TXX-3267, Informs That Evaluation of pull-out Performance of 1-inch Diameter Hilti Kwik-Bolt Anchors Continues Due to Change in Published Values.Status Rept Will Be Provided by 810901
| ML20002D281 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/12/1981 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| TXX-3267, NUDOCS 8101200242 | |
| Download: ML20002D281 (1) | |
Text
_.
TEXAS UTILITIES GENERATING COMinNY 2001 BRYAN TOWER
- DAILAB.TEXAM 78201
..ui.. ';7. ^."7...,
January 12, 1981 TXX-3267 Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket Nos. 50-445 Arlington, Texas 76012 50-446 t
COMANCHE PEAK STEAM tLECTRIC STATION PULL-0VT PERFORMANCE OF HILTI KWIK-BOLT ANCHORS FILE N0:
10110
Dear Mr. Seidle:
On December 17, 1980 we verbally informed your Mr. R. G. Taylor of a change in published values of the ultimate pull-out performance of one inch diameter HILTI Kwik-Bolt anchors.
We are continuing our evaluation and should be in a position to provide a status report by September 1,1981.
Very truly yours, R./. Gary-RJG:dk cc: NRC Region IV - (0 + 1 copy)
DirActor, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 O
81012008 b d
i