TXX-3173, Submits Corrections to 800725 Deficiency Rept TXX-3166. Verbally Reported Date Should Be 791115 Instead of 800229

From kanterella
(Redirected from TXX-3173)
Jump to navigation Jump to search
Submits Corrections to 800725 Deficiency Rept TXX-3166. Verbally Reported Date Should Be 791115 Instead of 800229
ML19331B579
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/06/1980
From: Brittain P
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
TXX-3173, NUDOCS 8008120459
Download: ML19331B579 (1)


Text

TEXAS UTILITIES GENERATING COMPANY 2003 URYAN TOWER

  • DALIAM.TEXA8 76201 August 6, 1980 nanY o. BRITTAIN

,.c or,.1 TXX-3173 Mr. W. C. Seidle, Chief Reactor Construction & Engineering

,i Support Branch U. S. Nuclear Regulatory Comission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket Nos. 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION WELDED CONDUIT SUPPORTS FILE N0:

10110

Dear Mr. Seidle:

i This letter corrects our report TXX-3166 dated July 25, 1980. The date this matter t: s verbally reported to your Mr. R. G. Taylor, in accordance with 10 CFR 50.55(e), should have read November 15, 1979, rather t' nan February 29, 1980.

If there are any questions, please advise.

J Very ruly our,

./ W.

P G. Brittain PGB:dk cc: NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies) c/o Distribution Services Branch, DDC, ADM.

U. S. Nuclear Regulatory Commission Washington, D. C.

20555 I

8008120454