TXX-3301, Informs That Preservice Exam Requirements Have Been Incorporated in QA Program & Will Be Performed by QC Personnel.Preservice Insp Will Be Verified Completed within Six Months of Preoperational Testing
| ML20003G632 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 04/13/1981 |
| From: | John Marshall TEXAS UTILITIES SERVICES, INC. |
| To: | Tedesco R Office of Nuclear Reactor Regulation |
| References | |
| TXX-3301, NUDOCS 8104300313 | |
| Download: ML20003G632 (1) | |
Text
h&t d TEN
,t
' 4TCS SERVICES INC.
Log # TXX-3301 2 oui nava.s.ow.a.ortus.rsxas 7 sani File 10010.1 April 13,1981 4
v>
ro Mr. Robert L. Tedesco 2,
4pg2 1
S gg7A Assistant Director J
5 g%
Division of Licensing i.
U. S. Nuclear Regulatory Comission Washington, D.C.
20555
( /bp
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION PRESERVICE INSPECTION AND TESTING 0F SNUBBERS
REFERENCE:
NRC 8.ETTER DATED JANUARY 14, 1981
Dear Mr. Tedesco:
The preservice examination requirements listed in the referenced letter are already incorporated as part of the CPSES Quality Assurance Program and will be performed and documented by CPSES Construction Quality Control personnel.
The preoperational testing requirements have been incorporated into chapter 14 of the FSAR. As a prerequisite to the pre-operational testing, the preservice inspection will be verified to have been completed within 6 months of the preoperational testing.
Sincerely, J. S. Marshall BSD:skf cc: