TAC:73784
From kanterella
Jump to navigation
Jump to search
Request for: Approved, Closed | |
| From | |
MONTHYEAR05000302/LER-1989-008, :on 890222,determination Made That Plant Being Operated Outside Design Bases.Caused by Personnel Error. Isolation Valve for Each Steam Trap Reopened.Revised Dose Analysis & Results Will Be Incorporated in Rev to FSAR1989-05-23023 May 1989
[table view]
ML20247K5531989-09-15015 September 1989 Advises That If Util Revises FSAR to Account for Revised Steam Generator Tube Rupture Mitigation Emergency Operating Procedure 10CFR50.59,NRC Will Review Evaluation as Part of Periodic Review of 10CFR50.59 Changes 1989-05-23 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:73784&oldid=3217146"