TXX-2905, States Utils Determination That the Design of Seismic Restraint for SVC Water Pump Is Not Reportable Under 10CFR50-55(e) as a Design Deficiency.Supporting Records Are Available at the CPSES Site
| ML20197D149 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/10/1978 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| TXX-2905, NUDOCS 7811210401 | |
| Download: ML20197D149 (1) | |
Text
TENAS UTil.lTIES GENERATING CO3IlnNY uoono nwn au n. o m wnm. win f(avember 10, 1978 1XX-2905
";;;: % ? = ll:'
Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch V. S. fluclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket"Mos. 50-445 Arlington, Texas 76011 50-446 I
COMANCHE PEAX STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION SERVICE WATER PUMP SEISMIC RESTRAINT FILE NO. 10110 1
Dear Mr. Seidle:
On October 6,1978 we notified you by telephone that a question on the design of the seismic restraint for the Service Water Pump might be potentially reportable under 10 CFR 50.55(e).
We submitted an interim ~ report logged TXX-2900 dated November 1,1978.
We have com-pleted our evaluation of the design deficiency and have determined it is not reportable under 10 CFR 50.55(e).
Records supporting these
' determinations are available for your inspector's review at the CPSES sito.
Very truly yours,
,kf 44 #
R.
. Gary RJG:dla cc:
Director, Office of Inspection and Enforcement (15)
Director, Office of Management Information and Program Control (1)
U. S, Nuclear Regulatory Commission Washington, D. C.
20555 7811210s/ o /
5 g
O7 (Q i
,