TXX-4041, Requests Extension Until 840229 for Submital of Response to Generic Ltr 83-28 Re Required Actions Based on Generic Implications of Salem ATWS Events
| ML20085H645 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/06/1983 |
| From: | Schmidt H TEXAS UTILITIES SERVICES, INC. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| GL-83-28, TXX-4041, NUDOCS 8309120198 | |
| Download: ML20085H645 (1) | |
Text
TEXAS UTILITIES SERVICES INC.
Log # TXX-4041 File # 10140 un nnm um ianuu.w.mm.*"-
September 6, 1983 U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D.C.
20555 Attention: Mr. D. G. Eisenhut, Director
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 GENERIC LETTER 83-28
Dear Mr. Eisenhut:
With reference to NRC Generic Letter 83-28 concerning the required actions based on the generic implications of the Salem ATWS events, CPSES requests an extension of time to respond to Sections 2.1 and 2.2.
The Nuclear Utility Task Action Committee (NUTAC) was formed September 1, 1983 by 42 utilities and is sponsored by the Industry Review Group (IRG) of the Institute of Nuclear Power Operations (INP0).
The specific purpose of NUTAC is to define an appropriate vendor interface program.
Being a participant in NUTAC as well as the INP0 SEE-IN and NPRDS programs, we will concurrently evaluate in more detail our plant's existing capabilities for interfacing with vendors. After completion of NUTAC's efforts, we will submit our program description to the NRC by February 29, 1984.
Sincerely, H. C. Schmidt RWH:grr cc:
S. B. Burwell 0
8309120198 B30906 PDR ADOCK 05000445 A