Provides Status of Interim Deficiency Rept Re Installation & Insp Requirements for Class V non-nuclear safety-related Piping Supports.Final Rept Will Be Forwarded by 800715
ML19309F398
Person / Time
Site: Comanche Peak  
Issue date: 04/21/1980
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
TXX-3127, NUDOCS 8004290411
Download: ML19309F398 (1)


Text

80 04290 Y//

TENAS UTILITIES GENERATING CO.ilIMNY 200 navas rowen. naurs.Tsxas n20.

April 21, 1980 R. J. GARY

'" Z R /.?'::','t,' '

TXX-3127 Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch i

U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket Nos. 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION CLASS V PIPING SUPPORTS FILE N0:

10110

Dear Mr. Seidle:

In accordance with the requirements of 10 CFR 50.55(e), this letter provides the status of an apparent discrepancy involving installation and inspection requirements for Class V non nuclear safety-related piping supports, that was discovered between the CPSES Final Safety Analysis Report and the applicable project specifications. The matter was reported verbally to your Mr. R. G. Taylor on November 20, 1979.

We are continuing with our evaluation of the mattar and should be in a position to file a formal repc-t by July 15, 1980.

I Very truly yours, R.

. Gary RJG:ljj cc: NRC Region IV (0 + 1 copy)