TAC:54596
From kanterella
(Redirected from TAC:54597)
Jump to navigation
Jump to search
Request for: Open | |
Questions Answers | |
From | |
MONTHYEARML20079P8701983-05-0404 May 1983
[table view]Application to Amend Licenses DPR-24 & DPR-27,consisting of Tech Spec Change Request 91 Re Limiting Conditions for Operation Requiring Both RHR Loops Be Operable Unless Reactor Sys Is in Refueling Shutdown Condition ML20080J9901984-02-0606 February 1984 Requests Repeal of 791130 & 800103 Confirmatory Orders Re Provisions for Operation Pertaining to Steam Generator Tubes.Steam Generator Lower Assemblies Replaced ML20081C1531984-03-0505 March 1984 Advises That,Due to Delays in Delivery & Installation of Auxiliary Safety Instrumentation Panels (Asips),Installation of Six Accident Monitors Addressed in NUREG-0737,Items II.F.1.1 Through II.F.1.6 Will Not Be Completed by 840630 ML20092N6521984-06-26026 June 1984 Advises That,Due to Delays in Final Fabrication & Delivery of Auxiliary Safety Instrumentation Panels,Per , Panels Will Be Delivered in Sequence Which Best Enables Installation to Proceed ML20092P3341984-06-29029 June 1984 Lists Measures Implemented to Minimize Schedule Delays of post-TMI NUREG-0737,Items II.F.1.1 - 6,per 840626 Request, Including Timely QA Insps of Panel Welding & Detailed pre- Installation Plans & Preparation Procedures ML20101M5831984-12-26026 December 1984 Confirms Position That Application for Amend to License Concerning Request for Mod of Dates Contained in Commission 830712 Confirmatory Order Unnecessary,Because of Ruling That Confirmatory Order Conditions Not License Conditions ML20101M4101984-12-28028 December 1984 Informs That Accident Monitors Addressed by NUREG-0737,Items II.F.1.3 - II.F.1.6 Installed on Panels in Control Room, Powered by Interim Safety Grade Power Supplies & Accepted for Use by Plant Operations as of 841228 1984-02-06 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:54596&oldid=3481702"