TXX-3003, Notifies That Subsequent Evaluation of Problem W/Two Pressure Transmitters Has Been Determined Reportable Under 10CFR50.55(e)
| ML19246A574 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/25/1979 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| TXX-3003, NUDOCS 7907030382 | |
| Download: ML19246A574 (1) | |
Text
TENAS 1:TILITIES GENER? TING CO.TIIMNY 2001 HitYAN 70% ER DALLAR T14XAfs 75201 June 26, 1979 TXX-3003 a ;ca-v
".'?
. :...'.' * " '. l,':'
Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. fiuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket f;os. 50-445 Arlington, Texas 760'2 50-446 COMAtlCHE PEAK STEAM ELECTRIC STATION 1981-83 2300 MW IllSTALLATION PRESSURE TRANSMITTERS FILE NO. 10110
Dear Mr. Seidle:
On June 13, 1979, we verbally informed your 11r. R. G. Taylor, CPSES Resident Inspector, of a problem with two pressure transmitters at CPSES, that we were evaluating as a "potentially" reportable deficiency within the defini-tion of 'O CFR 50.55(e). Subsequent evaluation determined that the trans-nitters in question were non-IE and therefore not subject to the requirements of 10 CFR 50.55(e).
If you have any further questions, please advise.
Very truly yours,
/
R.'J. Gary RJ3:dla cc: NRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 79070303F2_