R. Denton dated July 7,1983 2)
B. J. Youngblood letter to R. J. Gary dated March 6,1984
Dear Mr. Youngblood:
In reference to the Diablo Canyon natural circulation / boron mixing prototype test to be performed per Branch Technical Position (RSB) 5-1, CPSES will provide a plant comparison that demonstrates the applicability of Diablo Canyon's test results to CPSES.
In the event the Diablo Canyon test provides unsatisfactory results, or is delayed, or other Westinghouse facilities have not performed such testing, CPSES will perform a natural circulation test during the startup phase of the first refueling outage that met.ts the requirements of RSB 5-1.
The above information will be documented in the CPSES FSAR prior to fuel load.
Sincerely, O f %'. $-A -
S J. W. Beck Manager, Licensing JWB:kp
$?BEPcfoEhi A
A DIVINDON OF TEXAN l'TILITIEN ELECTMit COMI%NY