TXX-3627, Responds to IE Bulletin 82-04.Discrepancies Not Indicated in Examined Bunker Ramo Electrical Penetration Assemblies. Onsite Test Program Needed for Acceptance of in-line Butt Splices.Extension to 830701 Requested to Complete Review
| ML20077G091 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/23/1983 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| REF-SSINS-6820, REF-SSINS-SSINS-6 IEB-82-04, IEB-82-4, TXX-3627, NUDOCS 8308030363 | |
| Download: ML20077G091 (1) | |
Text
P O
n TEXAS UTILITIES GENERATING COMPANY Log # TXX-3627 mu nnyw row ui.nsuas. Texas w2<u File # 10115 R. J. GARY
""I'J:JP =rlr' February 23, 1983 Mr. John T. Collins U. S. Nuclear Regulatory Conmission Region IV RIV 611 Ryan Plaza Drive, Suite 1000 Docket Nos. 50-445/IE Bulletin No. 82-04 Arlington, Texas 76012 50-446/IE Bulletin No. 82-04
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION r%[E{(n. _. _
1981-83 2300 MW INSTALLATION lh"-
']
IE BULLETIN 82-04 U
FEB28l983 a
Dear Mr. Cellins:
j Our review of Bunker Ramo Company electrical penetration assemoiin referenced in IE Bulletin 82-04 is not yet complete.
To date, 75% of the penetration assemblies have been reviewed without indication of sny discrepancies associated with item lb of the bulletin. However, preliminary data indicates that an on-site test program will have to be developed to establish acceptance of the in-line butt splices referenced in items 1c and 2b.
The remaining inspections, testing and evaluations will require an additional four months.
We therefore request an extension to July 1,1983 to complete our review and implement corrective action as necessary. Should you have additional questions please contact this office.
Sincerely,
/
i R. /0. Ga ry RJG:tls cc:
U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.C.
20555 f
agraa8eraa8aga o