TAC:71445
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
Initiation
Questions Answers Results
Other: GO2-82-800, Forwards Corrections & Clarifications to Amend 23 to FSAR Section 8.3 Re Onsite Power Sys.Next FSAR Amend Will Be Revised to Include Encl Corrections, GO2-88-244, Requests Discretionary Enforcement Re Tech Spec 3/4.3.3 Re ECCS Actuation Instrumentation & Applicability Spec 3.0.3 for 24 H Period Beginning 881121, GO2-88-261, Provides Description of Decision Process Used to Determine Channel Functional Test Boundaries for Second Level Undervoltage Protection Utilized at Facility, ML17277A740, ML17285A078, ML17285A124, ML17285A160 | |
| From | |
MONTHYEARGO2-82-800, Forwards Corrections & Clarifications to Amend 23 to FSAR Section 8.3 Re Onsite Power Sys.Next FSAR Amend Will Be Revised to Include Encl Corrections1982-09-22022 September 1982
[table view]Forwards Corrections & Clarifications to Amend 23 to FSAR Section 8.3 Re Onsite Power Sys.Next FSAR Amend Will Be Revised to Include Encl Corrections ML17277A7401983-08-0909 August 1983 Forwards List of Outstanding SER Licensing Issues to Be Resolved Before OL Issuance GO2-88-244, Requests Discretionary Enforcement Re Tech Spec 3/4.3.3 Re ECCS Actuation Instrumentation & Applicability Spec 3.0.3 for 24 H Period Beginning 8811211988-11-21021 November 1988 Requests Discretionary Enforcement Re Tech Spec 3/4.3.3 Re ECCS Actuation Instrumentation & Applicability Spec 3.0.3 for 24 H Period Beginning 881121 ML17285A0781988-11-22022 November 1988 Informs That No Further Action Planned on 881121 Request for Enforcement Discretion Re Tech Spec 3.0.3.Surveillance Testing of Time Delay Relays Completed & Enforcement Discretion No Longer Requested,Per Telcon W/Util ML17285A1241988-12-0505 December 1988 Confirms NRR Position on Interpretation of Monthly Channel Functional Test of 4.16 Kv Emergency Bus Undervoltage (Degraded Voltage) Protection Circuitry (Tech Spec 3/4.3.3 ECCS Actuation Instrumentation Table 4.3.3.1-1,Item D.2) GO2-88-261, Provides Description of Decision Process Used to Determine Channel Functional Test Boundaries for Second Level Undervoltage Protection Utilized at Facility1988-12-0707 December 1988 Provides Description of Decision Process Used to Determine Channel Functional Test Boundaries for Second Level Undervoltage Protection Utilized at Facility GO2-88-273, Application for Amend to License NPF-21,revising Tech Spec 3/4.3.3, ECCS Actuation..., Tables 3.3.3-1,3.3.3-2 & 4.3.3.1-1 to Clarify Testing Requirements & Capabilities Not Inherent in Approved Design.Affidavit Encl.Fee Paid1988-12-21021 December 1988 Application for Amend to License NPF-21,revising Tech Spec 3/4.3.3, ECCS Actuation..., Tables 3.3.3-1,3.3.3-2 & 4.3.3.1-1 to Clarify Testing Requirements & Capabilities Not Inherent in Approved Design.Affidavit Encl.Fee Paid ML17285A1601988-12-21021 December 1988 Proposed Tech Spec Tables 3.3.3-1,3.3.3-2 & 4.3.3.1-1 Re ECCS Actuation Instrumentation,Clarifying Testing Requirements & Capabilities of Divs 1,2 & 3 Loss of Power Trip Functions,Per Approved Design ML17285A1991989-01-0505 January 1989 Summary of 881215 Meeting W/Util at Site Re Surveillance of Degraded Voltage Protection Circuitry at Facility 1988-11-22 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:71445&oldid=5096561"