TXX-3162, Updates 800421 Deficiency Rept Re Discrepancies Involving Installation & Insp Requirements for Class 5 non-nuclear safety-related Piping Supports.Fsar Is Being Revised.Final Rept Will Be Forwarded by 800922

From kanterella
(Redirected from TXX-3162)
Jump to navigation Jump to search
Updates 800421 Deficiency Rept Re Discrepancies Involving Installation & Insp Requirements for Class 5 non-nuclear safety-related Piping Supports.Fsar Is Being Revised.Final Rept Will Be Forwarded by 800922
ML19320D426
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/14/1980
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
References
TXX-3162, NUDOCS 8007210352
Download: ML19320D426 (1)


Text

-_

TEXAS UTILITIES GENERATING COMPANY 2001 BHYAN TOWIM = DALLAS. TEXAS 96201 dy]y 14, 198Q R. J. GARY "50" WC0~

TXX-3162

-Mr. W. C. Seidie, Chief Reactor Construction & Engineering Support Branch U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket Nos. 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION CLASS V PIPING SUPPORTS FILE N0:

10110

Dear Mr. Seidle:

This report updates our letter TXX-3127, dated April 21, 1980, relative to discrepancies involving installation and inspection requirements for Class V non-nuclear safety-related piping supports.

Revisions to both the FSAR and project specifications are being drafted to clarify the CPSES Class V program.

This work activity has been stopped pending a completion of the evaluation.

We anticipate implementing these changes and issuing a final report by September 22, 1980.

Very truly yours, A

R.

. Gary RJG:dk cc: NRC Region IV (0 + 1 copy)