TAC:67081
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
| From | |
MONTHYEARB12820, Proposed Tech Spec 4.7.6.1.e.3 Re Test Method for Control Room Air in-leakage1988-02-0909 February 1988
[table view]Proposed Tech Spec 4.7.6.1.e.3 Re Test Method for Control Room Air in-leakage ML20196C5761988-02-0909 February 1988 Application for Amend to License DPR-65,revising Tech Specs Re Test Method for Control Room Air in-leakage.Fee Paid ML20149L5901988-02-12012 February 1988 Amend 125 to License DPR-65,modifying Tech Spec 4.7.6.13.e.3 & Deleting Requirement That Control Room Air Inleakage Be Measured at Pressure Differential of 1/16 Inch Water Gauge ML20149L5921988-02-12012 February 1988 Safety Evaluation Supporting Amend 125 to License DPR-65 1988-02-12 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:67081&oldid=3344265"